Skip to the record
Search everything, all in one place.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                                 Acceptable outcomes
                                                                       drain and function safely during a flood event and power failure.

                                                                       Editor's note—Basements should have flood immunity above the
                                                                       1%AEP defined flood event with alternative means to mechanical
                                                                       pumping used to achieve such immunity.
  Disaster management

  PO7                                                                  AO7.1
  Development supports, and does not unduly burden, disaster           Development is located to support self­evacuation of people and
  management response or recovery capacity or capabilities.            ensure sufficient warning time for the nature of the use.

                                                                       AO7.2
                                                                       Development does not:
                                                                       (a)   increase the number of people calculated to be at risk from
                                                                             flooding;
                                                                       (b)   increase the number of people likely to need evacuation;
                                                                       (c)   shorten flood warning times for other uses in the floodplain;
                                                                             or
                                                                       (d)   impact on the ability of traffic to use evacuation routes, or
                                                                             unreasonably increase traffic volumes on evacuation
                                                                             routes.

                                                                       AO7.3
                                                                       Materials stored on site:
                                                                       (a)   are readily able to be moved in a flood event to a flood free
                                                                             area; or
                                                                       (b)   are contained in order to minimise movement in times of
                                                                             flood.

                                                                       Editor's Note— Businesses should ensure that necessary
                                                                       emergency and continuity plans are in place to account for the
                                                                       potential need to evacuate personnel and to relocate property
                                                                       prior to a flood event.
  Essential network infrastructure
  PO8                                                                  AO8
  Essential network infrastructure maintains effective function        Essential network infrastructure that is likely to fail to function or
  during and immediately after flood and storm tide inundation         may result in contamination when inundated by flood water (e.g.
  events.                                                              water supply pipeline air valves and the like) is located above the
                                                                       DFE level (or where the DFE has not been modelled for the area,
                                                                       above the highest recorded flood level for the area).
  Essential community infrastructure
  PO9                                                                  AO9.1
  Essential community infrastructure is able to function effectively   Essential community infrastructure is sited and constructed to
  during and immediately after flood events.                           ensure that flood levels comply with flood immunity requirements
                                                                       specified in Table 8.2.6.4.

                                                                       AO9.2
                                                                       Essential community infrastructure which is located below the
                                                                       specified flood immunity requirements:
                                                                       (a)   is designed and constructed to function effectively during
                                                                             and immediately after the recommended flood level event;
                                                                             and
                                                                       (b)   has direct access to low hazard evacuation routes or an
                                                                             emergency rescue area above the PMF; if it is for


NOOSA PLAN 2020                                                                                                                     Page 20 of 44
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.