Log in to see the plans as drawn Performance outcomes Acceptable outcomes
emergency services (including emergency shelters, police
facilities, hospitals and associated facilities).
Earthworks
PO10 AO10
Excavation and filling for operational works only occur where they: Filling, other than accessways:
(a) result in the protection, rehabilitation and repair of (a) does not extend more than the equivalent of 3 metres
ecologically important areas, watercourses, drainage lines around the main building, measured from the outer walls of
and wetlands; the building;
(b) do not adversely impact on the overall hydrology, hydraulics (b) is limited to a maximum of 500m2; and
and flood capacity of a waterway; (c) does not impact on the local drainage of adjoining
(c) do not directly, indirectly or cumulatively cause adverse properties.
impacts external to the site;
(d) do not cause increased flooding, which adversely affects
the safety or use of any land upstream or downstream;
(e) do not cause ponding of water on the site or nearby land;
(f) do not result in a reduction in flood storage capacity;
(g) do not adversely affect the flow of water in any overland flow
path; and
(h) do not adversely affect the privacy or visual amenity of
surrounding property.
Editor’s Note— The Earthworks Code sets out further
requirements for earthworks.
Hazardous materials
PO11 AO11.1
Development ensures that public safety and the environment are Materials manufactured or stored on site are not hazardous or
not adversely affected by avoiding the release of hazardous noxious, or do not comprise materials that may cause a
materials into flood waters and the environment. detrimental effect on the environment if discharged in a flood
event.
OR
AO11.2
If a DFE is adopted, structures used for the manufacture or
storage of hazardous material are located above the DFE level.
Editor’s Note— Refer to the Work Health and Safety Act 2011 and
associated Regulation and Guidelines, the Environmental
Protection Act 1994 and the relevant building assessment
provisions under the Building Act 1975 for requirements relating to
the manufacture and storage of hazardous substances.
Information is provided by Business Queensland on the
requirements for storing and transporting hazardous chemical.
Table 8.2.6.4 Flood Levels and Flood Immunity Requirements
Type of development Flood Level (Defined Flood Minimum design level – surface Minimum finished floor level
Event ) for a 2100 planning level
period
General
Business Activities 1% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
level level + 0.6m
NOOSA PLAN 2020 Page 21 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.