Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 (1)    The purpose of the Flood Hazard overlay code is to:
        (a)   provide for the assessment of the compatibility of development in the flood hazard overlay to flood and storm tide inundation
              risk, taking into account the predicted effects of climate change;
        (b)   ensure that risk to life, property, community, economic activity and the environment during flood and storm tide inundation
              events is avoided or mitigated; and
        (c)   ensure that development does not increase potential for flood damage on­site or to other property.

 (2)    The overall outcomes sought for the Flood Hazard overlay code are:
        (a)   Development in areas at risk from flood and storm tide inundation is compatible with the nature of the defined flood event or
              defined storm tide event.
        (b)   Development protects floodplains and the flood conveyance capacity of waterways.
        (c)   Development is resilient to flood and storm tide events by ensuring siting and design responds to and minimises potential
              risks of flood and storm tide inundation to people and property.
        (d)   Development directly, indirectly and cumulatively avoids an unacceptable increase in the extent or severity of flood or storm
              tide inundation and does not significantly increase the potential for damage on the site or to other properties.
        (e)   Development supports and does not unduly burden disaster management response or recovery capacity and capabilities.
        (f)   Development avoids the release of hazardous materials as a result of a flood event.
        (g)   Natural processes and the protective function of landforms and vegetation are maintained in flooding and inundation areas.

  Table 8.2.6.3 ­ Criteria for assessable development
  Performance outcomes                                                Acceptable outcomes

  Floodplain protection, immunity and safety ­ for development areas

  PO1                                                                 AO1
  Development provides that for all flood events up to and            The finished flood level is not less than the minimum design
  including the DFE :                                                 levels specified in Table 8.2.6.4
  (a)    the safety of people on the site is protected; and
  (b)    the risk of damage to property on the site is avoided or
         minimised as far as practicable.


  PO2                                                                 AO2
  All lots have sufficient area that is above the DFE flood level or  The minimum area above flood level (flood free area) for each lot,
  where modelling is not available, the highest recorded flood level, is in accordance with Table 8.2.6.5.
  to safely and adequately accommodate the intended use.


  PO3                                                                 AO3
  For reconfiguring a lot or operational works, development is        Development areas are not filled to reduce flood risk.
  undertaken in a manner that ensures:
  (a)    natural hydrological systems are protected from erosion,
         scour or flood damage on the premises or other premises;
  (b)    natural landforms and drainage lines are maintained to
         protect the hydraulic performance of waterways and flood
         plain; and
  (c)    development integrates with the natural landform rather
         than modifying the landform to suit the development as far
         as practicable.

  PO4                                                                 AO4.1
  For reconfiguring a lot, development does not compromise the        Development provides an effective evacuation route that remains
  safety of people resulting from the flood risk associated with      passable, with sufficient flood warning time, to enable people to
  events exceeding the DFE.                                           progressively evacuate to safe areas above the PMF in the face of
                                                                      advancing flood or waters for events that exceed the DFE.

                                                                      OR


NOOSA PLAN 2020                                                                                                                  Page 18 of 44
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.