Skip to the record
Search everything, all in one place.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                            Acceptable Outcomes
                                                                  easements must be separated from the power pole or other
                                                                  infrastructure by a distance at least equal to the maximum mature
                                                                  height of the vegetation.

                                                                  AO12.4
                                                                  For power lines that connect to a premises, the height of plant
                                                                  species at maturity provides for a 2 metre clearance below the
                                                                  power line.

                                                                  AO12.5
                                                                  With the exception of electricity infrastructure, trees and large
                                                                  shrubs are located a minimum of—
                                                                  (a)   4 metres from street lamps;
                                                                  (b)   2 metres from stormwater catchment pits; and
                                                                  (c)   2 metres from underground services and utilities.


                                                                  AO12.6
                                                                  Plants are located to enable tradespersons to access, view
                                                                  and inspect service meters, such as water and electricity
                                                                  meters.

                                                                  AO12.7
                                                                  Root barriers are installed around trees that are located within
                                                                  3 metres of any infrastructure or that have potentially invasive
                                                                  roots.
  Landscaped entry statement
  PO13                                                            AO13.1
  Entry statements to residential or business estates are:        Tree and plant massing are the dominant features of entry
                                                                  statements, rather than the entry being dominated by built
  (a)    integrated with the natural landscape character of the   elements such as masonry walls, waterfalls and assembled rock
         locality; and                                            outcrops.
  (b)    require low maintenance.
                                                                  AO13.2
                                                                  Landscaped entry statements are low maintenance and located
                                                                  entirely within privately owned land.

                                                                  Editor's note—Refer to Figure 9.4.5.5
  PO14
  Landscaping in the road reserve, parkland or any land intended to No acceptable outcome provided
  transfer to public ownership or Council responsibility is low
  maintenance.

 Figure 9.4.5.4 ­ Safety & Security




NOOSA PLAN 2020                                                                                                         Page 101 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.