Skip to the record
Accept no substitutions.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                      contribute to hillslope erosion, bank erosion, or slippage.


 Connectivity          Table 8.2.2.3 ­ Criteria for assessable development (part)
  Performance outcomes                                                Acceptable outcomes
  Connectivity
  PO5                                                              AO5
  Development is designed and operated to maintain and enhance Development is designed and operated to maintain ecological
  connectivity between and across ecologically important areas and linkages and maximise opportunity for connectivity and the
  connecting habitat and support unimpeded and safe movement of movement of fauna by:
  terrestrial and aquatic fauna.                                   (a)   ensuring protection of wildlife refuges;
                                                                      (b)   maintaining vegetation in patches of the greatest possible
                                                                            size and within the smallest possible edge­to­area ratio;
                                                                      (c)   enhancing connectivity through planting and rehabilitation
                                                                            works, including across property boundaries, to areas of
                                                                            national park, state forest or reserve;
                                                                      (d)   avoiding the creation of physical barriers and safety
                                                                            hazards (such as roads, pedestrian access and instream
                                                                            structures) along and within the ecological linkage;
                                                                      (e)   providing mitigation measures such as wildlife movement
                                                                            infrastructure, fauna exclusion and directional fencing,
                                                                            underpasses/overpasses and traffic calming devices,
                                                                            signage and lighting; and
                                                                      (f)   where offsets are necessary, delivering offsets that support
                                                                            and enhance ecological linkages.



 Waterways and wetlands                  Table 8.2.2.3 ­ Criteria for assessable development (part)
  Performance outcomes
  Waterways and wetlands
  PO6                                                                 AO6.1
  The biodiversity and ecosystem values of waterways, wetlands        Development and clearing of vegetation does not occur within:
  and adjacent riparian zones are protected by:                       (a)   a riparian buffer area;
  (a)    avoiding any new development in a riparian buffer area and (b)     a wetland area; or
         wetland area;
                                                                      (c)   10 metres either side of the centre line of other waterways
  (b)    retaining aquatic and terrestrial habitat in riparian zones;       identified on a Biodiversity, Waterways and Wetlands
  (c)    maintaining and enhancing wildlife corridors and                   Overlay Map.
         connectivity along watercourses and drainage lines for
         native fauna movement;                                       AO6.2
  (d)    avoiding edge effects and damage from adjacent land          Development provides for the rehabilitation of land within:
         uses;                                                        (a)   a riparian buffer area;
  (e)    maintaining stream integrity and bank stability by           (b)   a wetland area; and
         minimising bank erosion and slumping;
                                                                      (c)   10 metres either side of the centre line of any other
  (f)    maintaining water quality through filtering sediments,             waterway identified on a Biodiversity, Waterways and
         nutrients and other pollutants; and                                Wetlands Overlay Map.
  (g)    removing pest species and replacing them with local native
         species.                                                   AO6.3
                                                                    Recreational facilities (eg. playgrounds, pergolas, barbeques) are
                                                                    setback a minimum of 10 metres from the top of the bank of a
                                                                    waterway.

                                                                      Editor’s Note—Setbacks to waterways for certain uses and works
                                                                      are also specified in the relevant codes.

NOOSA PLAN 2020                                                                                                                     Page 6 of 44
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.