Log in to see the plans as drawn avoids areas of potential flood inundation to protect waterways or order as specified in Table 8.2.9.3A
water supply sources.
Bulk Water Infrastructure
PO6 AO6
Development is set back from bulk water supply infrastructure to: Development is setback in accordance with Table 8.2.9.3B
(a) avoid safety risks to people and property; ‘Recommended separation distances from bulk water supply
infrastructure’.
(b) minimise noise and visual impacts to people and property;
and
(c) ensure the physical integrity and operation, maintenance
and expansion of the infrastructure is not compromised.
PO7 AO7
Vegetation planted near pipelines does not pose any risk to the Planting near pipelines complies with the current Seqwater
physical integrity and operation of the bulkwater pipelines. Network Consent Guidelines.
PO8 AO8
Development is located and designed to maintain required Development does not restrict access to Bulk water supply
access to Bulk water supply infrastructure. infrastructure of any type or size, having regard to:
(a) buildings or structures;
(b) gates and fences;
(c) storage of equipment or materials;
(d) landscaping or earthworks or stormwater or other
infrastructure.
Table 8.2.9.3A Separation distances to waterways and water supply sources
Development type and activities Stream Order 1 to 3 Stream Order 4 or greater
Intensive animal industry 50 metres 100 metres
Aquaculture Casebycase basis Casebycase basis
All other agricultural or forestry land uses 50 metres 100 metres
Extractive industry 50 metres 100 metres
All other industrial uses 100 metres 100 metres
Outdoor sport and recreation
50 metres 100 metres
Major sport, recreation and entertainment
Service station 50 metres 100 metres
All other developments 50 metres 100 metres
Table 8.2.9.3B Recommended separation distances from bulk water supply infrastructure
Bulk water supply infrastructure asset Type of development Recommended separation distance
type minimum
Pipelines and channels (1) Buildings/Structures/Earthworks 20 metres from edge of pipe
Blasting(2,3) 200 metres from edge of pipe
Water treatment plants and water quality Sensitive Land Use 250 metres from building footprint
facilities
Buildings/Structures/Earthworks 20 metres from building footprint
Blasting (2,3) 200 metres from building footprint
Reservoir facilities Buildings/Structures/Earthworks 20 metres from building footprint
Blasting (2,3) 200 metres from building footprint
Pump stations Sensitive Land Use 100 metres from building footprint
Buildings/Structures/Earthworks 20 metres from building footprint
NOOSA PLAN 2020 Page 41 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.