2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  avoids areas of potential flood inundation to protect waterways or   order as specified in Table 8.2.9.3A
  water supply sources.
  Bulk Water Infrastructure
  PO6                                                                  AO6
  Development is set back from bulk water supply infrastructure to:    Development is setback in accordance with Table 8.2.9.3B
  (a)    avoid safety risks to people and property;                    ‘Recommended separation distances from bulk water supply
                                                                       infrastructure’.
  (b)    minimise noise and visual impacts to people and property;
         and
  (c)    ensure the physical integrity and operation, maintenance
         and expansion of the infrastructure is not compromised.

  PO7                                                                  AO7
  Vegetation planted near pipelines does not pose any risk to the      Planting near pipelines complies with the current Seqwater
  physical integrity and operation of the bulkwater pipelines.         Network Consent Guidelines.
  PO8                                                                  AO8
  Development is located and designed to maintain required             Development does not restrict access to Bulk water supply
  access to Bulk water supply infrastructure.                          infrastructure of any type or size, having regard to:
                                                                       (a)   buildings or structures;
                                                                       (b)   gates and fences;
                                                                       (c)   storage of equipment or materials;
                                                                       (d)   landscaping or earthworks or stormwater or other
                                                                             infrastructure.

 Table 8.2.9.3A ­ Separation distances to waterways and water supply sources
  Development type and activities                Stream Order 1 to 3                          Stream Order 4 or greater

  Intensive animal industry                      50 metres                                    100 metres
  Aquaculture                                    Case­by­case basis                           Case­by­case basis
  All other agricultural or forestry land uses   50 metres                                    100 metres
  Extractive industry                            50 metres                                    100 metres
  All other industrial uses                      100 metres                                   100 metres
  Outdoor sport and recreation
                                                 50 metres                                    100 metres
  Major sport, recreation and entertainment
  Service station                                50 metres                                    100 metres
  All other developments                         50 metres                                    100 metres


 Table 8.2.9.3B ­ Recommended separation distances from bulk water supply infrastructure
  Bulk water supply infrastructure ­ asset       Type of development                          Recommended separation distance
  type                                                                                        minimum

  Pipelines and channels (1)                     Buildings/Structures/Earthworks              20 metres from edge of pipe
                                                 Blasting(2,3)                                200 metres from edge of pipe
  Water treatment plants and water quality       Sensitive Land Use                           250 metres from building footprint
  facilities
                                                 Buildings/Structures/Earthworks              20 metres from building footprint
                                                 Blasting (2,3)                               200 metres from building footprint
  Reservoir facilities                           Buildings/Structures/Earthworks              20 metres from building footprint
                                                 Blasting (2,3)                               200 metres from building footprint
  Pump stations                                  Sensitive Land Use                           100 metres from building footprint
                                                 Buildings/Structures/Earthworks              20 metres from building footprint


NOOSA PLAN 2020                                                                                                                   Page 41 of 44
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.