EROSION & SEDIMENT CONTROL MANAGEMENT PLAN
Comply with all statutory regulations and maintain the during earthworks Refer Best Practice Erosion and
Objective / Target construction. Comply with the Major Erosion and Sediment Control Plan Sediment Control Manual - Section
by ALTA PROJECTS to control erosion and sediment flows. 5 checklist
3.0m
SILT FENCE BY SEDIMENT FENCE LENGTH AS REQUIRED 1.5m 1.5m
MAX.
Site foreman to identify and check direction of stormwater flows as GEOFABRICS
700
BY GEOFABRICS
shown on plan. Provide barriers and other measures shown on plan and Utilise B.P.& S.C. Manual
0.5m
MAX
Management Strategy
within council guidelines to prevent stormwater flows over Inspection Form Section 7
embankments and minimise sediments into gully pits. N.S.L. N.S.L.
N.S.L.
200 MIN 3 MAX 3 MAX BIDIM A14 GEOFABRIC
200 MIN
1 1
Implement and maintain control measures identified on the Erosion and Utilise Section 7 - B.P.& S.C. POSTS AT 3m CENTRES WITH WIRE
Task / Actions SECTION MESH BACKING or 2m WITHOUT. ALL
Sediment Control Plans. Manual checklist TYPICAL SWALE DETAIL
POSTS DRIVEN 600mm INTO GROUND.
NTS
PERIMETER SILT FENCE
Site foreman to check for erosion and sediment flows at the base of SCALE 1:50
Utilise Section 7 - B.P.& S.C.
Performance Indicators embankments after rain. Check that all sediment fences and check
Manual checklist SEDIMENT FENCES SHALL BE CONSTRUCTED WITH RETURNS AT
dams are working correctly during rain events.
INTERVALS IN ACCORDANCE WITH "IECA BEST PRACTICE EROSION
CONTROL MANUAL" AND MAXIMUM 20m SPACINGS FOR FENCES
ALONG CONTOURS AND 10m FOR ON-GRADE.
Inspection of all control structures shall be undertaken prior to expected
rainfall events and at least twice weekly. All minor structures such as Refer drawing ESC01 for
Frequency / Deadline
windrows, sediment fences etc, shall be inspected at the completion of frequency
each day.
ENTIRE VERGE TO
Responsible Person / The implementation of the Major Erosion and Sediment Control Plan is Refer Erosion and Sediment
BE TURFED.
Organisation the responsibility of the Principal Contractor. Control Plan Section 6.0
Principal contractor to provide a monthly copy of record sheets
Refer Erosion and Sediment
Reporting / Review identifying test results for water quality testing. Site workman to advise "BIDIM A34" BY GEOFABRICS OR APROVED
Control Plan Section 6.0
foreman if they notice any barrier needing repair. EQUIVALENT. INSTALLED AS SHOWN
GRATED INLET
Should inspection reveal deficiencies, the Contractor shall report issues NCR form to be utilised refer PIT IN ROADWAY 2%
Corrective Actions
to Supervising Engineer. Section 7 - B.P.& S.C. Manual
4.25m
ELEVATION PLAN
NOTE: A SAFE STORAGE LOCATION FOR FUELS AND OILS SHALL BE PROVIDED IN ACCORDANCE WITH AS1940 “THE STORAGE
AND HANDLING OF COMBUSTIBLE LIQUIDS”. THIS AREA SHALL BE BUNDED IN COMPLIANCE WITH THE STANDARD AND RELEVANT
ALLOTMENT PIT PROTECTION DETAIL TURF VERGE DETAIL
REQUIREMENTS OF AUTHORITIES. SCALE 1:20 SCALE: 1:50
TYPICAL LIP-IN-LINE
GULLY PIT ROCK CHECK DAMS SHALL BE LOCATED IN ALL CUT OFF DRAINS IN
Construction Site
5 Cattle grid 3.0m NOM width ACCORDANCE WITH IEAC STANDARD DRAWING RCD -01
MINm
NOM
set 300mm above ground
100
FORM U-SHAPED CREST TO
10 NOTE: ENSURE OVER TOPPING AT
MIN m 600mm CENTRE OF DAM
Contractor to provide a wash
down facilty in conjunction 150mm MIN
300
Geotextile fabric, 2
Bidum U34 or similar with the proposed cattle grid. 1
0.3m-0.5m
DIRECTION OF FLOW
PROVIDE GEOTEXTILE 3 m IN
FABRIC WRAP OVER GRATE M To
KERB & CHANNEL Ex 150mm ROCK SPALLS EMBED 200mm
ter
75 - 100mm nal INTO GROUND
CRUSHED ROCK Ro GEOTEXTILE
ad
GEOTEXTILE TUBE FABRIC
PROVIDE SAND FILLED 100Ø
ROCK CHECK DAM
SLOTTED AG DRAIN, CONSTRUCTION EXIT SCALE 1:50
WRAPPED IN GEOFABRIC, or
APPROVED EQUIVALENT,
TO FRONT OF CHAMBER
INLET PIT PROTECTION DETAIL (IP)
SCALE 1:20
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 PRELIMINARY EROSION AND SEDIMENT CONTROL DETAILS
FOR APPROVAL Date: JUNE 2021 26 Memorial Avenue, Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No:
A6107/21/L9/PESC02 A 2 of
STEVEN HARRISON
Email: [email protected]
A 23/08/2021 ISSUE FOR APPROVAL PBL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CAPE BOUVARD DEVELOPMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6107-21-L9-ESC02 - DETAILS PLAN.dwg - DATE : 23/8/21 - 2:24pm - XREF's: H-Approved-SH; H-Checked-SH Council Ref:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.