Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                                  Acceptable Outcomes
  with unsightly elements screened from view by walls and               (a)   the use has front fences or walls designed and sited to
  landscaping.                                                                contribute to the attractiveness of the streetscape and be
                                                                              compatible with the existing streetscape character;
                                                                        (b)   front fences or walls are setback an average of 1 metre and
                                                                              are articulated to provide visual interest by stepping the
                                                                              design at a maximum of 5 metre intervals; and
                                                                        (c)   planting is provided between the road reserve and any
                                                                              fencing, without creating an impediment for pedestrians
                                                                              using the footpath.

  PO9
  The generation of spill light by development, avoids significant      No acceptable outcome provided
  annoyance, discomfort, distraction or a reduction in the ability to
  see essential information.

  Editor’s Note:­ Refer to Section 3 of AS4282 The Control of the
  Obtrusive Effects of Outdoor Lighting for advice in relation to the
  design, installation and maintenance of lighting.


 Safety and security             Table 9.3.11.3 Criteria for assessment (part)
  Performance outcomes                                                  Acceptable Outcomes

  Safety and security
  PO10
  Infrastructure activities avoid or effectively manage emissions of No acceptable outcome provided
  light, noise, vibration or radiation beyond the site such
  that environmental nuisance to occupants or users of surrounding
  premises is not caused.
  PO11                                                                  AO11
  Unacceptable risks to public safety are avoided.                      Public and unauthorised access is restricted.


 Environmental Management                     Table 9.3.11.3 Criteria for assessment (part)
  Performance outcomes                                                  Acceptable Outcomes

  Environmental Management
  PO12
  Infrastructure activities are designed, constructed and operated in No acceptable outcome provided
  a manner that:
  (a)    minimises energy use and greenhouse gas emissions;
  (b)    minimises the use of water; and
  (c)    maximises the re­use and recycling of by­products
         associated with the operation of the utility.

  PO13
  There are no significant adverse effects on the biodiversity, natural No acceptable outcome provided
  vegetation, native wildlife, habitats, landscape quality, water quality
  or heritage values, including those related to:
  (a)    changes to natural drainage;
  (b)    disturbance to any of the wetland systems;
  (c)    management of landslide and fire risk;
  (d)    erosion and the transport of sediments offsite;
  (e)    unmanaged public access;


NOOSA PLAN 2020                                                                                                                  Page 65 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.