Lot – 22 Medihub RFI Response To Satisfy condition 9. Of Information Request on Application OPW22/0303 Provide additional detail on the proposed construction methodology for the construction of the excavation and the basement retaining structures. Please note that the works must not impact on any adjoining infrastructure, buildings or vegetation. All retaining works and anchors systems, both above and below ground, both temporary or permanent, must be wholly contained within the subject site. 1. Site to be fenced and secure. 2. Piling platform to be constructed to engineered drawings. 3. 65 No. 750mm diameter reinforced piles to installed to a depth of approximately 8m below existing ground level. 4. A 900mm x 1000mm capping beam will be installed on top of the piles to match new finished levels.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
Continued:
5. Excavation of the basement to the underside of capping beam level.
6. Bracing installed to support the structure during construction.
7. Excavation to be continued in approximately 2-3m increments to allow steel and shotcrete
to be installed.
8. Repeat methodology until underside of bottom basement slab RL is reached.
NOTE:
This methodology does not incorporate any anchors within the site or encroaching into neighboring
properties. It will not have any adverse effect on adjoining infrastructure, buildings or vegetation.