Skip to the record
Accept no imitations.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 9.4.2.2           Purpose and Overall Outcomes
 (1)    The purpose of the Earthworks code is to ensure earthworks do not unreasonably impact on the natural environment or
        other properties and provide a safe and secure work environment.
 (2)    The overall outcomes sought for the Earthworks code are:
        (a)   Earthworks are designed and constructed to be structurally sound.
        (b)   All onsite works provide land stability (including differential settlement or expansion in reactive soils).
        (c)   Earthworks avoid contamination of land.
        (d)   Flooding and drainage are appropriately addressed.
        (e)   Groundwater, watercourses and wetlands are protected.
        (f)   The loss of native remnant or regrowth vegetation is avoided.




  Table 9.4.2.3 ­ Criteria for assessment

 Effects of works          Table 9.4.2.3 Criteria for assessment (part)
  Performance outcomes                                               Acceptable Outcomes
  Assessable Development

  Effects of works
  Drainage
  PO1                                                                AO1
  Finished surface levels ensure land is free draining.              Filled or excavated areas have a minimum gradient of 0.5%
                                                                     and drain to Council’s stormwater infrastructure where
                                                                     available, or where stormwater infrastructure is not available,
                                                                     toward the street.
  Hydraulics
  PO2
  Change to the levels on site do not have an adverse impact on No acceptable outcome provided
  the flooding and drainage characteristics off­site.
  Geotechnical considerations
  PO3                                                                AO3.1
  Earthworks do not result in geotechnical instability on­site or    Filling works are undertaken in accordance with Council’s
  to nearby premises.                                                Planning Scheme Policy PSP6 Engineering design standards
                                                                     ­ roads, drainage and earthworks.

                                                                     AO3.2
                                                                     Where the filling is for residential, commercial or industrial
                                                                     purposes the works comply with Australian Standard ­
                                                                     Guidelines for earthworks on commercial & residential
                                                                     development.
  Local amenity
  PO4                                                                AO4.1
  Undertaking earthworks does not adversely impact on the            The following control measures are implemented—
  amenity of the local area by way of dust, noise or visual          (a)    regular water spraying of exposed areas to suppress
  amenity.                                                                  dust;
                                                                     (b)    provision of dust stabilised or sealed internal roads;
                                                                     (c)    protective covering of exposed areas that are left for

NOOSA PLAN 2020                                                                                                              Page 91 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.