Skip to the record
Accept no substitutions.

Original source · versioned page text

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
               Column 1                                                                                                   Column 3
     Service catchment2                                                                         Existing and projected demand (vpd)
  Rural Hinterland)



 2Note— Table SC3.1.7 Column 1 the service catchments for the transport network are identified on Local Government Infrastructure
 Plan Maps LGIP­PIA­SC­1 to LGIP­PIA­SC­11 LGIP Priority Infrastructure Area and Services Catchments in Schedule 3 (local
 government infrastructure mapping and tables).

 Table SC3.1.8             Existing and projected demand for the public parks and land for
                           community facilities network
               Column 1                                                                                                 Column 3
     Service catchment3                                                                   Existing and projected demand (persons)

                                                                                                                             Ultimate
                                         2016                     2021                  2026                   2031     Development
  Coastal Area                          38,224                   39,506                42,175                  43,789         52,634
  Cooroy                                 2,680                    3,505                 3,544                   3,798           5,541
  Boreen Point                            601                      620                   669                      717             754
  Cooran                                  781                      786                   830                      847             901
  Pomona                                 1,188                    1,267                 1,306                   1,379           1,819
  Kin Kin                                 158                      161                   176                      181             212
  Cooroibah                               295                      295                   300                      300             303
  Outside PIA (Balance                  14,652                   14,874                15,180                  15,348         18,954
  Rural Hinterland)



 3Note— Table SC3.1.8 Column 1 the service catchments for the public parks and land for community facilities network are identified
 on Local Government Infrastructure Plan Maps LGIP­PIA­SC1 to LGIP­PIA­SC11 in Schedule 3 (local government infrastructure
 mapping and tables).

 SC3.2            Schedule of works
 Table SC3.2.1           Stormwater network schedule of works

  Column 1                        Column 2                          Column 3                        Column 4
  Map reference                   Trunk infrastructure              Estimated timing                Establishment cost4
  Stormwater Maps LGIP­SW1­LGIP­SW­14
  SW01                            Pomona , Rifle Street              2016 / 2017                     $2,687,500
                                  Pomona Rifle Street Flood
                                  Mitigation
  SW02                            Tewantin, Cooroy Noosa Road
                                  Noosa Cooroy Road (opposite       2016 / 2017                     $213,364
                                  Tewantin Golf Course) Upgrade
                                  of Culverts and auxiliary
                                  drainage
  SW03                            Tewantin, Daintree Estate – Golf 2016 / 2017                      $1,343,750
                                  Course Drive
                                  Upgrade of Stormwater
                                  Infrastructure
  SW04                            Noosa Heads, Pinaroo Park,
                                  Reconstruction of Stormwater      2021 ­2026                      $423,201
                                  outlet including GPT / Bio


NOOSA PLAN 2020                                                                                                            Page 11 of 73
Log in to download the original file

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix.pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.