2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Bulk water supply infrastructure ­ asset       Type of development                            Recommended separation distance
  type                                                                                          minimum

                                                 Blasting (2,3)                                 200 metres from building footprint
  Dam structures and weirs (4)                   Earthworks Dam/Weir Height(5) 0­5 meters       50 metres from the toe of the dam/weir
                                                 Earthworks Dam/Weir Height(5) 5­10 metres 100 metres from the toe of the dam/weir
                                                 Earthworks Dam/Weir Height(5) 10­15            150 metres from the toe of the dam/weir
                                                 metres
                                                 Earthworks Dam/Weir Height(5) 15­20            200 metres from the toe of the dam/weir
                                                 metres
                                                 Earthworks Dam/Weir Height(5) > 20 metres 500 metres from the toe of the dam/weir
                                                 Blasting (2,3)                                 500 metres from dam wall/earth
                                                                                                embankment/weir footprint


 1  Channels are included in the pipelines and channels layer SPP IMS but are not differentiated from pipelines. Where an applicant
 identifies the bulk water supply infrastructure is a channel rather than a pipe, applicants should contact the utility provider to discuss
 appropriate separation distances.
 2 Refers to any type of development involving blasting <500 kg charge mass per delay, use of explosives, piling, and other
 vibratory/compaction machinery (over 20t centrifugal force) during construction and/or operation. For blasting over 500 kg, applicants are
 to contact the asset owner as a greater separation zone may apply.
 3 It is recommended that blasting provisions be included in an extractive industry code (or similar).
 4 For dam structures and weirs, applicants should contact the utility provider to determine the toe of the dam/weir.
 5 Dam/weir height is to be taken at the maximum section of the dam/weir (from dam/weir crest to dam/weir toe).



 Table 8.2.9.4         Criteria for assessable development ­ Gas pipeline and Major Electricity Infrastructure

  Performance outcomes                                                   Acceptable outcomes

  Gas pipeline corridor and buffer area
  PO1                                                                    AO1.1
  Development, including uses and works are constructed and              Buildings and structures are setback a minimum of 40 metres
  operated to avoid:                                                     from a gas pipeline corridor.
  (a)    compromising the viability of the gas pipeline corridor; or
                                                                         AO1.2
  (b)    damaging or adversely affecting the existing or future
                                                                         The use does not involve the storage of flammable, explosive or
         operation of a gas pipeline within the gas pipeline corridor.
                                                                         other hazardous materials within 200 metres of the gas pipeline
                                                                         corridor.
                                                                         OR

                                                                         AO1.3
                                                                         Written conformation of the pipeline license holder of Petroleum
                                                                         Pipeline License 32 that the setback distance and design of the
                                                                         development does not impact the future use of the gas pipeline.

                                                                         Editor's note­ should a lesser setback distance be proposed, it is
                                                                         recommended that the applicant consult with the relevant gas
                                                                         pipeline manager prior to the lodgement of a development
                                                                         application to determine how compliance with the performance
                                                                         outcome can be achieved.

  Performance outcomes                                                   Acceptable outcomes

  Major Electricity Infrastructure
  PO2
  Development does not increase risk to community health or              No acceptable outcome provided
  safety, or the operation and reliability of major electricity
  infrastructure


NOOSA PLAN 2020                                                                                                                   Page 42 of 44
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.