Skip to the record
Every meeting, every word.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                                  Acceptable outcomes
  (b)    does not create or worsen any traffic hazard;
  (c)    ensures disturbance to surrounding land uses is minor
         and that impacts from emissions are minimised; and
  (d)    ensures no tracking of sediment or material onto the road
         network results from the transport of materials associated
         with the haulage of extractive resources.

  Site planning
  PO19                                                                  No acceptable outcome provided
  The design, operation and staging of the extractive industry
  promotes the efficient utilisation of the resource.
  PO20
  The design, operation and staging of the extractive industry          No acceptable outcome provided
  mitigates vibration, noise, dust, lighting and other impacts on the
  surrounding area.
  PO21
  The design, operation and staging of the extractive industry avoids No acceptable outcome provided
  and minimises impacts on ecologically important values to the
  greatest extent and where impacts cannot be avoided, the loss or
  decrease in values is minimised or offset.
  PO22
  The design and operation of the extractive industry minimises and No acceptable outcome provided
  mitigate impacts on natural fluvial processes and river bank
  stability.
  PO23
  The design, operation and staging of extractive industry optimises No acceptable outcome provided
  potential alternative land uses after the cessation of extractive
  activities.
  PO24
  The design, operation and staging of the extractive industry has      No acceptable outcome provided
  regard to the visual character of the locality
  Buffers, Separation and Amenity
  PO25                                                                  No acceptable outcome provided
  The extractive industry is located on a site which has sufficient
  area to provide adequate setback of operations from road
  frontages, site boundaries, surrounding residential uses and
  other sensitive receptors, such that the extractive industry
  achieves an acceptable standard of visual amenity and control
  over noise, light, dust and vibration impacts.
  PO26
  The extractive industry is adequately separated from sensitive        No acceptable outcome provided
  uses to minimise potential for nuisance.
  PO27
  The extractive industry provides onsite drainage that is designed,    No acceptable outcome provided
  constructed and maintained to:
  (a)    avoid erosion;
  (b)    prevent pollution of groundwater and surface water;
  (c)    protect downstream water quality;
  (d)    mitigate the potential adverse impacts on the storage
         capacity volume of a floodplain;
  (e)    prevent additional flooding or inundation; and
  (f)    provide opportunities to recycle water for reuse in
         processing, washing and/or screening of materials, dust


NOOSA PLAN 2020                                                                                          Page 61 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.