1.0 INTRODUCTION
This report is lodged in support of a Minor Change application to Noosa
Council seeking to develop residential unit buildings at Lot 9 SP195871,
Serenity Close, Noosa Heads.
The proposed development represents the fourth stage of residential unit
buildings developed by Cape Bouvard over the greater Settlers Cove site with
Alta Projects’ engineers having completed stormwater design, inspection and
certification for all previous stages.
Design solutions presented in this report are consistent with those previously
adopted with minor refinements borne of experience.
1. In particular, this report addresses stormwater management issues
raised, at conditions 41 to 45 of Material Change of Use Decision
Notice 132008.175.03 dated 6 August 2019.
41. A stormwater management plan shall be prepared by a RPEQ,
specialising in stormwater and water quality management incorporating the
principles of the Environmental Management Plan for the Settlers Cove
Development (23118 DA), that demonstrates water
reuse strategies, infrastructure capacity and effective treatment methodology.
The use of rainwater harvesting tanks for irrigation purposes shall be
incorporated in the overall design plans. These plans shall be submitted to
Council for approval prior to obtaining a
Development Permit for Operational Works.
` 42. Roof runoff from any new building should be directed to a rainwater
storage system or tank (minimum 23,000 litres) that is installed to ensure
water from the rainwater storage system or tank is used for external uses
(such as watering gardens, irrigation, ornamental ponds, water features,
topping-up swimming pools, outdoor cleaning, etc) and for internal (ground
floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks
are to be designed and installed in accordance with the approved Stormwater
and Water Quality Management Plan and the Queensland Development
Code (QDC) current at the time of building approval, and shall be part of the
plumbing application for approval. The location and capacity of the tanks shall
be clearly shown on the plans submitted for Building Works/Operational
Works approval and any overflow shall be directed to the stormwater
drainage system.
43. All stormwater drainage shall be collected on site and discharged so there
is no net increase in stormwater runoff from the site.
44. To ensure that polluted run-off does not enter the water table, the
adjoining waterways or Council’s stormwater drainage system, stormwater
run-off from the car parking areas and the driveways shall have the first flush
(the first 12mm of rainfall or hose-down) collected in
__________________________________________________________________________
A6107/L9/SMP/RevA/Aug 2021 Page 1 of 7
SH/pl
Brah101 Pty Ltd t/as ALTA PROJECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.