Skip to the record
Accept no imitations.

Council archive · source document

Attachment D - Stormwater Management Plan · 132008.175.04

of 33

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                                         W
                                                                                                                                                                                                                                                                                                                                                                                  SP195871
                                                                                                                                             E
                                                                                                                                            SP m
                                                                                                                                                      WT
                                                                                                                                                      E
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        SEDIMENT & EROSION CONTROL NOTES
                                                                                                                                              19 t
                                                                                                                                                                                                                                                                                                                  D

                                                                                                                                                5  87 N
                                                                                                                                                                                                                                                                                                             X                                                                                                                                                                                                           1.     ALL SEDIMENT & EROSION CONTROL DEVICES ARE TO BE INSTALLED IN
                                                                                                                                                     1                                                                                                                                                       MH          X                   D                                                                                                                                                                                  ACCORDANCE WITH THE I E AUST SOIL EROSION & SEDIMENT CONTROL




                                                                                                                                                                                                                                                                                             W
                                                                                                                                                                                       W




                                                                                                                                                                                                                                                                                                     X
                                                                                                                                                                                           T                                                                                                                                           X                                                                                                                                                                                        MANUAL, AS DETAILED ON THIS PLAN, OR AS REQUIRED FOR COMPLIANCE
                                                                                                                                                                       MH                  E                                                                                                                                  S                                                                                                                                                                                                 WITH THE REQUIREMENTS OF THE ENVIRONMENTAL MANAGEMENT PLAN.
                                                                                                                                                                                                                W                                                                                                                                   X                    D
                                                                                                                                                                            TEMPORARY SITE
                                                                                                                                                                                        S                                                                                                                                                                                                                                                                                                                                2.    THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT & EROSION




                                                                                                                                                                                                                                                                                             X
       REFER TO DRAWING #04                                                                                                                                                                                           E




                                                                                                                                                                                                                                                                                        E
                                                                                                                                                                            CONSTRUCTION                        X                                                                                                                                        S
                                                                                                                                                                                                                                                                                                                                                                  X
                                                                                                                                                                                                                                                         W                                                                                                                                                                                                                                                                     CONTROL DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS:




                                                                                                                                                                                                                                                                                                     S
                                                                                                                                                                            ENTRY/EXIT                                                                                                                                                                                          X                    D                                                                                                                         (A) DURING CONSTRUCTION
                                                                                                                                                                                                                      S
                                                                                                                                                                            REFER DETAIL
                                                                                                                                                                                                                                          E
                                                                                                                                                                                                                                         S m
                                                                                                                                                                                                                                                             E
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   (i) DAILY DURING DRY WEATHER




                                                                                                                                                                                                                                                                                      X
                                                                                                                                                                                                                                             P19 tS P
                                                                                                                                                                            PESC02                                                                               X                                                                                                                   S
                                                                                                                                                                                                                                                                                                                                                                                              X




                                                                                                                                                                                                        X
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   (ii) PRIOR TO PREDICTED STORM EVENTS
                                                                                                                                                                                                                                                587                            X                                                                                                                            X                                                                                                                      (iii) TWICE DAILY DURING PROLONGED RAIN
                                                                                                                                                                                                                                                    1                                 MH
                                                                                                                                                                                                                                                                                                                                                                                                         MH
                                                                                                                                                                                                                                                                                                                                                                                                                         X                                                                                                         (iv) DURING AND AFTER MAJOR STORM EVENTS




                                                                                                                                                                                                   X
                                                                                                                                                                                                                                                                                                                                                                                                                                              D                                                                                (B) DURING DEFECTS LIABILITY PERIOD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   (i) WEEKLY DURING DRY WEATHER




                                                                                                                                                                                                                                                                                                                                                                                                                                      X
                                                                                                                                                                                                                                                                                                                                                                                                                   >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   (ii) PRIOR TO PREDICTED STORM EVENTS




                                                                                                                                                                                           X
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   (iii) TWICE WEEKLY DURING PROLONGED RAIN




                                                                                                                                                                                                                                                                                                                                                                                                                     >
                                                                                                                                                                                                                                                                                                                                                                       PROPOSED PIT




                                                                                                                                                                                                                                                                                                                                                                                                                                      X
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   (iv) DURING AND AFTER MAJOR STORM EVENTS




                                                                                                                                                                                                                                                                                                                                                                                                                            X
                                                                                                                                                                                                                                                                                                                                                                       PROTECTION.




                                                                                                                                                                                                                                                                                                                                                                                                                       >
                                                                                                                                                                                      X
                                                                                                                                                                                                                                                                                                                                                                       REFER DETAIL                                                                                                                                      3.     THE CONTRACTOR IS TO CONSTRUCT AN ENTRY/EXIT SEDIMENT TRAP AS




                                                                                                                                                                                                                                                                                                                                                                                                                >
                                                                                                                                                                                                                                                                                                                                                                       DRG PESC02




                                                                                                                                                                                                                                                                                                                                                                                                                               X
                                                                                                                                             TEMPORARY 6m WIDE                                                                                                                                                                                                                                                                                                                                                                  DETAILED PRIOR TO THE COMMENCEMENT OF ANY EARTHWORKS.




                                                                                                                                                                                                                                                                                                                                                                                                                    X
                                                                                                                                             CONSTRUCTION ACCESS




                                                                                                                                                                                                                                                                                                                                                                                                    >
                                                                                                                                                                                  X
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         4.     ALL STOCKPILES TO BE TEMPORARILY GRASSED & GRADED TO ENSURE




                                                                                                                                                                                                                                                                                                                                                                                                                       X
                                                                                                                                                                                                                                                                                                                                                                                                      >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                CONTROL OF RUNOFF. ALTERNATIVELY, SEDIMENT FENCES TO THE




                                                                                                                                                                                                                                                                                                                                                                                                              X
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                DOWNSTREAM FACE OF STOCKPILES ARE TO BE INSTALLED, WITH




                                                                                                                                                                                                                                                                                                                                                                                                        >
                                                                                                                                                                            X
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                CUT-OFF DRAINS UPSTREAM.




                                                                                                                                                                                                                                                                                                                                                                                                                X
                                                                                                                                                                                                                                                                                                                                                                                                >
                                                                                                                                                                                                                                                                                                                                                                                                     X
                                                                                                              100                                                                                                                                                                                                                                                                                                                                        605                                                             5.     ROUGHEN ALL SURFACES PRIOR TO TOPSOIL PLACEMENT. ROUGHENING


                                                                                                                                                                    X




                                                                                                                                                                                                                                                                                                                                                                                     >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                TO CONSIST OF LATERAL (90° TO SLOPE) GROOVES 100mm DEEP AT 2m
                                                                                                  SP305332




                                                                                                                                                                                                                                                                                                                                                                                                         X
                                                                                                                                                                                                                                                                                                                                                                                                                                                   SP195871                                                                     MAX. SPACINGS.




                                                                                                                                                                                                                                                                                                                                                                                       >
                                                                                                                                                                                                                                                                                                                                                                                              X
                                                                                                                                                               X




                                                                                                                                                                                                                                                                                                                                                                                         >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         6.     ALL EXPOSED SURFACES, ONCE COMPLETED SHALL BE IMMEDIATELY




                                                                                                                                                                                                                                                                                                                                                                                                  X
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                STABILISED TO PREVENT EROSION. ROUGHEN SURFACE BY FORMING




                                                                                                                                                                                                                                                                                                                                                                                      X
                                                                                                                                                                                                                                                                                                                                                                          >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                LATERAL GROOVES 50mm DEEP AT 1m MAX. SPACINGS AND 5m MAX.
                                                                                                                                                          X




                                                                                                                                                                                                                                                                                                                                                                            >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                LENGTHS.




                                                                                                                                                                                                                                                                                                                                                                                          X
                                                                                                                                                                                                                                                                                                                                                                              X
                                                                                                                                                                                                                                                                                                                                                                              >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         7.     SEDIMENT & EROSION CONTROL DEVICES (OTHER THAN THOSE ALREADY
                                                                                                                                                  X




                                                                                                                                                                                                                 EARTHWORKS PAD                                                                                                                                                                     ROCK DAM @ 30m CTS.                                                                                                         SHOWN) TO BE INSTALLED WHERE NECESSARY & AS DIRECTED ON SITE




                                                                                                                                                                                                                                                                                                                                                                      >
                                                                                                                                                                                                                                                                                                                                                                                  X
                                                                                                                                                                                                                 LEVEL RL10.2 (NOM)                                                                                                                                                                 REFER DETAIL DRG                                                                                                            BY THE SUPERINTENDENT.




                                                                                                                                                                                                                                                                                                                                                                       X
                                                                                                                      UP




                                                                                                                                                                                                                                                                                                                                                           >
                                                                                                                                           X                                                                                                                                                                                                                                                        PESC02
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         8.     SEDIMENT & EROSION CONTROL DEVICES ON THIS PLAN ARE INDICATIVE




                                                                                                                                                                                                                                                                                                                                                             >
                                                                                                                                                                                                                                                                                                                                                                             X
                                                                                                                                    X                                                                                                                                                                                                                                                                                                                                                                                           ONLY. IT IS THE RESPONSIBILITY OF THE SITE MANAGER TO ENSURE THAT




                                                                                                                                                                                                                                                                                                                                                                X
                                                                                                                                                                                                                                 9




                                                                                                                                                                                                                                                                                                                                                               >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                THE INTENT OF THIS PLAN AND THE ENVIRONMENTAL MANAGEMENT PLAN
                                                                                                                           X                                                                                                                                                                                                                                                                                    LEGEND                                                                                                          ARE COMPLIED WITH.




                                                                                                                                                                                                                                                                                                                                                        >
                                                                                                                                                                                                               SP195871




                                                                                                                                                                                                                                                                                                                                                                    X
                                                                                                                                                                                                                                                                                                                                                         X
                                                                                                                                                                                                                                                                                                                                                                                                                                                  PROPOSED SEDIMENT BASIN AREAS                                          9.     EROSION AND SEDIMENT CONTROL DEVICES/STRATEGIES TO BE




                                                                                                                                                                                                                                                                                                                                            >
                                                                                                                  X
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                COMPLETED PRIOR TO DISTURBANCE OF THE SITE, AND SHALL REMAIN IN




                                                                                                                                                                                                                                                                                                                                                       22 A
                                                                                                                                                                                                                                                                                                                                              >
                                                                                                                                                                                                                                                                                                                                                                                                                                                  150mm COMPACTED GRAVEL




                                                                                                                                                                                                                                                                                                                                                  RP t X
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                PLACE UNTIL PERMANENT WORKS ARE COMPLETE AND CATCHMENT




                                                                                                                                                                                                                                                                                                                                                                    65
                                                                                                                                                                                                                                                                                                                                                          X
                                                                                             X          | |   |

                                                                                                                                                                                                                                                                                                                                                                                                                                                  HARDSTAND CBR15                                                               VEGETATION IS ESTABLISHED (75% GRASS COVER MINIMUM) .




                                                                                                                                                                                                                                                                                                                                                >
                                                                                                  | |
                                                                                            | |




                                                                                                                                                                                                                                                                                                                                                   Em
                                                                          X           | |                                          PROPOSED PIT




                                                                                                                                                                                                                                                                                                                                                    20
                                                                                                                                                                                                                                                                                                                                  >
                                                                                                                                                                                                                                                                                                                                                     X
                                                                                | |
                                                                                                                                   PROTECTION.                                                                                                                                                                                                                                                                                                    150mm CBR15 TEMPORARY PAVEMENT                                         10. AREAS OF WORKS THAT REQUIRE DISTURBANCE OF SOIL SHALL BE KEPT




                                                                                                                                                                                                                                                                                                                                           X
           14.0




                                                                          | |
                                                                      |
                                                                                                                                   REFER DETAIL                                                                                                                                                                                                                                                                                                                                                                              TO A MINIMUM TO LIMIT THE EXPOSURE OF SOIL TO RAIN-DROP IMPACT




                                                                                                                                                                                                                                                                                                                                    >
                                                                                                                                                                                                                                                                                                                                                                                                                                                  BIDIM A14 GEOFABRIC PINNED TO TEMP.
                                                                  |




                                                 X          | |
                                                      | |                                                                          DRG PESC02                                                                                                                                                                                                                                                                                                                                                                                AND OTHER FORMS OF WIND/STORMWATER EROSION.
                                                | |                                                                                                                                                                                                                                                                                                                                                                                               BATTERS AS INDICATED




                                                                                                                                                                                                                                                                                                                                              X
                                                                                                                                                                                                                                                                                                                                      >
                                                                                                                                                                                                                                                                                                                                    X
                                          | |
                          X           |                                                                                                                                                                                                                                                                                                                                                                                                           (EXTENT OF BATTER PROTECTION TO BE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         11. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS
                                  |




                                                                                                                                                                                                                                                                                                                                                                                                                                                  CONFIRMED ONSITE)




                                                                                                                                                                                                                                                                                                                             >
                              |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             STANDARD SPECIFICATION.
                                                                                                                                                                                                                                                                                                                                                                                                                               8.90                PROPOSED EARTHWORKS LEVEL
                                          X




                                                                                                                                                                                                                                                                                                                                       X
                                                                                                                                                                                                                                                                                                                  >
                                                                                                                                                                                                                                                                                                                                                      PROPOSED SWALE TO DIVERT




                                                                                                                                                                                                                                                                                                                             X
                                          X                                                                                                                                       ROCK DAM @ 30m CTS.
                                                                  X                                                                                                                                                                                                                                                                                   SURFACE RUNOFF TO SEDIMENT                                                                  EXISTING SHEET PILING




                                                                                                                                                                                                                                                                                                                    >
                                                                                                                                                                                  REFER DETAIL DRG
                                                                  X                                                                                                               PESC02
                                                                                                                                                                                                                                                                                                                                                      BASIN '1'
                                                                                            X




                                                                                                                                                                                                                                                                                                                                  X
                                                                                                                                                                                                                                                                                                                      >
                                                                                                                                                                                                                                                                                                                      X
                     CO                                                                     X                                                                                                                                                                                                                                                                                                                 | | | | | | | | | | | | |   |
                                                                                                                                                                                                                                                                                                                                                                                                                                                  PROPOSED TOP OF BATTER                                                                                 ALL WORKS TO BE CARRIED OUT IN STRICT
                        N
                    ARE SERV                                                                                      X
                                                                                                                  X                                                                                                                                                                                               >                                                                                                                               PROPOSED TOE OF BATTER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         ACCORDANCE WITH APPROVED SETTLERS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         COVE NOOSA RESIDENTIAL HIGH DENSITY
                       A (P ATIO                                                                                                                                                                                                                                                                                                       PROPOSED PIT                                                                 > > >
                                                                                                                                                                                                                                                                                                                         X
                           OS                                                                                                  X                                                                                                           SEDIMENT BASIN '1'.
                                                                                                                                                                                                                                                                                                                  X
                                                                                                                                                                                                                                                                                                         >>
                              CW N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         ENVIRONMENTAL MANAGEMENT PLAN (EMP1)
                                                                                                                                        X> >
                                P)
                                                                                                                               X                                                                                                           REFER DETAIL                                                                                PROTECTION.
                                                                                                                                                                                                                                                                                                                                       REFER DETAIL
                                                                                                                                                                                                                                                                                                                                                                                                    606                                           PROPOSED SWALE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         DATED 21 JULY 2005 BY WBM OCEANICS.
                                                                                                                                        X    > >                                                                                                                                                                                       DRG PESC02                                             SP195871                                            FINISHED SURFACE CONTOUR
                                                                                                                                                                                                                                                                                                                  X

                                                                                                                                           X      > >
                                                                                                                                                                                                                                                                                                         >
                                                                                                                                                                                                                                                                                                         X




                                                                                                                                           X                                                                                                                                                                                                                                                                                                      EXISTING SURFACE CONTOUR
  HABITAT PROTECTION FENCE TO BE ERECTED                                                                                                       X      > >                                                                        | | | | | | | | | | |   |
                                                                                                                                                                                                                                                             | | | | | | | | | | | | | | | | |   |
                                                                                                                                                                                                                                                                                                                              ROCK DAM @ 30m CTS.
                                                                                                                                                                                                                          |




  PRIOR TO COMMENCEMENT OF CLEARING WORKS                                                                                                      X          > >                                                                                                                                                                                                                                                              E                      EXISTING ELECTRICAL RETICULATION
                                                                                                                                                                                                                                                                                                             X
                                                                                                                                                                                                                          | | | | |




                                                                                                                                                                                                                                                                                             | | |




                                                                                                                                                                                                                                                                                                                              REFER DETAIL DRG
                                                                                                                                                    X                                                > >
                                                                                                                                                                                                                                                                                                     X




  PROVIDE SIGNAGE AT 50m SPACINGS " ECOLOGICAL                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ALL BATTER GRADIENTS
                                                                                                                                                   X                                                                                                                                                                          PESC02                                                                                       T                      EXISTING TELSTRA RETICULATION
                                                                                                                                                                                                                                                                                                 |




  RESTORATION AREA - NO ACCESS                                                                                                                         X                                                                          |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      TO BE CONFIRMED BY
                                                                                                                                             E                                                                               |
                                                                                                                                                                                                                                                         | | | | | | | | | | | | | | | | |
                                                                                                                                                                                                                                                                                             |




                                                                                                                                                                                                                                                     |
                                                                                                                                                                                                                                                                                                                                                                                                                           D                      EXISTING STORMWATER DRAINAGE
                                                                                                                                                       X
                                                                                                                                                                                                                                                                                             |




                                                                                                                                                                                                                                                                                                         X




                                                                                                                                                           X                                           X              X                                          X           X               X                                                                                                                                                                                                                                                        GEOTECHNICAL ENGINEER
                                                                                                                                                                                                                                             XX
                                                                                                                                                                                                                                                                                                                                                                                                                           W                      EXISTING WATER RETICULATION
                                                                                                                                          SP195871         X                                           X              X                                          X           X               X
                                                                                                                                                                                                                                                                                     ESC03




                  ALL WORKS IN PROXIMITY OF RETAINED
                                                                                                                                                                                                                                                                             S1




                                                                                                                                                                                                                                                                                                                                                                                                                           S                      EXISTING SEWER RETICULATION
                  TREES TO BE CARRIED OUT IN STRICT                                                                            PROPOSED SWALE TO DIVERT
                  ACCORDANCE WITH ARBORISTS DIRECTIONS                                                                         SURFACE RUNOFF TO SEDIMENT                                                                                                                                                                             INCOMING STORMWATER PIPE TO STOP                                             X              X               PROPOSED SILT FENCE (INCLUDING 2.0m
                                                                                                                               BASIN '1'                                                                                                                                                                                              SHORT OF RIP. DISCHARGE TO SURFACE                                                                          WINGS AT 5.0m CENTRES)
                                                                                                                                                 INCOMING STORMWATER PIPE TO STOP                                                                                                                                                     OF TEMPORARY BASIN DURING
                                                                                                                                                                                                                                                    PROPOSED 3m WIDE
                                                                                                                                                 SHORT OF RIP. DISCHARGE TO SURFACE                                                                                                                                                   CONSTRUCTION WORKS. NO                                                                                      ROCK DAM @ 30m CTS.
                                                                                                                                                                                                                                                    EMERGENCY (>Q100)
                                                                                                                                                 OF TEMPORARY BASIN DURING                                                                                                                                                            CONNECTION UNTIL APPROVED IN                                                                                REFER DETAIL DRG PESC02
                                                                                                                                                                                                                                                   OVERFLOW WEIR RL9.05
                                                                                                                                                 CONSTRUCTION WORKS. NO                                                                                                                                                               WRITING BY ENGINEER                                                                                                                                                                                                        0     4         8            12       16       20m
                                                                                                                                                 CONNECTION UNTIL APPROVED IN
                                                                                                                                                 WRITING BY ENGINEER                                                                                                                                                                                                                                                                              PROPOSED PIT PROTECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            SCALE 1:200 A1, 1:400 A3


NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
                                                                                                               PURPOSES.
                                                                                                                       PBL                                                                                                                                                                                                                                                          PROJECT:                                                                                                                                        DRAWING TITLE:
                                                                                                                                                                                                                                                                                                                        Brah 101 pty ltd t/a Alta Projects
                                                                                                                                                                                        Drawn: PBL
                                                                                                                                                                                                                                                                                                                        A.B.N. 91 611 354 511                                                                                                                                                                                       PRELIMINARY EROSION AND SEDIMENT CONTROL
                                                                                                                                                  FOR APPROVAL                           Date: JUNE 2021                                                                                                                26 Memorial Avenue, Cotton Tree                             PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
                                                                                                                                                           NOT FOR CONSTRUCTION                                                                                                                                         PO Box 559, Cotton Tree, QLD, 4558                                                                                                                                                                                                                             Revision         Sheet
                                                                                                                                                                                      Checked:. . . . . . . . . . .
                                                                                                                                                                                                                                                                                                                        Tel (07) 5475 4125 Fax (07) 5479 1607                       at SERENITY CLOSE, NOOSA                                                                                                                        DRAWING No:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         A6107/21/L9/PESC01               A            1 of
                                                                                                                                                          STEVEN HARRISON
                                                                                                                                                                                                                                                                                                                        Email: [email protected]
  A     23/08/2021    ISSUE FOR APPROVAL                                                                                             PBL   S.H.
                                                                                                                                                  .......................
                                                                                                                                                      DIRECTOR APPROVAL                    Datum AHD
                                                                                                                                                                                                                                                                                                                        Web: http://www.alta.net.au                                 for CAPE BOUVARD DEVELOPMENTS
 REV     DATE                                                             DESCRIPTION                                                BY    CHKD       RPEQ - 4784                              A1 SHEET SIZE                                                                                                                                                                                                                                                                   Council
                                                                                                                                                                                                                                 FILENAME : a6107-21-L9-ESC01.dwg - DATE : 23/8/21 - 2:24pm - XREF's: X-BASE; X-ARCH LOWER GROUND; X-ARCH UPPER GROUND; X-ARCH STG4B LANDSCAPE; X-ARCH STG4B LANDSCAPE LEVELS; X-ARCH STG4B LEVEL1; X-ARCH STG4B BASEMENT; X-SURVEY; X-LANDSCAPE LOWER; Ref:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        X-LANDSCAPE UPPER; 2017008 landscape base; H-Approved-SH; H-Checked-SH

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment D - Stormwater Management Plan.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.