Skip to the record
Search everything, all in one place.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                                   Acceptable Outcomes
                                                                               provide screening and softening to all levels of building
  (c)    provide appropriate levels of shade and sunlight to
                                                                               bulk, parking areas, manoeuvring, loading areas and open
         occupants of the development throughout the year;                     stormwater treatment infrastructure.
  (d)    minimise the demand for water use;
  (e)    do not cause potential damage to buildings or                   AO10.2
         structures;                                                     For landscaping around pool areas—
  (f)    are not harmful to pedestrians, particularly around             (a)   no more than 25% of the landscaping is with exotic plant
         schools, childcare centres, shopping areas and other                  species, provided none of the plant species are
         high pedestrian areas;                                                undesirable plants identified in PSP2 Landscaping; and
                                                                         (b)   palms are specifically located in group plantings in
  (g)    in intensively used environments, can endure high levels
                                                                               accordance with PSP2 Landscaping plants.
         of activity;
  (h)    do not attract wildlife to high risk areas; and
                                                                         AO10.3
  (i)    reduce the visual impact of the development including           Koala food trees are not planted in close proximity to the
         any stormwater treatment infrastructure.                        major road network.


  Car Parks
  PO11                                                                   AO11.1
  Landscaping of car parking areas is designed to—                       One advanced canopy tree (a minimum of 45 litres pot size) is
  (a)    reduce the visual impact of the development, softening the      provided for every 4 car parking spaces.
         appearance of hardstand areas;
  (b)    define parking areas;                                           AO11.2
         provide advanced canopy trees to shade vehicles and to          A minimum area of 5m² around the base of each canopy tree,
  (c)
         reduce reflected radiation;                                     is treated with a porous surface such as mulch with
                                                                         groundcovers and protected from intrusion of vehicles.
  (d)    maximise opportunities for infiltration of rainwater on­site;
         and
                                                                         AO11.3
  (e)    minimise contaminated runoff entering the stormwater
         system and a watercourse.                                       Runoff from car parking areas is directed to landscaped areas
                                                                         to minimise contaminated runoff, including hydrocarbons,
                                                                         entering the stormwater system and watercourses.

                                                                         AO11.4
                                                                         Canopy trees are protected from vehicle damage by providing
                                                                         adequate sized garden beds.

                                                                         AO11.5
                                                                         Plants with thorns, fruit or berries are avoided in car parks.

                                                                         Editor's note— Refer to Figure AP3­5B
  Services, utilities and infrastructure
  PO12                                                                   AO12.1
  Vegetation does not pose a risk to the safety or reliability of        Vegetation planted within the easement of an overhead powerline
   services, utilities or infrastructure including substations,          or, where there is no easement, the area of influence of a
  overhead powerlines, power poles and transformers, street              powerline, has a mature height of no more than 3.5 metres.
  lamps, stormwater catchment pits, and underground services
                                                                         AO12.2
  and utilities.                                                         Vegetation planted within an underground powerline easement
                                                                         does not have a mature root system in excess of 150 millimetres
                                                                         in depth and is not located directly over the powerline.

                                                                         AO12.3
                                                                         Regardless of the width of the easement, vegetation adjoining



NOOSA PLAN 2020                                                                                                                 Page 100 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.