Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn PO3 AO3.1
Development involving a sensitive land use is sufficiently With the exception of class 10 buildings, buildings associated
separated from major electricity infrastructure and substations to with a sensitive land use maintain a setback of at least:
minimise the likelihood of nuisance or complaint. (a) 50 metres from a transmission substation;
(b) 10 metres from any other substation; and
(c) 30 metres from a transmission line easement.
AO3.2
Buildings are not located within an easement for a distribution
line.
PO4 AO4
Development adjoining substations are located and designed to For development adjoining substations, noise emissions do not
avoid noise nuisance from infrastructure. exceed 5db(A) above background noise level at the sensitive
receptor of a building associated with a sensitive land use,
measured in accordance with AS1055.
PO5 AO5
Wherever practicable new lots and buildings are orientated to Buildings are orientated so that the majority of outdoor living areas
avoid direct overlooking of electricity infrastructure. and windows of habitable rooms face away from towers or other
major electricity infrastructure.
PO6 AO6
For sensitive land uses, there is sufficient space within the site to A minimum 3 metres wide densely planted landscaped buffer is
establish landscaping which substantively screens and softens provided along the boundary adjoining the electricity infrastructure,
poles, towers, or other structures and equipment associated with including provision for advanced trees and shrubs that will grow to
major electricity infrastructure and substations. a minimum height of 10 metres.
Editor's note Applicants may find guidance in Powerlink
Queensland's brochure "Using Vegetation to screen transmission
lines". Applicants should also note that vegetation will need to
maintain statutory clearances.
PO7 AO7.1
Vegetation does not pose a risk to the safety or reliability of Vegetation planted within the easement of an overhead powerline
electricity infrastructure. or, where there is no easement, the area of influence of a
powerline, has a mature height of no more than 3.5 metres.
AO7.2
Vegetation planted within an underground powerline easement
does not have a mature root system in excess of 150 millimetres
in depth and is not located directly over the powerline.
AO7.3
Regardless of the width of the easement, vegetation adjoining
easements must be separated from the power pole or other
infrastructure by a distance at least equal to the maximum mature
height of the vegetation.
PO8 AO8.1
Any earthworks are undertaken in a way which: For overhead distribution infrastructure, no earthworks are
(a) ensures stability of the land on or adjoining the electricity undertaken within 10 metres of a tower, pole or stay.
infrastructure;
AO8.2
(b) does not otherwise impact on the safety and reliability of the
For overhead transmission infrastructure, no earthworks are
electricity infrastructure; and
undertaken within 20 metres of a tower, pole or stay.
(c) does not restrict the placement or use of the electricity
infrastructure provider's equipment.
PO9 AO9.1
Services and infrastructure works (such as stormwater, Underground services are not located within 20 metres of a tower,
sewerage, water and the like) do not impact on the safety and pole, stay or substation boundary.
NOOSA PLAN 2020 Page 43 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.