Council archive · source document
Attachment D - Stormwater Management Plan · 132008.175.04
Plans and drawings: the text below has words only, no drawings.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
- Contents - 1.0 INTRODUCTION ......................................................................................... 1 2.0 EXISTING CONDITIONS ........................................................................... 2 3.0 PROPOSED DEVELOPMENT .................................................................... 2 4.0 STORMWATER TREATMENT & DISPOSAL ....................................... 3 5.0 RAPID INFILTRATION PITS (RIP’s) ....................................................... 4 6.0 CALCULATIONS .......................................................................................... 4 APPENDICES APPENDIX A – Engineering Drawings APPENDIX B – RIP Management & Maintenance Plan APPENDIX C – Prototype RIP Test Results APPENDIX D – Spreadsheet Model Results APPENDIX E – Detail Survey
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.