Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Bulk water supply infrastructure asset Type of development Recommended separation distance
type minimum
Blasting (2,3) 200 metres from building footprint
Dam structures and weirs (4) Earthworks Dam/Weir Height(5) 05 meters 50 metres from the toe of the dam/weir
Earthworks Dam/Weir Height(5) 510 metres 100 metres from the toe of the dam/weir
Earthworks Dam/Weir Height(5) 1015 150 metres from the toe of the dam/weir
metres
Earthworks Dam/Weir Height(5) 1520 200 metres from the toe of the dam/weir
metres
Earthworks Dam/Weir Height(5) > 20 metres 500 metres from the toe of the dam/weir
Blasting (2,3) 500 metres from dam wall/earth
embankment/weir footprint
1 Channels are included in the pipelines and channels layer SPP IMS but are not differentiated from pipelines. Where an applicant
identifies the bulk water supply infrastructure is a channel rather than a pipe, applicants should contact the utility provider to discuss
appropriate separation distances.
2 Refers to any type of development involving blasting <500 kg charge mass per delay, use of explosives, piling, and other
vibratory/compaction machinery (over 20t centrifugal force) during construction and/or operation. For blasting over 500 kg, applicants are
to contact the asset owner as a greater separation zone may apply.
3 It is recommended that blasting provisions be included in an extractive industry code (or similar).
4 For dam structures and weirs, applicants should contact the utility provider to determine the toe of the dam/weir.
5 Dam/weir height is to be taken at the maximum section of the dam/weir (from dam/weir crest to dam/weir toe).
Table 8.2.9.4 Criteria for assessable development Gas pipeline and Major Electricity Infrastructure
Performance outcomes Acceptable outcomes
Gas pipeline corridor and buffer area
PO1 AO1.1
Development, including uses and works are constructed and Buildings and structures are setback a minimum of 40 metres
operated to avoid: from a gas pipeline corridor.
(a) compromising the viability of the gas pipeline corridor; or
AO1.2
(b) damaging or adversely affecting the existing or future
The use does not involve the storage of flammable, explosive or
operation of a gas pipeline within the gas pipeline corridor.
other hazardous materials within 200 metres of the gas pipeline
corridor.
OR
AO1.3
Written conformation of the pipeline license holder of Petroleum
Pipeline License 32 that the setback distance and design of the
development does not impact the future use of the gas pipeline.
Editor's note should a lesser setback distance be proposed, it is
recommended that the applicant consult with the relevant gas
pipeline manager prior to the lodgement of a development
application to determine how compliance with the performance
outcome can be achieved.
Performance outcomes Acceptable outcomes
Major Electricity Infrastructure
PO2
Development does not increase risk to community health or No acceptable outcome provided
safety, or the operation and reliability of major electricity
infrastructure
NOOSA PLAN 2020 Page 42 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.