Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable outcomes
(b) does not create or worsen any traffic hazard;
(c) ensures disturbance to surrounding land uses is minor
and that impacts from emissions are minimised; and
(d) ensures no tracking of sediment or material onto the road
network results from the transport of materials associated
with the haulage of extractive resources.
Site planning
PO19 No acceptable outcome provided
The design, operation and staging of the extractive industry
promotes the efficient utilisation of the resource.
PO20
The design, operation and staging of the extractive industry No acceptable outcome provided
mitigates vibration, noise, dust, lighting and other impacts on the
surrounding area.
PO21
The design, operation and staging of the extractive industry avoids No acceptable outcome provided
and minimises impacts on ecologically important values to the
greatest extent and where impacts cannot be avoided, the loss or
decrease in values is minimised or offset.
PO22
The design and operation of the extractive industry minimises and No acceptable outcome provided
mitigate impacts on natural fluvial processes and river bank
stability.
PO23
The design, operation and staging of extractive industry optimises No acceptable outcome provided
potential alternative land uses after the cessation of extractive
activities.
PO24
The design, operation and staging of the extractive industry has No acceptable outcome provided
regard to the visual character of the locality
Buffers, Separation and Amenity
PO25 No acceptable outcome provided
The extractive industry is located on a site which has sufficient
area to provide adequate setback of operations from road
frontages, site boundaries, surrounding residential uses and
other sensitive receptors, such that the extractive industry
achieves an acceptable standard of visual amenity and control
over noise, light, dust and vibration impacts.
PO26
The extractive industry is adequately separated from sensitive No acceptable outcome provided
uses to minimise potential for nuisance.
PO27
The extractive industry provides onsite drainage that is designed, No acceptable outcome provided
constructed and maintained to:
(a) avoid erosion;
(b) prevent pollution of groundwater and surface water;
(c) protect downstream water quality;
(d) mitigate the potential adverse impacts on the storage
capacity volume of a floodplain;
(e) prevent additional flooding or inundation; and
(f) provide opportunities to recycle water for reuse in
processing, washing and/or screening of materials, dust
NOOSA PLAN 2020 Page 61 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.