Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Column 1        Column 2                            Column 3           Column 4
  Map reference   Trunk infrastructure                Estimated timing   Establishment cost5
                  Upgrade roundabout capacity
  R6              Tewantin, Butler St / Poinciana
                  Ave                                 2021 ­2026         $574,919
                  Upgrade roundabout capacity
  R7              Peregian Beach, Heron St /
                  David Low Way                       2021 ­2026         $212,106
                  Upgrade roundabout capacity
  R8              Peregian Beach, David Low Way
                  / Lowry St / Peregian Esplanade 2021 ­2026             $719,851
                  Upgrade 4 way intersection to
                  roundabout
  R9              Noosaville, Walter Hay Dr /
                  Eenie Creek Rd                      2021 ­2026         $199,551
                  Upgrade roundabout capacity
  R10             Noosaville, Walter Hay Dr /                            $28,750
                  Eumundi Noosa Rd                    2021 ­2026
                  Upgrade roundabout capacity
  R11             Sunshine Beach, Ben Lexcen Dr 2021­2026                $2,128,215
                  / Eenie Creek Rd
                  Upgrade signalised intersection
  R12             Noosaville, Eumundi Noosa Rd / 2021­2026               $338,952
                  Eenie Creek Rd
                  Upgrade roundabout capacity
  R13             Noosaville, Reef St / Mary St       2021­2026          $425,823
                  Upgrade roundabout capacity
  R14             Cootharaba, Wapunga Lane            2026­2031          $1,037,592
                  (Bridge)
                  Upgrade one lane bridge to two
                  lane bridge re Safety Issues
  R15             Noosaville, Gympie Tce –            2017­2018          $696,730
                  Eumundi Rd/Gibson Rd
                  roundabout to Cloudsley St. Incl.
                  Hilton Tce/Gympie Tce
                  roundabout.
  R16             Noosaville, Weyba Rd – Leslie       2017­2018          $1,490,790
                  Dr. to Reef St
  R17             Noosa Heads, Noosa Parade – 2020­2022                  $5,791,400
                  full corridor upgrade to achieve
                  improved bicycle safety and bus
                  transit.
  R18             Tewantin, Cooroy Noosa Rd /         2016­2017          $95,138
                  Beckmans Rd intersection
                  Improvements to the existing ‘T’
                  intersection for cycling safety
  R19             Tewantin, Cooroy Noosa Rd,          2016­2017          $2,442,448
                  Upgrading to include bike lands
  R20             Castaways Beach, David Low          2018/2019          $236,500
                  Way
                  Safety Improvements at
                  Castaways Carpark



NOOSA PLAN 2020                                                                                Page 13 of 73
Log in to download the original file

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix.pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.