Minor Change Existing Approval - 151999.982601.3 (As Published)

of 9

Text shows just the words. Original shows the document exactly as it was published.

               4.     ASSESSMENT MANAGER CONDITIONS

               1.     The lot reconfiguration shall be in accordance with plan LAND/PRO.B dated 20/2/02 as
                      submitted by Murray and Associates except as modified herein.
               2.     Pursuant to Section 3.5.21(6) of the Integrated Planning Act 1997, the currency period shall
                      extend to 14 December 2002. By this date, all conditions must have been complied with,
                      operational works completed, and the revised Plan of Survey lodged with Council for
                      endorsement.
               3.     Roadworks within the proposed access easements shall be constructed to a sealed access
                      road standard in accordance with Council's standard drawing No. 9013.
                      If the length of easement exceeds 100 metres, passing lanes shall be provided at appropriate
                      locations, no more than 60 metres apart, in accordance with Council's standard drawing No.
                      9035.
                      The length of easement and access road construction on Lot 10 shall extend past the existing
                      dam on Lot 9 to provide access to the house site area.
               4.     All roads shall be constructed to Council’s Engineering Design Standards. Boronia Road
                      shall be constructed to Council’s local road standard. Eucalypt Way and Callistemon Court
                      shall be constructed in accordance with Council’s access road standard.
                      Drawings prepared by a Registered Professional Civil Engineer of Queensland are to be
                      submitted to Council for approval by the Manager of Land Development.
               5.     The entrance driveways to all lots affected by flooding shall have driveways constructed from
                      the roadways to the indicated house envelope. This driveway is to be constructed to the
                      same flood requirements as the internal road designs and shall be constructed from
                      compacted gravel to Council’s Engineering Design Standards.
               6.     The proposed access easements shall be a minimum of 10.0 metres wide with the width
                      being increased where necessary to accommodate passing lanes, bin storage areas and
                      services or to provide the specified clearances from cut/fill batters. All services shall be
                      installed for the full length of the access strip prior to pavement construction.
               7.     A 3.0 metre wide concrete driveway shall be constructed within a 4.5 metre wide battleaxe
                      access strip for Lot 19. All service conduits shall be installed for the full length of the access
                      strip prior to pavement construction.
               8.     Access to each lot shall be constructed to the standards and requirements of the Manager -
                      Land Development and in accordance with Council's standard drawing No. 9040.
               9.     Speed humps and appropriate signage are to be constructed along Boronia Road,
                      commencing in the vicinity of the northern boundary of Lot 20.
                      Full details, include appropriate signage, are to be submitted in conjunction with an
                      application for Development Permit - Operational Works.
               10.    Where lots are serviced by access easements a refuse collection area is to be established
                      within the road reserve for the placing of wheelie bins on collection day. The area is to be
                      sufficient in size for the placement of one wheelie bin from each property and located so as
                      not to impede the flow of traffic. Details of the refuse collection area are to be submitted in
                      conjunction with an application for Operational Works.
               11.    The existing dam on Lot 4 is to be filled in to increase the area available for a house site and
                      effluent disposal.
                      Filling works are to be carried out in accordance with Section 3.8 of Council's "Engineering
                      Design Standards" manual and so as not to cause the ponding of water on any adjoining
                      lands or the blockage of, or interference with, any natural watercourses. No earthworks or
                      filling works are to be undertaken until issue of a Development Permit for Operational Works
                      in respect of filling works.




                                                                                                          Page 2 of 9
Document Set ID: 25155678
Version: 5, Version Date: 16/09/2026

Used in these records

About this file

File size
169 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 151999.982601.3 (As Published).pdf · 169 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.