Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Editor's Note—Wetland areas are identified on the Queensland
Wetland Program mapping
Editor's Note—Any clearing of vegetation also needs to meet the
outcomes of the Earthworks Code and the Water Quality and
Drainage Code.
PO7
Vegetation within 400 metres of the full ponded water within Lake No acceptable outcome provided.
Macdonald is retained.
PO8 AO8.1
Development on land adjacent to a waterway or wetland Development adjacent to a waterway or wetland provides that:
maintains appropriate extent of public access to waterways and (a) no new lots directly back onto a riparian buffer area; and
wetlands and minimises edge effects.
(b) new public roads are located between a riparian buffer area
or riparian zone and the proposed development area.
Water hydrology Table 8.2.2.3. Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
Surface and ground water hydrology
PO9 AO9.1
Development ensures that the natural surface water and ground Development does not impact on the natural surface water or
water hydrologic regimes of waterways, wetlands and groundwater hydrologic regimes and this is facilitated by:
hydrologicallysensitive plant communities are not adversely (a) avoiding or minimising channelization, redirection or
impacted. interruption of flow;
avoiding groundwater extraction;
Editor's Note—Groundwater dependent ecosystems are identified (b)
on Queensland Government Wetland Info mapping. (c) maintaining groundwater recharge and discharge
processes;
(d) maintaining natural groundwater fluctuations;
(e) avoiding causing ingress of saline water into freshwater
aquifers of wetlands; and
(f) avoiding contaminants entering groundwater (e.g. from
runoff, effluent disposal).
Rehabilitation of ecologically important areas Table 8.2.2.3 Criteria for assessable development
(part)
Performance outcomes Acceptable outcomes
Rehabilitation of ecologically important areas
PO10 AO10.1
Development provides for ecologically important areas to be Landscaping and rehabilitation complements and supports
restored and enhanced through: ecologically important areas by:
(a) designing landscaped areas to complement and enhance (a) utilising local native species;
existing vegetation and ecological linkages; (b) utilising suitable plant species identified in PSP2
(b) removing species likely to displace native flora species or Landscaping;
degrade fauna habitat; (c) restoring degraded ecosystems to achieve a functional
(c) replanting and rehabilitating degraded habitat; ecosystem state that requires minimal human intervention;
(d) replacing any vegetation removed with suitable local native (d) replicating adjacent remnant habitats of the same type,
species; including the understorey vegetation;
NOOSA PLAN 2020 Page 7 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.