Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance Outcomes                                                 Acceptable Outcomes
                                                                       Pontoons are structurally capable of sitting on the sand bed.
                                                                       Rollers and bracing should account for this situation.

                                                                       AO13.11
                                                                       Jetties and pontoons are free standing and do not rely on
                                                                       connecting to any revetment wall or other structure.


 Design, Construction and Safety ­ Boat Ramps                          Table 9.4.9.3 Criteria for assessment (part)
  Performance Outcomes                                                 Acceptable Outcomes
  Design, Construction and Safety for Boat Ramps ­ prescribed tidal works outside Noosa Waters Estate
  PO14                                                                 AO14.1
  Boat ramps are designed and constructed to—                          Where there is an existing revetment wall—
  (a)    allow access by a wheeled boat trailer;                       (a)   the level of a boat ramp surface at the revetment wall is no
  (b)    ensure that unacceptable risks to personal and public               more than 150 millimetres above the top of the wall, not
         safety are unlikely to be caused;                                   more than 500 millimetres below the top of the wall and not
                                                                             more than 200 millimetres above the existing beach;
  (c)    avoid cluttering of the waterways;
                                                                       (b)   the ramp extends into the waterway no more than 9 metres
  (d)    avoid excessive traffic volumes within foreshore areas and          from a revetment wall;
         adjoining lands; and
                                                                       (c)   the ramp is constructed at a uniform grade no steeper than
  (e)    ensure that visual amenity of the foreshore is maintained.          20% (1 in 5); and
                                                                       (d)   the outer end of the ramp is no more than 100 millimetres
                                                                             above the level of the beach (Refer Figure 9.4.9.3E).

                                                                       AO14.2
                                                                       No part of the ramp is to extend closer than 1 metre to the
                                                                       prolongation of the boundaries.

                                                                       AO14.3
                                                                       The boat ramp surface profile is concave to allow concentration of
                                                                       water to the centre of the ramp.
  PO15
  No new boat ramps are constructed within the Noosa River             No acceptable outcome provided.
  system.


 Character and amenity                Table 9.4.9.3 Criteria for assessment (part)
  Performance Outcomes                                                 Acceptable Outcomes
  Character and amenity ­ operational works within Noosa Waters Estate waterways
  PO16                                                                 AO16.1
  Works are designed and sited to ensure—                              For lots with watercourse frontage greater than 15 metres in width,
  (a)    they are contained within the prolongation of boundaries of   jetties are setback a minimum of 3 metres from the prolongation
         the lot;                                                      of the boundaries (Refer Figure 9.4.9.3A).

  (b)    that when a vessel is berthed it does not encroach over the
                                                                       AO16.2
         prolongation of boundaries of the lot;
                                                                       For lots with watercourse frontage less than 15 metres in width
  (c)    a high level of visual amenity is maintained when viewed      (including lots located in watercourse bends or at the head of the
         from the watercourse and adjoining lands;                     watercourse)—
  (d)    the works avoid conflicts with uses in the water, on the      (a)   a joint application is made with the adjoining owner; or
         foreshore and adjoining lands;                                      where a joint application is not possible, jetties—
                                                                       (b)
  (e)    materials blend with the natural surrounds;                         (i)    are setback a minimum of 1 metres from the
  (f)    cluttering of watercourses is avoided;                                     prolongation of the boundaries;
  (g)    excessive traffic volumes within foreshore areas, on                (ii)   are not more than 1.5 metres in width;


NOOSA PLAN 2020                                                                                                                Page 124 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.