Skip to the record
Every meeting, every word.

Council archive · source document

Attachment D - Stormwater Management Plan · 132008.175.04

of 33

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

                                       - Contents -


1.0   INTRODUCTION ......................................................................................... 1
2.0   EXISTING CONDITIONS ........................................................................... 2
3.0   PROPOSED DEVELOPMENT .................................................................... 2
4.0   STORMWATER TREATMENT & DISPOSAL ....................................... 3
5.0   RAPID INFILTRATION PITS (RIP’s) ....................................................... 4
6.0   CALCULATIONS .......................................................................................... 4




APPENDICES

APPENDIX A – Engineering Drawings

APPENDIX B – RIP Management & Maintenance Plan

APPENDIX C – Prototype RIP Test Results

APPENDIX D – Spreadsheet Model Results

APPENDIX E – Detail Survey

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment D - Stormwater Management Plan.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.