Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
Editor’s Note — Queensland’s Department of Transport and Main
Roads, and the TransLink division within the Department have
design standards for public transport networks and infrastructure.
PO6 AO6.1
Development enhances connectivity between existing and future Development provides direct and convenient pathway linkages
public passenger transport facilities and other transport modes. between existing and future public passenger transport facilities.
AO6.2
Development provides wayfinding information for existing public
transport facilities and interconnecting transport modes.
Editor’s Note— Council has design standards that apply to
wayfinding signage.
Pedestrian and cycle infrastructure Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
Pedestrian and cycle infrastructure
PO7
Road planning and development designs for pedestrian and No acceptable outcome provided
cycle movements and provides for future connectivity and
integration with adjoining sites.
PO8 AO8
Development provides for cyclists on roads as required for each Roads provide for onroad cycling in accordance with the
category of road as identified in the Noosa Road Hierarchy. standards specified in Council’s Planning Scheme Policy PSP6
Engineering Design Standards – Roads, drainage and
earthworks.
PO9 AO9.1
Development is designed to encourage walking and cycling Pathway planning and design is in accordance with pedestrian
wherever possible over the use of private vehicles. and cycling aspects of Austroads Guides.
AO9.2
Attractive and safe pedestrian and cycle connections to and
through the site are provided with shade trees, graded walking
and cycle paths and lighting.
AO9.3
Pathways are provided to cater for shared use and cater for both
commuting and recreational usage.
AO9.4
Pathways have ramps at all kerbs designed for wheelchair and
pram access across roads.
AO9.5
Development has convenient and prominent pedestrian
entrances that:
(a) are orientated towards the street; and
(b) cater for universal access.
AO9.6
Pathways are adequately lit and have navigational signs.
NOOSA PLAN 2020 Page 109 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.