STORMWATER
MANAGEMENT PLAN
Proposed Residential Development
at
Lots 9 Serenity Close,
Noosa Heads
for Cape Bouvard Developments Pty Ltd
a6107/l9/SWMP/Rev a
Aug 2021
SH/PL
Prepared by Brah101 Pty Ltd Trading As Alta Projects ABN 91 611 354 511
Civil and Structural Engineering
Project Management
26 Memorial Avenue
P. O. Box 559
Cotton Tree, Queensland, 4558
Telephone: (07) 5475 4125
Facsimile: (07) 5479 1607
e-mail: [email protected]
The content of this document is provided in strict commercial confidence. The content of this
document shall not be disclosed to any third party, without the express written authority of
Brah101 Pty Ltd t/as Alta Projects..
Document Control
Revision A6107/L9/SWMP/RevA - Authorised for Issue
Author Signature
No. Date Reviewer Signature Document Status
a Aug 2021 Steven Harrison Steven Harrison A
R - Revision F - Final A - Approval P - Preliminary
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 15 (of 33)
Section 2
- Contents - 1.0 INTRODUCTION ......................................................................................... 1 2.0 EXISTING CONDITIONS ........................................................................... 2 3.0 PROPOSED DEVELOPMENT .................................................................... 2 4.0 STORMWATER TREATMENT & DISPOSAL ....................................... 3 5.0 RAPID INFILTRATION PITS (RIP’s) ....................................................... 4 6.0 CALCULATIONS .......................................................................................... 4 APPENDICES APPENDIX A – Engineering Drawings APPENDIX B – RIP Management & Maintenance Plan APPENDIX C – Prototype RIP Test Results APPENDIX D – Spreadsheet Model Results APPENDIX E – Detail Survey
Section 3
1.0 INTRODUCTION
This report is lodged in support of a Minor Change application to Noosa
Council seeking to develop residential unit buildings at Lot 9 SP195871,
Serenity Close, Noosa Heads.
The proposed development represents the fourth stage of residential unit
buildings developed by Cape Bouvard over the greater Settlers Cove site with
Alta Projects’ engineers having completed stormwater design, inspection and
certification for all previous stages.
Design solutions presented in this report are consistent with those previously
adopted with minor refinements borne of experience.
1. In particular, this report addresses stormwater management issues
raised, at conditions 41 to 45 of Material Change of Use Decision
Notice 132008.175.03 dated 6 August 2019.
41. A stormwater management plan shall be prepared by a RPEQ,
specialising in stormwater and water quality management incorporating the
principles of the Environmental Management Plan for the Settlers Cove
Development (23118 DA), that demonstrates water
reuse strategies, infrastructure capacity and effective treatment methodology.
The use of rainwater harvesting tanks for irrigation purposes shall be
incorporated in the overall design plans. These plans shall be submitted to
Council for approval prior to obtaining a
Development Permit for Operational Works.
` 42. Roof runoff from any new building should be directed to a rainwater
storage system or tank (minimum 23,000 litres) that is installed to ensure
water from the rainwater storage system or tank is used for external uses
(such as watering gardens, irrigation, ornamental ponds, water features,
topping-up swimming pools, outdoor cleaning, etc) and for internal (ground
floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks
are to be designed and installed in accordance with the approved Stormwater
and Water Quality Management Plan and the Queensland Development
Code (QDC) current at the time of building approval, and shall be part of the
plumbing application for approval. The location and capacity of the tanks shall
be clearly shown on the plans submitted for Building Works/Operational
Works approval and any overflow shall be directed to the stormwater
drainage system.
43. All stormwater drainage shall be collected on site and discharged so there
is no net increase in stormwater runoff from the site.
44. To ensure that polluted run-off does not enter the water table, the
adjoining waterways or Council’s stormwater drainage system, stormwater
run-off from the car parking areas and the driveways shall have the first flush
(the first 12mm of rainfall or hose-down) collected in
__________________________________________________________________________
A6107/L9/SMP/RevA/Aug 2021 Page 1 of 7
SH/pl
Brah101 Pty Ltd t/as ALTA PROJECTS
Section 4
a grease/oil arrestor/gross pollutant trap provided on site prior to being
permitted to discharge into the larger drainage system. All other clean
stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage
system, bypassing the grease/oil arrestor/gross pollutant trap. To this end, a
detailed maintenance plan shall be prepared for the proposed grease/oil
arrestors/gross pollutant trap, which shall be submitted to the Council for
approval prior to obtaining a Development Permit for Operational Works. The
approved maintenance plan shall be incorporated in the Community
Management Scheme for the development and a copy of this shall be
provided for Council’s records prior to commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued in regard to the
drainage scheme.
45. All site stormwater drainage shall be by means of a gravity system.
2.0 EXISTING CONDITIONS
The subject site is currently undeveloped and generally supports only grasses
and sucker regrowth.
The site falls at moderate grades away from a ridge near Serenity Close
towards Private Open Space for Conservation and Waterway Protection
(POSCWP) areas to the west.
An existing boulder retaining wall along the sites western boundary separates
the development site from POSCWP areas and the adjacent access pathway to
Noosa Inlet.
The entire site consists of loose, poorly graded dune sand and as such
contains no defined overland drainage paths since rainwater infiltrates
directly through the permeable surface.
Refer detail survey at Appendix E.
3.0 PROPOSED DEVELOPMENT
The proposed development is to consist of two (2) multi storey residential
buildings with a basement carparking under and a shared driveway
arrangement. Each building is to be surrounded by extensive terraced
landscape areas, both hard and soft.
__________________________________________________________________________
A6107/L9/SMP/RevA/Aug 2021 Page 2 of 7
SH/pl
Brah101 Pty Ltd t/as ALTA PROJECTS
Section 5
4.0 STORMWATER TREATMENT & DISPOSAL
Treatment and disposal of runoff will be carried out in accordance with the
approved document Settlers Cove Noosa Residential High Density Environmental
Management Plan (EMP 1) by WBM Oceanics Australia.
Alta Projects engineers (formally TATE) were involved in formulation of the
overarching development approval document and EMP1 produced by WBM
Oceanics.
EMP1 recognises in particular the regimes of stormwater runoff and
infiltration which existed over the broader RHD site pre-development.
Essentially it was recognised that the RHD site lies atop a dune of poorly
graded sand with particularly high rainfall infiltration rates. As such the
natural state sees all rainfall for events up to 10 year ARI infiltrate the dune
close to where it lands and replenish the water table below with little or no
runoff.
The standing water table forms a profile similar to the shape of the dune,
albeit at a depressed scale and emerges as seepage flows adjacent Noosa inlet
at or about RL 5.0m.
The zone between RL 5.0m and the inlet was recognised as having
particularly high ecological values, supporting numerous stands of swamp
mahogany and various species of fauna. Critically it was recognised that
these ecological values were dependant on maintenance of the natural
hydrogeological regime and no nett reduction in rainwater infiltration post-
development.
Consequently, and in order to counteract the effect of significant impervious
areas being constructed, the design approach will see stormwater runoff from
roofs and hardstand areas, up to 100-year ARI infiltrated into the natural
sands via a series of Rapid Infiltration Pits (RIPs) in order to achieve no net
reduction in rainwater infiltration.
Driveway and carpark areas will be passed through a GPT/oil arrester to
remove oils and hydrocarbons prior to infiltration.
Main roofed areas from both buildings will drain to a Rainwater Harvesting
Tank with captured runoff utilized for landscape irrigation. Tank overflow
will be directed to catchment specific RIPs.
__________________________________________________________________________
A6107/L9/SMP/RevA/Aug 2021 Page 3 of 7
SH/pl
Brah101 Pty Ltd t/as ALTA PROJECTS
Section 6
Runoff from main landscaped areas will be intercepted and conveyed via a
landscaped swale located along the site’s western boundary to a series of RIPs
and shallow landscaped basin at the south-western corner of the site.
RIPs will be aggregated within the basin and flows greater than the 1% AEP
major design event will be directed toward the POSCWPas dispersed sheet
flow via a broad weir.
Refer to engineering drawings at Appendix A for details.
5.0 RAPID INFILTRATION PITS (RIP’s)
RIPs consist of a bottomless stormwater pit which promotes infiltration
through its base.
Crushed rock and multiple layers of geofabric and “sacrificial sand” are
installed at the base of the RIP to protect against clogging of dune sands
below.
RIPs are subject to routine inspection and maintenance by the building’s body
corporate and such maintenance is critical to their ongoing function. (refer
Maintenance Schedule at Appendix B).
RIPs have been installed on all previous stages of Settlers Cove and proven to
work very well.
Refer engineering drawings at Appendix A for RIP details.
6.0 CALCULATIONS
6.1 RIP Infiltration (100year ARI events)
Alta Projects engineers (formally Tate) were involved in
formulation of the over-arching development approval
document and EMP1.
Such involvement included construction of a prototype RIP on
the Settlers Cove site and field testing to determine infiltration
rates. Results were consistent indicating a liner relationship
between driving head and infiltration rate such that:
__________________________________________________________________________
A6107/L9/SMP/RevA/Aug 2021 Page 4 of 7
SH/pl
Brah101 Pty Ltd t/as ALTA PROJECTS
Section 7
Infiltration Rate (mm/s) = 4mm/sec + 13.6 x head (m)
Refer to Appendix C for prototype test results.
In order to model the operation of the RIP’s, a spreadsheet has
been developed and utilised for all previous stages of Settlers
Cove.
Temporal patterns for Zone 3 from the Australian Rainfall and
Runoff, Volume 2 were applied. These temporal patterns were
used in conjunction with the average rainfall intensities for the
Noosa region to create a series of design storms of varying
duration for a 100-year average return interval (ARI).
Temporal patterns were converted to flow rates by breaking
each storm event into a series of short duration storms. A
triangular flow verses time approximation was used for each
sub storm with sub storm flows then added to produce flow Vs
time for RIP inflow.
Outflow and water depth were then calculated through
iterations for the duration of the storm based on the infiltration
rate / head relationship discussed above. A factor of safety of
2.0 was applied to the observed prototype infiltration rate. Each
RIP was then sized to prevent overtopping in a 100-year ARI
storm event of any duration.
Spreadsheet model results for each building are attached in
Appendix D.
6.2 Emergency Overflow (>100year ARI events)
Emergency overflow, for events (>Q100) which cannot be
wholly infiltrated by RIPs, is to be directed to the POSCWP area
as controlled sheet flow at velocities/depths which will not
induce significant scouring.
In order to achieve this outcome RIP’s are to be aggregated in
discrete basins adjacent the POSCWP areas and behind existing
boulder retaining walls. Stone pitched weirs 3m long and at a
constant height 0.2m below surrounding bunded area will
control emergency overflow into the POSCW. The rough nature
__________________________________________________________________________
A6107/L9/SMP/RevA/Aug 2021 Page 5 of 7
SH/pl
Brah101 Pty Ltd t/as ALTA PROJECTS
Section 8
of the stone pitching will also provide an “energy dissipation”
effect.
The following calculations demonstrate adequacy for lot 9: -
Running the RIP spreadsheet for 100year ARI storm of 5-minute
duration we note the following (refer Appendix D)
Qi (max) = 355 L/s at 5-minutes.
We also note that this corresponds with an available head of
3.2m (weir height above base of RIP’s) and an infiltration rate
through the RIP’s of: -
Maximum discharge outflow Qo (2.77m) = 245 L/s
Hence emergency overflow via the weir will not engage for
events <Q100 and will be contained within the designated RIP
system.
__________________________________________________________________________
A6107/L9/SMP/RevA/Aug 2021 Page 6 of 7
SH/pl
Brah101 Pty Ltd t/as ALTA PROJECTS
Section 9
A
Appendix
Engineering Drawings
[OCR of page images]
Engineering Drawings
Section 10
CARPARK/ INTERNAL PAVEMENT NOTES REINFORCED CONCRETE NOTES:
· THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALTA PROJECTS STANDARD GENERALLY, CONCRETE SHALL BE IN ACCORDANCE WITH AUSTRALIAN STANDARD SPECIFICATIONS
SPECIFICATIONS, IPWEAQ, LOCAL AUTHORITY AND DEPARTMENT OF TRANSPORT AND MAIN AS 3600 "SAA CONCRETE STRUCTURES CODE".
SE
ROADS (DTMR) AND AUSTRALIA STANDARDS. ANY CONFLICTS SHALL BE REFERRED TO THE
RE
ENGINEER FOR CLARIFICATION. IN ADDITION TO THE ABOVE CODE THE FOLLOWING AUSTRALIAN STANDARD
· ALTA PROJECTS HAVE NOT UNDERTAKEN A RISK ASSESSMENT OF THE PROPOSED CARPARK SPECIFICATIONS AND CODES OR THEIR LATEST REVISION SHALL APPLY:
LOT 10
NIT
AS 1012 PTS 1-19 METHODS FOR THE TESTING OF CONCRETE (METRIC UNITS).
DESIGN AND LAYOUT WITH RESPECT TO TRAFFIC OR PEDESTRIAN SAFETY, TRIP HAZARDS,
SP195871 WPHS REQUIREMENTS ETC. SPECIALIST ADVICE SHOULD BE SOUGHT IN THIS REGARD.
AS 3583.1,2,3,8 METHODS OF TEST FOR SUPPLEMENTARY CEMENTITIOUS.
Y
MATERIALS FOR USE WITH PORTLAND CEMENT.
SETOUT AS 3582.1 SUPPLEMENTARY CEMENTITIOUS MATERIALS FOR USE WITH PORTLAND
CL
E
10
SP195871 · EXISTING SURFACE LEVELS AND CONTOURS SHOWN ARE BASED ON DIGITAL SURVEY CEMENT- FLY ASH.
SP m
19 t
58 N
71 MODELS PROVIDED. EXISTING LEVELS MUST BE CONFIRMED ON SITE BY THE CONTRACTOR AS 1141 METHODS FOR SAMPLING AND TESTING AGGREGATES.
AND ANY DISCREPANCIES REFERRED TO THE ENGINEER. AS 1302 STEEL REINFORCING BARS FOR CONCRETE.
Emt
SP19
P
5871 · ALL CARPARK SETOUT TO BE AS PER DIGITAL CO-ORDINATES OR DIMENSIONED DRAWINGS AS 1303 HARD DRAWN STEEL REINFORCING WIRE FOR CONCRETE.
LOT 100
SP305332
R02 PROVIDED. CONTRACTOR MUST NOT RELY ON DIGITAL DRAWING FILES OR SCALING OF
DRAWINGS.
AS 1304
AS 3972
HARD DRAWN STEEL WIRE REINFORCING FABRIC FOR CONCRETE.
PORTLAND AND BLENDED CEMENTS.
100 605
SUBGRADE AS 1379 READY-MIXED CONCRETE (METRIC UNITS)
SP305332 SP195871
· SUBGRADE SHALL BE OF SOAKED CBR 15 MATERIAL OR BETTER, FREE FROM TOPSOIL, AS 2758 PART 1 CONCRETE AGGREGATES.
ORGANIC OR OTHER DELETERIOUS MATERIAL. AS 1478, 1479 CODE OF PRACTICE FOR USE OF CHEMICAL ADMIXTURES IN CONCRETE.
· SUBGRADE SHALL BE COMPACTED TO 98% MDD (AS 1289 E1.1) AND SHALL NOT SHOW AS 3610 FORMWORK FOR CONCRETE.
9
SP195871
602
MARKED DEFLECTION UNDER 8 TONNE AXLE LOAD AT PROOF ROLL. SUPPLY:
LOT 9
22 A
SP188268
65
· ALL CONCRETE IS TO BE SUPPLIED BY A LICENSED READY MIXED CONCRETE MANUFACTURER. NO ON SITE
RP mt
· ANY SOFT SPOTS SHALL BE EXCAVATED TO COMPETENT MATERIAL AND REPLACED WITH
20
E
D
SP195871 BATCHING IS ACCEPTABLE.
SP195871
SELECT MATERIAL FROM SITE OR TYPE 2.5 GRAVEL AT THE ENGINEER'S DIRECTION. · MANUFACTURERS MUST HAVE AN APPROVED AND CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE AND
606
· SUBGRADE SHALL BE GRADED TO PROFILES MATCHING FINISHED SURFACE AND ALL AREAS BE APPROVED BY THE ENGINEER PRIOR TO SUPPLY OF ANY CONCRETE.
SP195871
SHALL DRAIN TO SUBSOIL DRAINS. · ALL MATERIALS, STORAGE, BATCHING, ETC. TO CONFORM TO THE REQUIREMENTS OF THE RELEVANT
E
SP195871
LOT 606 · SUBSEQUENT PAVEMENT LAYERS MUST NOT BE PLACED UNTIL THE ENGINEER HAS AUSTRALIAN STANDARDS.
APPROVED ALL TEST RESULTS, SUCCESSFUL PROOF ROLL HAS BEEN CARRIED OUT AND THE · ALL CONCRETE TO BE NORMAL-CLASS IN ACCORDANCE WITH AS 3600 UNLESS NOTED OTHERWISE.
SP195871 ENGINEER HAS PROVIDED WRITTEN APPROVAL TO PROCEED. · ALL CONCRETE SHALL HAVE A SHRINKAGE STRAIN NOT EXCEEDING 600 MICROSTRAIN.
· ALL CONCRETE IS SPECIFIED BY 28 DAY COMPRESSIVE STRENGTH UNLESS NOTED OTHERWISE.
GRANULAR PAVEMENT · ALL REINFORCEMENT TO BE SUPPLIED BY A REGISTERED MANUFACTURER WITH AN APPROVED AND
CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE. ALL REINFORCEMENT IS TO COMPLY WITH THE
· FINAL PAVEMENT DESIGN SHALL BE DETERMINED BY THE ENGINEER UPON RECEIPT OF REQUIREMENTS OF AS 1302, AS 1303 AND AS 1304 AS APPLICABLE.
SUBGRADE SOAKED CBR RESULTS AFTER THE COMPLETION OF BULK EARTHWORKS. · ALL REINFORCEMENT IS TO BE DELIVERED TO SITE FREE FROM OIL, GREASE OR OTHER SURFACE
· ALL GRANULAR PAVEMENT SHALL COMPLY STRICTLY WITH ALL CURRENT DTMR QUALITY COATINGS WHICH MAY IMPAIR BOND TO CONCRETE.
STANDARDS FOR THE NOMINATED PAVEMENT TYPE AND SHALL BE SUPPLIED BY A DTMR · ALL REINFORCEMENT TO BE 500 MPA MINIMUM YIELD UNLESS NOTED OTHERWISE.
ACCREDITED QUARRY.
FORMWORK:
· PAVEMENT PLACEMENT SHALL NOT COMMENCE UNTIL MATERIAL QUALITY TEST RESULTS
OVERALL SITE PLAN HAVE BEEN APPROVED BY THE ENGINEER.
· ALL CONCRETE OTHER THAN CAST AGAINST GROUND, SHALL BE PLACED AGAINST TIMBER, PLYWOOD
OR STEEL FORMS.
SCALE 1:1000 A1 · PAVEMENTS SHALL BE PLACED AT DEPTHS NOT EXCEEDING 200mm AND SHALL BE · ALL FORMWORK SHALL COMPLY WITH THE REQUIREMENTS OF AS 1509 AND AS 1510.
COMPACTED TO 100% MDD (AS 1289 E1.1), SLURRIED AND TRIMMED TO PROFILE REFLECTING · REFER ARCHITECT'S DRAWINGS FOR REQUIRED FORMWORK CLASS WHERE APPLICABLE. CLASS B
FINAL DESIGN SUCH THAT A TIGHT PAVEMENT MATRIX IS ACHIEVED. FORMWORK SHALL BE ADOPTED UNLESS NOTED OTHERWISE.
· WHERE CEMENT TREATMENT IS NOMINATED BY THE ENGINEER CEMENT DESIGN AT THE · ALL TEMPORARY FORMWORK, FALSEWORK, PROPPING, BRACING, TO BE DESIGNED AND CERTIFIED
NOMINATED RATE MUST TAKE PLACE AT AN ACCREDITED PUG MILL. NO ON-SITE CEMENT BY A REGISTERED PROFESSIONAL ENGINEER (RPEQ) PRIOR TO ERECTION.
· ALL REINFORCEMENT TO BE SUPPORTED OFF FORMS WITH PLASTIC OR PLASTIC TIPPED WIRE CHAIRS
TREATMENT WILL BE ACCEPTED.
TO PROVIDE THE SPECIFIED COVER. ALL CONCRETE CAST AGAINST GROUND TO BE UNDERLAIN BY
· ASPHALT PRIME SHALL NOT BE PLACED OVER BASE COARSE PAVEMENT UNTIL: WATERPROOF MEMBRANE.
- ALL TEST RESULTS HAVE BEEN APPROVED.
- A SUCCESSFUL PROOF ROLL HAS BEEN CARRIED OUT. TRANSPORT:
- AS CONSTRUCTED SURVEY HAS BEEN APPROVED. · ALL CONCRETE IS TO BE TRANSPORTED TO SITE IN AGITATOR TRUCKS.
· CONCRETE NOT PLACED WITHIN ONE HOUR AFTER BATCHING MAY BE REJECTED AT
- ENGINEERS WRITTEN DIRECTION TO PROCEED IS OBTAINED. THE ENGINEER'S DISCRETION.
ROADWORKS NOTES: PLACEMENT, COMPACTION AND FINISHING:
· CONCRETE TO BE PLACED IN FORMS BY HORIZONTAL 'CHUTING' NO MORE THAN 3M, CONCRETE
1. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH IPWEAQ & NOOSA SHIRE COUNCIL PUMPING OR KIBBLING.
STANDARDS. · UNDER NO CIRCUMSTANCES SHALL CONCRETE BE INDUCED TO FLOW HORIZONTALLY BY USE OF
2. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE LANDSCAPE ARCHITECT'S VIBRATORS.
DESIGN DRAWINGS. · ALL CONCRETE SHALL BE PLACED CONTINUOUSLY BETWEEN CONSTRUCTION JOINTS AS DETAILED
3. SEDIMENTATION CONTROL DEVICES TO BE PROVIDED IN ACCORDANCE WITH THE IN SUCH A MANNER AS TO AVOID 'COLD JOINTS'. CONSTRUCTION JOINTS SHALL BE LOCATED AS
ENVIRONMENTAL MANAGEMENT PLAN. DETAILED ON DRAWINGS OR AS INSTRUCTED IN WRITING BY THE ENGINEER.
· ALL CONCRETE IS TO BE COMPACTED UPON PLACEMENT USING 50mm DIAMETER VIBRATORS.
4. ROAD PAVEMENTS TO BE COMPACTED TO ACHIEVE A MINIMUM DRY DENSITY RATIO (M.D.D.R.) OF
· SLABS AND BEAMS ARE TO HAVE A FILM OF APPROVED ALPHATIC ALCOHOL APPLIED TO THE
100% STD. SURFACE,
5. ALL CONDUITS TO BE IDENTIFIED BY BRASS PLAQUES ON KERB AND CHANNEL AS PER IPWEAQ DIRECTLY AFTER SCREEDING, PRIOR TO FLOATING, REGARDLESS OF WEATHER CONDITIONS.
STANDARD DRAWING R-0160 U.N.O. · ADDITIONAL PROTECTIVE MEASURES SUCH AS CHILLED MIX WATER, SHADING PLACEMENT AREAS,
6. WHERE CONCRETE DRIVEWAYS ABUT KERB & CHANNEL, THE CONTRACTOR IS TO CONSTRUCT A WIND BREAKS, ETC. MAY BE REQUIRED BY THE ENGINEER IF PLACING CONCRETE DURING
COMMERCIAL CROSS-OVER IN ACCORDANCE WITH IPWEAQ STANDARD DRAWING RS-051. UNUSUALLY HOT, DRY OR WINDY CONDITIONS.
7. PROVIDE ENERGEX AND TELSTRA CONDUITS UNDER DRIVEWAYS & FOOTPATHS (IF REQUIRED). · ALL CONCRETE SLABS SHALL BE STEEL TROWEL FINISHED UNLESS NOTED OTHERWISE.
8. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS STANDARD · BROOM FINISHING, WHERE SPECIFIED, SHALL BE CARRIED OUT AFTER STEEL TROWEL FINISHING.
· ALL CONCRETE TO BE ORDERED AND PLACED AT 80MM SLUMP UNLESS NOTED OTHERWISE.
SPECIFICATION. · NO WATER TO BE ADDED ON SITE UNLESS APPROVED BY THE ENGINEER.
9. ROADWORKS AND DRAINAGE SET-OUT INFORMATION IS AVAILABLE FOR THE CONTRACTOR VIA
COMPUTER MODEL PROVIDED BY ALTA PROJECTS. HOWEVER, ALTA PROJECTS ACCEPTS NO TESTING:
RESPONSIBILITY FOR INCORRECT SETOUT FROM THE DATA PROVIDED. CONTRACTOR SHOULD · ALL CONCRETE TESTING IS TO BE CARRIED OUT BY A NATA REGISTERED LABORATORY,
CONFIRM THE CORRECT COORDINATES WITH THE HORIZONTAL CURVE DATA PROVIDED ON IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF AS 1012.
THESE DRAWINGS. · THE FOLLOWING TESTING SCHEDULE IS TO BE ADOPTED IN ADDITION TO THE REQUIREMENTS
OF THE MANUFACTURER'S QUALITY ASSURANCE PROGRAM :
- A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH ELEMENT CAST ON ANY
GENERAL NOTES: GIVEN DAY (EG. COLUMNS, FOOTINGS, ETC)
- A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH CONCRETE STRENGTH
1. NOT ALL SERVICES HAVE NECESSARILY BEEN RECORDED AND SHOWN ON THE DRAWINGS. THE GRADE CAST ON ANY GIVEN DAY.
CONTRACTOR IS RESPONSIBLE TO LIAISE WITH THE RELEVANT SERVICE AUTHORITY PRIOR TO - A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH 50m³ OR PART THERE OF
COMMENCEMENT OF CONSTRUCTION TO DETERMINE THE LOCATION AND LEVEL OF ALL CAST ON A GIVEN DAY FOR EACH STRENGTH GRADE.
EXISTING SERVICE UTILITIES. THE CONTRACTOR SHALL BEAR THE COST OF ANY DAMAGE TO · ALL SAMPLES ARE TO BE TAKEN FROM THE AGITATOR, ON SITE.
EXISTING SERVICES. · IF WATER IS ADDED ON SITE, WITH THE ENGINEER'S PERMISSION, SAMPLES FOR TESTING
SHALL BE TAKEN AFTER THE ADDITION OF WATER.
2. THE CONTRACTOR SHALL OBTAIN ALL AS-CONSTRUCTED SURVEY FOR ROADWORKS, DRAINAGE
WORKS, SERVICE CONDUITS ETC. PRIOR TO BACKFILLING. ALL SURVEY TO BE CARRIED OUT BY A CURING:
ALL CONCRETE IS TO BE CURED BY AN APPROVED METHOD FOR A MINIMUM OF 28 DAYS AFTER FINISHING.
LICENCED SURVEYOR TO THE REQUIREMENTS OF THE SHIRE ENGINEER.
· CURING METHOD IS TO BE APPROVED BY THE ENGINEER PRIOR TO CONCRETE PLACEMENT AND SHALL
0 20 40 60 80 100m GENERALLY CONSIST OF ONE OR A COMBINATION OF THE FOLLOWING METHODS :
3. SURFACE LEVELS SHOWN ARE INTERPOLATED FROM A SPOT LEVEL SURVEY, THEREFORE - CONTINUOUS WATER PONDING.
DESIGN LEVELS BASED ON THIS INFORMATION MAY BE VARIED BY THE SUPERINTENDENT ON - COMPLETE ENCASEMENT IN A WATERPROOF FILM (EG. POLYTHENE).
SCALE 1:1000 A1, 1:2000 A3 SITE. - APPLICATION OF AN APPROVED CURING COMPOUND.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 PRELIMINARY ROADWORKS SITE PLAN AND NOTES
FOR APPROVAL Date: JUNE 2021 26 Memorial Avenue, Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No:
A6107/21/L9/PR01 A 1 of 1
STEVEN HARRISON
Email: [email protected]
A 23/08/2021 ISSUE FOR APPROVAL PBL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CAPE BOUVARD DEVELOPMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE CouncilX-LANDSCAPE
FILENAME : a6107-21-L9-R01.dwg - DATE : 23/8/21 - 2:23pm - XREF's: X-BASE; X-ARCH LOWER GROUND; X-ARCH UPPER GROUND; X-ARCH STG4B LANDSCAPE; X-ARCH STG4B LANDSCAPE LEVELS; X-ARCH STG4B LEVEL1; X-ARCH STG4B BASEMENT; X-SURVEY; X-LANDSCAPE LOWER; Ref: UPPER; 2017008 landscape base; H-Approved-SH; H-Checked-SH
Section 11
W
9
SE
.5
W
RE
12
TE
LEGEND:
.8 1
NI D
3
TY
.6
12
CL
12
W
W
OS D
PROPOSED LIGHT DUTY CONCRETE
E
2
T
E PAVEMENT AREA
2 .5
13
.512
8
.9
12
PROPOSED CONCRETE 'B'
12
PROPOSED TYPE 'B' INTEGRAL KERB
W COMMERCIAL DRIVEWAY. IN MH
T
ACCORDANCE WITH IPQEAQ STD 'B3'
W
E PROPOSED TYPE 'B3' INTEGRAL KERB
.5
8
DRG RS-051 S
0
13
W
13.
18
T
RL
MH E PROPOSED DRAINAGE NETWORK
RL
.
13
3
S
.2
W
E
T
S
13
E
69
.2 L13.20
53
PROPOSED TOP OF BATTER
4
| | | | | | | | | | | | | |
.0
W
3.
8
W
3.
S
14
.2
PROPOSED TOE OF BATTER
251
E
0 1
13 R
6
97
13
33
.50
13. .
RL 5
W
33
13.
R1L3
S PROPOSED DESIGN SURFACE LEVEL
E
RL
14
.7
.
6.2m
13
S
13
W FINISHED SURFACE CONTOUR
E
50
2
S E
.5
13.
EXISTING SURFACE CONTOUR
13
RL
5
.6 PRPO
ROP
.4
5
55
13
S E/OH EXISTING OVERHEAD ELECTRICAL
13 PERERT E
8
13
TY YB BO
13.
.
6
OUNUND
14
E/UG EXISTING UNDERGROUND ELECTRICAL
S L
.1
DARARY
R
S Y
14
T EXISTING TELSTRA RETICULATION
9
5
5%
.9
.5
.9
13 D EXISTING STORMWATER DRAINAGE
13
MA
13.5
5% MA
12
S
75
6
X
X
.7
13.
0
A
W EXISTING WATER RETICULATION
9
.1
2 0
13
m
3
.8
5
MH
RL
.6 L13.5
2.4
R0
13
.4
87
14 7.5
S EXISTING SEWER RETICULATION
.57
13
m
3.
.4
14 R
EXISTING GAS MAIN
13
G
13
3m
1
13.6
RL
m
EXISTING TREE
85
2.4
5
13.4
13.
3
9
136.
5.4
RL.9
MA 8
.9
RL
m
1 IN
13
X
12
.25
8
.7
3
8
13
.3
89
'B'
.0
13
RL
.63.50
4
14
13.
15
5
.2
ALL KERB, KERB & CHANNEL,
RL
2
1R3L1
12
3
.4
.2
.813.10
13
WHEELSTOPS & BOLLARDS TO
14
0
.1 6.1
5
13RL
BE PAINTED "SAFETY YELLOW"
15
m
12
15
5.5
.
14
m 1
9
184 RAM 'B3'
.7
.4
3
13
1
6
P1
.3
AX
7
13
.3
5M
1
5
'
.1
11
'B3
IN9
.3
1.1
15
13
3
.3
.1
13
14
LINE OF
6
.2
BUILDING
5
14 RL10.6
13
OVER
14
7 7
4
.2
2
.0 1
.1
0
.3
13
3
0 5.
5
1 1
6
.9 1
1
10.
RL
3
0
0
9 14
MA 8
.2
.5
.1
1 IN
13
.1 4
X
6
13
1R4L10.
0
13
1
.7
7
.8
14
12
0
11
13
.1
4
10.
85
13
7
5
13.
.0
RL
.9
11
RL
12
89
3
.9
13.
0
.2
3
12
RL
.6
12
10
12
8
.2
0
12
.7
12
8
.5
7
9
8
9
12
.9
.3
.9
.8
3
10
12
11
12
.6
0
12
5
.8
.2
4
4
LOT 9
12
3
.1
10
.8
.4
12
11
BASEMENT
12
12
70
8
0 2.0 4.0 6.0 8.0 10.0m
FFL10.40
.5
5
9.
.3
12
1
.4
1
12
2
8
4
.1
13.
12
.2
.8
SCALE 1:100 A1, 1:200 A3
12
12
RL
85
10
13.
RL
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Section 12
Drawn: PBL
A.B.N. 91 611 354 511 PRELIMINARY ROADWORKS LAYOUT
FOR APPROVAL Date: JUNE 2021 26 Memorial Avenue, Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No:
A6107/21/L9/PR02 A 2 of 1
STEVEN HARRISON
Email: [email protected]
A 23/08/2021 ISSUE FOR APPROVAL PBL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CAPE BOUVARD DEVELOPMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE CouncilX-LANDSCAPE
FILENAME : a6107-21-L9-R02.dwg - DATE : 23/8/21 - 2:23pm - XREF's: X-BASE; X-ARCH LOWER GROUND; X-ARCH UPPER GROUND; X-ARCH STG4B LANDSCAPE; X-ARCH STG4B LANDSCAPE LEVELS; X-ARCH STG4B LEVEL1; X-ARCH STG4B BASEMENT; X-SURVEY; X-LANDSCAPE LOWER; Ref: UPPER; 2017008 landscape base; H-Approved-SH; H-Checked-SH
Section 13
RAMP 1
18.1m
2m 1:5 MAX 2m
14.1m
35
10
13.
13.
1in8
RL
RL
2.75
2.804
RL1
2.4
1in8
RL
0.6
10
5
.4
SECTION A
SCALE 1:100 A1 R02
0 2.0 4.0 6.0 8.0 10.0m
SCALE 1:100 A1, 1:200 A3
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 PRELIMINARY DRIVEWAY LONG SECTION
FOR APPROVAL Date: JUNE 2021 26 Memorial Avenue, Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No:
A6107/21/L9/PR03 A 3 of 1
STEVEN HARRISON
Email: [email protected]
A 23/08/2021 ISSUE FOR APPROVAL PBL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CAPE BOUVARD DEVELOPMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6107-21-L9-R03 ramp section.dwg - DATE : 23/8/21 - 2:22pm - XREF's: H-Approved-SH; H-Checked-SH Council Ref:
Section 14
PROPOSED CONCRETE PAVEMENT LEVEL
180mm CONCRETE (S32)
VISQUEEN VAPOUR BARRIER SL102 MESH TOP 40 COVER
EARTHWORKS LEVEL (TO BE CONFIRMED DURING
CONSTRUCTION)
20mm SAND
DOWEL SOCKETS TO HEAVY DUTY CONCRETE PAVEMENT DETAIL
MANUFACTURERS SPEC. R24 GALVANISED DOWELS (400 LONG) AT 450 CTS
SCALE 1:10
OR EQUAL CENTRAL ADOPT 20mm RECTANGULAR SPEED SLEEVE
(DOWELMASTER OR APPROVED EQUIVALENT) AND
SL102 MESH 10mm ABELFEX OR EQUIV. &
NAILING PLATE. SLAB MOVEMENT TO BE PERMITTED IN
40 COVER ELASTOMERIC SEALANT 'PROSIL 10'
BOTH HORIZONTAL DIRECTIONS WITH VERTICAL
TO MANUFACTURERS SPEC.
MOVEMENT LIMITED TO 2mm MAXIMUM. RECTANGULAR NOMINAL FACE ALL KERBS ADJACENT CONCRETE
SLEEVES ARE TO BE STRAIGHT, HORIZONTAL AND OF KERB PAVEMENTS TO BE PAINTED
PERPENDICULAR TO THE EDGE FORM. (EXTERNAL
180
'SAFETY YELLOW'
DOWELS TO BE GALVANISED) 110 40
R20
150
200 200 1N12
200 UM VISQUEEN SETOUT POINT & LEVEL
N12 STARTERS
HEAVY DUTY CONCRETE PAVEMENT EXPANSION JOINT (DJ) AT 300 CTS.
180
300 x 140.
N.T.S
KERB TO BE CAST
INTERGRAL WITH SLAB
TOOL FINISH EDGES / BEAD & 200 UM VISQUEEN
ELASTOMERIC SEALANT 'PROSIL 10' TO
MANUFACTURERS SPEC. HEAVY DUTY INTEGRAL KERB - TYPE B
DOWEL SOCKETS TO R24 GALVANISED DOWELS @ 300CTS x 400 PAVEMENT JOINTS TO EXTEND THROUGH KERB
MANUFACTURERS SPEC. LONG CENTRAL (OR APPROVED EQUIVALENT)
OR EQUAL EPOXY FIXED TO EXISTING SLAB.
EXISTING CONCRETE
SLAB TO REMAIN NOMINAL FACE ALL KERBS ADJACENT CONCRETE
OF KERB PAVEMENTS TO BE PAINTED
180
'SAFETY YELLOW'
260 40
R20
150
250 150 1N12
200 UM VISQUEEN SETOUT POINT & LEVEL
N12 STARTERS
HEAVY DUTY CONCRETE PAVEMENT EPOXIED DOWEL JOINT (EDJ) AT 300 CTS.
180
N.T.S. 300 x 140.
KERB TO BE CAST
JOINT TO BE FILLED WITH INTERGRAL WITH SLAB
PARCHEM EMER-SEAL 200 UM VISQUEEN
PU40 (CONCRETE GREY)
HEAVY DUTY INTEGRAL KERB - TYPE B3
50 DEEP x 3 WIDE SAWCUT, MUST BE PAVEMENT JOINTS TO EXTEND THROUGH KERB
SL102 (40mm COVER) COMPLETED WITHIN 24 HOURS OF
THE COMMENCEMENT OF POUR.
NOTE: FINAL PAVEMENT DESIGN TO BE CONFIRMED
180
SAW CUTTING DEVISES THAT LEAVE THE CONCRETE SURFACE UPON RECEIPT OF SUBGRADE CBR TEST
PERMANENTLY DAMAGED OR MARKED WITH SKID PLATE MARKS,
WHEEL MARKS OR OTHERWISE TEAR, SPALL OR LIFT EDGES OF
RESULTS AT COMPLETION OF EARTHWORKS
THE CONCRETE ARE NOT PERMITTED.
600
SL62 x 600 WIDE
(45mm COVER) BTM
S32 CONCRETE PAVEMENT - SPECIAL CONDITIONS
- f'c = 32mPa
HEAVY DUTY CONCRETE PAVEMENT SAWN JOINT (SJ)
- SHRINKAGE 700um MICROSTRAIN MAX
N.T.S
- 25% MAXIMUM SUPPLEMENTARY CEMENTITIOUS
PRODUCTS
- MIX DESIGN TO BE SUITABLE FOR PNEUMATIC TYRED
VEHICLE TRAFFIC WITH MINIMAL SURFACE EROSION
- CURED IN ACCORDANCE WITH AS3799/AS3600
- 7 DAY CONTINUOUS WATER PONDING
OR
- CURING COMPOUND TO ACHIEVE 90% (MINIMUM)
MOISTURE RETENTIONS FOR 72 HOURS (MINIMUM)
'ACURE W' OR SIMILAR APPROVED.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 PRELIMINARY HEAVY DUTY PAVEMENT DETAILS
FOR APPROVAL Date: JUNE 2021 26 Memorial Avenue, Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No:
A6107/21/L9/PR04 A 4 of 1
STEVEN HARRISON
Email: [email protected]
A 23/08/2021 ISSUE FOR APPROVAL PBL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CAPE BOUVARD DEVELOPMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6107-21-L9-R04 ROADWORKS HEAVY DUTY PAVEMENT DETAILS.dwg - DATE : 23/8/21 - 2:22pm - XREF's: H-Approved-SH; H-Checked-SH Council Ref:
Section 15
D D
D D
D D
SE SE
RE RE
NI N
TY ITY
CL CL
W
OS
W
W
T
E E T
W
O SE
E
W W
T
W
T
E
W
E
W W
T
MH
T
E
MH E
W W
E
S
T
E
T
E S E
W W
W
W
S E S E
W W
S E S E
S
S
W
E
W
E
S E S E
S E S E
S
S
S
S
S S
m
MH
m
MH
2.4
2.4
7.5 7.5
m m
3m
3m
m
m
2.4
2.4
5.4 5.4
m m
TURNPATH LAYOUT - B99 - NOSE IN PARK TURNPATH LAYOUT - SRV
SCALE 1:100 A1, 1:200 A1 SCALE 1:100 A1, 1:200 A1
6.4
5.2
0.95 3.05 1.05 3.8
B99 Vehicle (8m min radius) (2004) SRV - Small Rigid Vehicle
Overall Length 5.200m Overall Length 6.400m
Overall Width 1.940m Overall Width 2.330m
Overall Body Height 1.878m Overall Body Height 3.500m
Min Body Ground Clearance 0.272m Min Body Ground Clearance 0.398m
Track Width 1.840m Track Width 2.330m
Lock-to-lock time 4.00s Lock-to-lock time 4.00s 0 2.0 4.0 6.0 8.0 10.0m
Curb to Curb Turning Radius 8.000m Curb to Curb Turning Radius 7.100m
SCALE 1:100 A1, 1:200 A3
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 PRELIMINARY TURNPATH LAYOUT
FOR APPROVAL Date: JUNE 2021 26 Memorial Avenue, Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No:
A6107/21/L9/PTP01 A 1 of 1
STEVEN HARRISON
Email: [email protected]
A 23/08/2021 ISSUE FOR APPROVAL PBL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CAPE BOUVARD DEVELOPMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6107-21-L9-TP01.dwg - DATE : 23/8/21 - 2:21pm - XREF's: X-BASE; X-ARCH LOWER GROUND; X-ARCH UPPER GROUND; X-ARCH STG4B LANDSCAPE; X-ARCH STG4B LANDSCAPE LEVELS; X-ARCH STG4B LEVEL1; X-ARCH STG4B BASEMENT; X-SURVEY; X-LANDSCAPECouncil Ref:
LOWER; X-LANDSCAPE UPPER; 2017008 landscape base; H-Approved-SH; H-Checked-SH
The text continues on section 16.
Used in these records
Attachment D - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.