Original source · versioned page text
2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Column 1 Column 2 Column 3
Projection area LGIP Development Existing and projected nonresidential floor space (m2 GFA)
Type
Outside priority
Commercial 1,127 801 801 801 801
infrastructure area
(total) Industry 31,549 41,661 42,573 42,573 99,054
Community 52,642 57,562 57,748 57,748 58,979
Other 17,230 17,230 17,230 17,230 17,230
Total 109,239 125,495 127,093 127,593 186,755
Retail 256,747 258,869 270,967 293,264 346,260
Noosa Shire
Commercial 57,247 60,261 73,990 81,753 111,690
Industry 259,037 310,885 346,097 371,538 568,002
Community 311,637 333,423 348,279 353,591 383,396
Other 19,768 19,768 19,768 19,768 19,768
Total 904,436 983,206 1,059,100 1,119,914 1,429,116
Table SC3.1.6 Existing and projected demand for the stormwater network
Column 1 Column 3
Service catchment1 Existing and projected demand (imp ha)
Ultimate
2016 2021 2026 2031 Development
Coastal Area 808.49 840.16 908.16 951.16 1172.41
Cooroy 82.01 101.25 107.65 120.15 181.07
Boreen Point 10.63 10.92 11.72 13.00 14.66
Cooran 28.10 28.27 29.71 31.70 34.18
Pomona 60.20 63.50 66.26 69.22 92.63
Kin Kin 9.28 9.4 10.10 10.34 13.48
Cooroibah 4.55 4.55 4.63 4.63 4.67
1Note— Table SC3.1.6 Column 1 the service catchments for the stormwater network are identified on Local Government
Infrastructure Plan Map LGIPSW01 in Schedule 3 (local government infrastructure mapping and tables).
Table SC3.1.7 Existing and projected demand for the transport network
Column 1 Column 3
Service catchment2 Existing and projected demand (vpd)
Ultimate
2016 2021 2026 2031 Development
Coastal Area 321,765 331,603 352,961 369,091 426,000
Cooroy 39,674 42,875 43,898 47,472 59,492
Boreen Point 2,591 2,616 2,740 3,159 6,418
Cooran 3,883 3,896 4,006 6,042 7,099
Pomona 13,504 14,366 15,820 16,504 20,581
Kin Kin 2,068 2,074 2,113 2,126 4,144
Cooroibah 741 741 754 754 761
Outside PIA (Balance 59,718 65,536 64,707 65,431 78,247
NOOSA PLAN 2020 Page 10 of 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.