Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Type of development Flood Level (Defined Flood Minimum design level – surface Minimum finished floor level
Event ) for a 2100 planning level
period
Industrial Activities 1% AEP DFE/DSTE + 0.3m or DFE + 0.3m or Historical flood
Historical flood level + 0.6m level + 0.6m
Accommodation Activities 1% AEP DFE/DSTE + 0.3m or DFE + 0.3m or Historical flood
(excluding residential care Historical flood level + 0.6m level + 0.6m
facility)
Residential care facility 0.2% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
level level + 1m
Community Activities 0.2% AEP DFE/DSTE or Historical flood DFE+ 0.3m or Historical flood
(education establishment, level level + 1m
childcare centre)
Essential community infrastructure (recommended flood level) Editor's note Some emergency services and police facilities
(e.g. water police and search and rescue operations) are dependent on direct water access. The flood levels do not apply to these
aspects but other operational areas should be located above the recommended flood level to the greatest extent feasible.
Emergency services , other 0.2% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
than police station level level + 1m
Police facilities 0.2% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
level level + 1m
Hospital and associated 0.2% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
facilities level level + 1m
Stores of valuable records or 0.5% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
items of historical or cultural level level + 1m
significance
Essential infrastructure (recommended flood level) Editor's note The recommended flood level only applies to electrical
and other equipment that, if damaged by flood water or debris, would prevent the plant from functioning. This equipment should
either be protected from damage or designed to withstand inundation.
Major switch yard and 0.5% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
substation level level + 1m
Power facilities 0.2% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
level level + 1m
Sewerage treatment plant 0.1% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical flood
equipment level level + 1m
Water cycle management 0.5% AEP DFE/DSTE or Historical flood DFE+ 0.3m or Historical flood
infrastructure (water treatment level level + 1m
plant)
Other Editor's note Minimum design levels for infrastructure apply to standalone infrastructure only. Where infrastructure is
proposed as part of development, the minimum design levels nominated for that development category also apply to the
associated infrastructure.
Manufacture and storage of 1% AEP DFE/DSTE + 0.3m or DFE+ 0.3m or Historical flood
hazardous materials in bulk Historical flood level +1m level + 1m
Access roads and car parking 10% AEP DFE/DSTE + maximum n/a
inundation depth of 250mm
during 1%AEP event at 2100
Collector roads and above 1% AEP DFE/DSTE n/a
Infrastructure other than 1% AEP DFE/DSFE or Historical flood DFE + 0.3m or Historical flood
NOOSA PLAN 2020 Page 22 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.