Log in to see the plans as drawn reliability of substations or major electricity infrastructure.
AO9.2
No valve pits occur within:
(a) for transmission infrastructure, 60 metres of a tower, pole
or stay; or
(b) for distribution infrastructure, 20 metres of a tower, pole or
stay.
AO9.3
Underground services traversing an easement cross at right
angles to the overhead or underground lines.
NOOSA PLAN 2020 Page 44 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.