Log in to see the plans as drawn Column 1 Column 3
Service catchment2 Existing and projected demand (vpd)
Rural Hinterland)
2Note— Table SC3.1.7 Column 1 the service catchments for the transport network are identified on Local Government Infrastructure
Plan Maps LGIPPIASC1 to LGIPPIASC11 LGIP Priority Infrastructure Area and Services Catchments in Schedule 3 (local
government infrastructure mapping and tables).
Table SC3.1.8 Existing and projected demand for the public parks and land for
community facilities network
Column 1 Column 3
Service catchment3 Existing and projected demand (persons)
Ultimate
2016 2021 2026 2031 Development
Coastal Area 38,224 39,506 42,175 43,789 52,634
Cooroy 2,680 3,505 3,544 3,798 5,541
Boreen Point 601 620 669 717 754
Cooran 781 786 830 847 901
Pomona 1,188 1,267 1,306 1,379 1,819
Kin Kin 158 161 176 181 212
Cooroibah 295 295 300 300 303
Outside PIA (Balance 14,652 14,874 15,180 15,348 18,954
Rural Hinterland)
3Note— Table SC3.1.8 Column 1 the service catchments for the public parks and land for community facilities network are identified
on Local Government Infrastructure Plan Maps LGIPPIASC1 to LGIPPIASC11 in Schedule 3 (local government infrastructure
mapping and tables).
SC3.2 Schedule of works
Table SC3.2.1 Stormwater network schedule of works
Column 1 Column 2 Column 3 Column 4
Map reference Trunk infrastructure Estimated timing Establishment cost4
Stormwater Maps LGIPSW1LGIPSW14
SW01 Pomona , Rifle Street 2016 / 2017 $2,687,500
Pomona Rifle Street Flood
Mitigation
SW02 Tewantin, Cooroy Noosa Road
Noosa Cooroy Road (opposite 2016 / 2017 $213,364
Tewantin Golf Course) Upgrade
of Culverts and auxiliary
drainage
SW03 Tewantin, Daintree Estate – Golf 2016 / 2017 $1,343,750
Course Drive
Upgrade of Stormwater
Infrastructure
SW04 Noosa Heads, Pinaroo Park,
Reconstruction of Stormwater 2021 2026 $423,201
outlet including GPT / Bio
NOOSA PLAN 2020 Page 11 of 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.