Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                               Acceptable Outcomes
                                                                           more than 2 weeks; and
                                                                     (d)   unless a development permit provides otherwise,
                                                                           disturbed areas are revegetated using species identified
                                                                           in Council's Planning Scheme Policy PSP2
                                                                           Landscaping.

                                                                     AO4.2
                                                                     Earthworks are undertaken only during the hours of 7:00am to
                                                                     6:00pm, Monday to Friday and 7:00am to 3:00pm on
                                                                     Saturday. No work is undertaken on Sunday or public
                                                                     holidays.
  Vegetative waste
  PO5                                                                AO5.1
  Vegetation cleared from a development site is disposed of in       Cleared vegetation is transported off­site for disposal in an
  an environmentally responsible manner.                             approved green waste disposal facility.

                                                                     AO5.2
                                                                     Cleared vegetation is mulched on­site and reused for
                                                                     landscaping of the finished development.

                                                                     AO5.3
                                                                     Cleared vegetation is disposed of for the purpose of firewood.

                                                                     AO5.4
                                                                     Disposal of vegetative waste by burning off is avoided.
  Managing contamination risk
  PO6                                                                AO6.1
  Materials used as fill are suitable for development and future     Fill material is solid clean earth, free of putrescible or refuse
  use of the land and filling or excavation works do not result in   material, vegetation, acid sulfate soils, building or construction
  the contamination of land.                                         material or other material or contaminants.

                                                                     AO6.2
                                                                     The site is not on the contaminated land register.
  Haulage activity and amenity
  PO7
  Haulage of material to and from a site ensures—                    No acceptable outcome provided
  (a)    minimal disturbance to neighbouring properties and
         properties along the haulage route; and
  (b)    Council’s road infrastructure including pavements is not
         adversely affected.

  Extent of earthworks
  PO8                                                                AO8
  The layout of the development provides adequate, clearly           All earthworks, including cut and fill batters, retaining walls
  defined and easily accessible—                                     and the like are contained within the subject site.
  (a)    on­site vehicle parking and manoeuvring areas; and
  (b)    loading and manoeuvring areas for delivery and service
         vehicles.




NOOSA PLAN 2020                                                                                                               Page 92 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.