(5) Waste management plans are to be submitted for demolition works, other than for the demolition of a Class 10 building.
SC6.10.3 Information to be provided in a Waste Management Plan – Operational Works
(1) Waste management plans are to include the following:
(a) estimate volumes of waste to be generated;
(b) estimated volumes of recyclables;
(c) estimated volumes of garden/organic waste;
(d) method to be used for disposal of garden/organic waste;
(e) initiatives to minimise waste by waste reduction, reuse or recycling;
(f) description of the procedures involved in disposing of refuse to bins, the storage of bins and the collection of bins by the
contractor and who is responsible for each transfer of waste;
(g) description of the design details of waste storage and recycling areas, including the method of preventing stormwater
pollution – to be highlighted on plan drawings;
(h) plans showing the location and details of the waste storage areas;
(i) a description of the type of containers proposed to store the waste; and
(j) a detailed description of the proposed access arrangement for waste collection vehicles to be highlighted on plan
drawings.
SC6.10.4 Information to be provided for Construction or Demolition Works
(1) The waste management plan for either the construction or demolition stage of a development is to contain the following
Information:
Material OnSite Destination
Reuse and Recycling Disposal
Type of Material Estimated Volume (m³) Onsite specify proposed Offsite specify contractor Specify contractor and
reuse or onsite recycling and recycling outlet landfill site
methods.
Excavation material
Garden organics
Bricks
Concrete
Timber please specify
Plasterboard
Metals please specify
Others please specify
Note: Waste that cannot be collected by Council’s normal collection service is collected by an approved Regulated Waste Transporter.
(2) An area is also to be allocated on the development site for the segregation of construction and demolition materials. Details of the
site area to be used for onsite separation, treatment and storage (including weather protection) are to be provided on the plan
drawings accompanying the application.
SC6.10.5 Waste management design criteria
(1) Preliminary considerations prior to designing waste management facilities may include:
(a) types of waste generated from the site;
(b) presence or absence of service staff or on site management;
(c) distance waste needs to be moved to a waste storage area and/or collection area;
NOOSA PLAN 2020 Page 89 of 99
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.