Skip to the record
Search everything, all in one place.

Original source · versioned page text

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Column 1                       Column 2                             Column 3                   Column 4
  Map reference                  Trunk infrastructure                 Estimated timing           Establishment cost4
                                 retention Basin and Dispersion
                                 Bund Upgrades
  SW05                           Noosa Heads, Cooyar Street
                                 Street (East of Noosa Springs        2021 ­2026                 $252,484
                                 Drive)
                                 Bio retention Basin / Infiltration
                                 Basin & Dispersion Bund
  SW06                           Noosa Heads, Cooyar Street
                                 (Opposite Wyandra)                   2021 ­2026                 $383,261
                                 Upgrade existing Bio retention
                                 System and Gross Pollutant
                                 Trap
  SW07                           Noosa Heads, Cooyar Street
                                 (Elanora Terrace to Safari Street)
                                 Bio retention Basin / Infiltration 2021 ­2026                   $162,956
                                 Basin & Dispersion Bund
  SW08                           Sunrise Beach, Ben Lexcen
                                 Drive and Grasstree Court            2021 ­2026                 $421,880
                                 Bio retention Basin / Infiltration
                                 Basin & Dispersion Bund
  SW09                           Sunrise Beach, Dame Patti
                                 Drive.                               2021 ­2026                 $87,194
                                 Stormwater outlet Upgrade /
                                 Gross Pollutant Trap and Bio
                                 retention system
   TOTAL                                                                                          $5,975,589

 4Note— Table SC3.2.1 Column 4 the establishment cost is expressed in current cost terms as at the base date.




 Table SC3.2.2        Transport network schedule of works


  Column 1                       Column 2                             Column 3                   Column 4
  Map reference                  Trunk infrastructure                 Estimated timing           Establishment cost5
  Roadways Maps LGIP­TR­1 to LGIP­TR­14
  R1                             Cootharaba, Kinmond Creek Rd         2017/2018                   $2,042,500
                                 Sandy Creek & Eastern Branch
                                 Creek culvert and road capital
                                 reconstruction
  R2                             Tewantin, Ernest St / Hilton Tce.
                                 Upgrade T intersection to            2017/2020                  $3,211,563
                                 roundabout
  R3                             Tewantin, Poinciana Ave /            2017/ 2018                 $306,639
                                 Moorindil St
                                 Upgrade roundabout capacity
  R4                             Tewantin, Memorial Ave /             2017­2018                  $152,230
                                 Doonella St
                                 Upgrade roundabout capacity
  R5                             Noosaville, Gibson Rd /
                                 Eumundi Noosa Rd                     2021 ­2026                 $86,739


NOOSA PLAN 2020                                                                                                        Page 12 of 73
Log in to download the original file

2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix.pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.