Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
All activities
Car Parking
PO11 AO11
Sufficient car parking is available to accommodate the number Parking is provided in accordance with Table 9.4.2.4 of the
and type of vehicles likely to be generated by the use on site. Driveways and Parking Code.
Extractive Industry 9.3.10.3 Criteria for assessable development assessment (part)
Performance outcomes Acceptable outcomes
Extractive Industry
Demand for extracted material
PO12 No acceptable outcome provided
Development for extractive industry services a demonstrated local
community demand for the extracted material.
Location
PO13
Extractive industry locates in an Extractive Resource Processing No acceptable outcome provided
Area identified on the Extractive Resource Overlay Maps
PO14
Extractive industry is sited to not cause conflict with incompatible No acceptable outcome provided
or sensitive land uses.
PO15
Extractive industry in proximity to the Noosa River system only No acceptable outcome provided
occurs where—
(a) there is a clear demonstrated need;
(b) no feasible and prudent alternatives are available; and
(c) it can be demonstrated that the intrinsic natural values and
resources of the river system can be managed and
protected in an ecologically sustainable manner.
Haulage routes
PO16
Haulage routes associated with extractive resources: No acceptable outcome provided
(a) are located on roads where the haulage route will maintain
the safety of the road network and minimise adverse
impacts on premises within the transport route, particularly
residential and urban residential amenity;
(b) avoid conflicts with other land uses;
(c) are located on roads which are of adequate construction
and which may be upgraded as part of the utilisation of the
extractive resource; and
(d) are adequately maintained as a part of the utilisation of the
extractive resource.
PO17
The utilisation of any extractive resource or the rehabilitation of the No acceptable outcome provided
site does not result in adverse visual impacts from major roads.
Vehicle access and manoeuvring
PO18 No acceptable outcome provided
Vehicle access to, from, and within the extractive industry site:
(a) is adequate for the type and volume of traffic to be
generated;
NOOSA PLAN 2020 Page 60 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.