Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                                  Acceptable Outcomes
  pumping used to achieve such immunity.
  Major Electricity Infrastructure & Substations
  PO18                                                                  AO18.1
  Development is sufficiently separated from major electricity          Development including any sensitive land uses is at least:
  infrastructure and substations to minimise the likelihood of          (a)    50 metres from a transmission substation;
  nuisance or complaint.
                                                                        (b)    10 metres from any other substation; and
                                                                        (c)    30 metres from a transmission line easement.

                                                                        AO18.2
                                                                        Habitable buildings are not located within an easement for a
                                                                        distribution line.
  PO19                                                           AO19
  Development is located and designed to avoid or minimise noise Noise emissions do not exceed 5db(A) above background noise
  nuisance from the use of infrastructure.                       level internal to a habitable building measured in accordance with
                                                                 AS1055.
  PO20                                                                   AO20
  Wherever practicable habitable buildings are orientated to avoid       Where adjoining substations or major electricity infrastructure,
  direct overlooking of major electricity infrastructure or substations. habitable buildings are orientated so that the majority of outdoor
                                                                         living areas and windows of habitable rooms face away from
                                                                         the infrastructure.
  Earthworks and Drainage
  PO21                                                                  AO21
  Earthworks and drainage operational works do not directly,            Filling other than accessways:
  indirectly or cumulatively cause adverse                                     does not extend more than the equivalent of 3 metres
                                                                        (a)
  impacts external to the development site by:                                 around the main building, measured from the outer walls of
  (a)    causing ponding of water on the site or nearby land;                  the building;
  (b)    increasing flooding, which adversely affects the safety or     (b)    is limited to a maximum of 500m2; and
         use of any land upstream and downstream;
                                                                        (c)    does not impact on the local drainage of adjoining
  (c)    adversely affecting the flow of water in any                          properties.
         overland flow path; and
  (d)    adversely affecting the privacy or visual amenity
         of surrounding property.

  Editor's Note—Development should ensure that filling does not
  impact on the amenity and usability of neighbouring properties
  (including loss of privacy caused by relative level changes) or
  offsite drainage.
  Landslide Hazard Area
  PO22                                                                  AO22.1
  Development maintains the safety of people, property and              Development, including associated access, is not located on land
  hazardous materials stored in bulk from the risk of landslide.        identified as a landslide hazard area on a Landslide Hazard
                                                                        Overlay Map.

                                                                        AO22.2
                                                                        Development, including associated access, is located outside
                                                                        moderate, high and very high landslide hazard areas and areas
                                                                        with 15% slope or greater, as determined by a site­specific slope­
                                                                        analysis.

                                                                        Editor's Note—A site­ specific geotechnical assessment may be
                                                                        used to demonstrate that although the proposed development is
                                                                        shown on the Landslide Hazard Overlay as being in the moderate,
                                                                        high or very high landslide hazard area, the landslide risk is low or
                                                                        very low.


NOOSA PLAN 2020                                                                                                                     Page 7 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.