The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Type of development               Flood Level (Defined Flood        Minimum design level – surface Minimum finished floor level ­
                                    Event ) for a 2100 planning       level
                                    period
  Industrial Activities              1% AEP                           DFE/DSTE + 0.3m or                 DFE + 0.3m or Historical flood
                                                                      Historical flood level + 0.6m     level + 0.6m
  Accommodation Activities           1% AEP                           DFE/DSTE + 0.3m or                 DFE + 0.3m or Historical flood
  (excluding residential care                                         Historical flood level + 0.6m     level + 0.6m
  facility)
  Residential care facility          0.2% AEP                         DFE/DSTE or Historical flood       DFE + 0.3m or Historical flood
                                                                      level                             level + 1m
  Community Activities               0.2% AEP                         DFE/DSTE or Historical flood       DFE+ 0.3m or Historical flood
  (education establishment,                                           level                             level + 1m
  childcare centre)
  Essential community infrastructure (recommended flood level) Editor's note­ Some emergency services and police facilities
  (e.g. water police and search and rescue operations) are dependent on direct water access. The flood levels do not apply to these
  aspects but other operational areas should be located above the recommended flood level to the greatest extent feasible.

  Emergency services , other         0.2% AEP                          DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
  than police station                                                 level                             level + 1m
  Police facilities                  0.2% AEP                          DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
                                                                      level                             level + 1m
  Hospital and associated            0.2% AEP                          DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
  facilities                                                          level                             level + 1m
  Stores of valuable records or      0.5% AEP                          DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
  items of historical or cultural                                     level                             level + 1m
  significance
  Essential infrastructure (recommended flood level) Editor's note­ The recommended flood level only applies to electrical
  and other equipment that, if damaged by flood water or debris, would prevent the plant from functioning. This equipment should
  either be protected from damage or designed to withstand inundation.
  Major switch yard and              0.5% AEP                          DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
  substation                                                          level                             level + 1m
  Power facilities                   0.2% AEP                          DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
                                                                      level                             level + 1m
  Sewerage treatment plant           0.1% AEP                          DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
  equipment                                                           level                             level + 1m
  Water cycle management             0.5% AEP                          DFE/DSTE or Historical flood     DFE+ 0.3m or Historical flood
  infrastructure (water treatment                                     level                             level + 1m
  plant)
  Other Editor's note­ Minimum design levels for infrastructure apply to standalone infrastructure only. Where infrastructure is
  proposed as part of development, the minimum design levels nominated for that development category also apply to the
  associated infrastructure.
  Manufacture and storage of         1% AEP                           DFE/DSTE + 0.3m or                 DFE+ 0.3m or Historical flood
  hazardous materials in bulk                                         Historical flood level +1m        level + 1m
  Access roads and car parking       10% AEP                           DFE/DSTE + maximum                n/a
                                                                      inundation depth of 250mm
                                                                      during 1%AEP event at 2100
  Collector roads and above          1% AEP                            DFE/DSTE                          n/a
  Infrastructure other than          1% AEP                            DFE/DSFE or Historical flood      DFE + 0.3m or Historical flood

NOOSA PLAN 2020                                                                                                                Page 22 of 44
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.