Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
pumping used to achieve such immunity.
Major Electricity Infrastructure & Substations
PO18 AO18.1
Development is sufficiently separated from major electricity Development including any sensitive land uses is at least:
infrastructure and substations to minimise the likelihood of (a) 50 metres from a transmission substation;
nuisance or complaint.
(b) 10 metres from any other substation; and
(c) 30 metres from a transmission line easement.
AO18.2
Habitable buildings are not located within an easement for a
distribution line.
PO19 AO19
Development is located and designed to avoid or minimise noise Noise emissions do not exceed 5db(A) above background noise
nuisance from the use of infrastructure. level internal to a habitable building measured in accordance with
AS1055.
PO20 AO20
Wherever practicable habitable buildings are orientated to avoid Where adjoining substations or major electricity infrastructure,
direct overlooking of major electricity infrastructure or substations. habitable buildings are orientated so that the majority of outdoor
living areas and windows of habitable rooms face away from
the infrastructure.
Earthworks and Drainage
PO21 AO21
Earthworks and drainage operational works do not directly, Filling other than accessways:
indirectly or cumulatively cause adverse does not extend more than the equivalent of 3 metres
(a)
impacts external to the development site by: around the main building, measured from the outer walls of
(a) causing ponding of water on the site or nearby land; the building;
(b) increasing flooding, which adversely affects the safety or (b) is limited to a maximum of 500m2; and
use of any land upstream and downstream;
(c) does not impact on the local drainage of adjoining
(c) adversely affecting the flow of water in any properties.
overland flow path; and
(d) adversely affecting the privacy or visual amenity
of surrounding property.
Editor's Note—Development should ensure that filling does not
impact on the amenity and usability of neighbouring properties
(including loss of privacy caused by relative level changes) or
offsite drainage.
Landslide Hazard Area
PO22 AO22.1
Development maintains the safety of people, property and Development, including associated access, is not located on land
hazardous materials stored in bulk from the risk of landslide. identified as a landslide hazard area on a Landslide Hazard
Overlay Map.
AO22.2
Development, including associated access, is located outside
moderate, high and very high landslide hazard areas and areas
with 15% slope or greater, as determined by a sitespecific slope
analysis.
Editor's Note—A site specific geotechnical assessment may be
used to demonstrate that although the proposed development is
shown on the Landslide Hazard Overlay as being in the moderate,
high or very high landslide hazard area, the landslide risk is low or
very low.
NOOSA PLAN 2020 Page 7 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.