Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
easements must be separated from the power pole or other
infrastructure by a distance at least equal to the maximum mature
height of the vegetation.
AO12.4
For power lines that connect to a premises, the height of plant
species at maturity provides for a 2 metre clearance below the
power line.
AO12.5
With the exception of electricity infrastructure, trees and large
shrubs are located a minimum of—
(a) 4 metres from street lamps;
(b) 2 metres from stormwater catchment pits; and
(c) 2 metres from underground services and utilities.
AO12.6
Plants are located to enable tradespersons to access, view
and inspect service meters, such as water and electricity
meters.
AO12.7
Root barriers are installed around trees that are located within
3 metres of any infrastructure or that have potentially invasive
roots.
Landscaped entry statement
PO13 AO13.1
Entry statements to residential or business estates are: Tree and plant massing are the dominant features of entry
statements, rather than the entry being dominated by built
(a) integrated with the natural landscape character of the elements such as masonry walls, waterfalls and assembled rock
locality; and outcrops.
(b) require low maintenance.
AO13.2
Landscaped entry statements are low maintenance and located
entirely within privately owned land.
Editor's note—Refer to Figure 9.4.5.5
PO14
Landscaping in the road reserve, parkland or any land intended to No acceptable outcome provided
transfer to public ownership or Council responsibility is low
maintenance.
Figure 9.4.5.4 Safety & Security
NOOSA PLAN 2020 Page 101 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.