Log in to see the plans as drawn 9.4.2.2 Purpose and Overall Outcomes
(1) The purpose of the Earthworks code is to ensure earthworks do not unreasonably impact on the natural environment or
other properties and provide a safe and secure work environment.
(2) The overall outcomes sought for the Earthworks code are:
(a) Earthworks are designed and constructed to be structurally sound.
(b) All onsite works provide land stability (including differential settlement or expansion in reactive soils).
(c) Earthworks avoid contamination of land.
(d) Flooding and drainage are appropriately addressed.
(e) Groundwater, watercourses and wetlands are protected.
(f) The loss of native remnant or regrowth vegetation is avoided.
Table 9.4.2.3 Criteria for assessment
Effects of works Table 9.4.2.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Assessable Development
Effects of works
Drainage
PO1 AO1
Finished surface levels ensure land is free draining. Filled or excavated areas have a minimum gradient of 0.5%
and drain to Council’s stormwater infrastructure where
available, or where stormwater infrastructure is not available,
toward the street.
Hydraulics
PO2
Change to the levels on site do not have an adverse impact on No acceptable outcome provided
the flooding and drainage characteristics offsite.
Geotechnical considerations
PO3 AO3.1
Earthworks do not result in geotechnical instability onsite or Filling works are undertaken in accordance with Council’s
to nearby premises. Planning Scheme Policy PSP6 Engineering design standards
roads, drainage and earthworks.
AO3.2
Where the filling is for residential, commercial or industrial
purposes the works comply with Australian Standard
Guidelines for earthworks on commercial & residential
development.
Local amenity
PO4 AO4.1
Undertaking earthworks does not adversely impact on the The following control measures are implemented—
amenity of the local area by way of dust, noise or visual (a) regular water spraying of exposed areas to suppress
amenity. dust;
(b) provision of dust stabilised or sealed internal roads;
(c) protective covering of exposed areas that are left for
NOOSA PLAN 2020 Page 91 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.