               12.    All engineering works involving the construction of street pavements, kerb and channel,
                      footpaths, turnouts, underground drainage, water supply and sewage reticulation, must be
                      designed and constructed to the standards and requirements of Council’s “Engineering
                      Design Standards” Manual.
                      The engineering drawings and specifications associated with these works are to be prepared
                      by a Registered Professional Civil Engineer, Qld. Pursuant to Section 5.2 if the Local
                      Government (Planning and Environment) Act, prior to any works commencing, engineering
                      drawings and specifications are to be submitted to Council and approved by the Manager of
                      Land Development.
               13.    The subdivision is to be landscaped in accordance with Council’s Policy on Landscaping
                      Guidelines and a properly prepared landscaping plan is to be submitted and approved by the
                      Manager of Land Development prior to the issue of approval of engineering drawings. The
                      landscaping plans are to address:-
                      13.1. street tree planting
                      13.2. buffer areas
                      13.3. removal of undesirable species
                      Such landscaping is to be completed in accordance with the approved landscaping plan prior
                      to acceptance of the development on maintenance and maintained thereafter during the
                      maintenance period to the reasonable satisfaction of the Manager of Land Development.
               14.    The proposed names of the new roads, parks and access easements serving more than
                      three allotments (private roads) are to be submitted for approval by Council in conjunction
                      with the engineering designs for the roadworks. Names are to be selected from wither of the
                      following categories:-
                      14.1. Easily pronounced words of the Aboriginal Language.
                      14.2. Names or words of local significance or historical interest.
                      14.3. Flora, fauna, industry, topographical, geological and similar features and terms relative
                            to the district.
                      14.4. Surnames of persons of merit or historical significance. Personal names should be
                            avoided.
                      Approval will not be given where the name is the same or similar to the name of another road
                      in the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily
                      pronounced, or may cause confusion to emergency services are to be avoided.
                      The applicant is responsible for erecting street signs on new public roads. On private roads
                      the nameplate and signpost will be provided and erected by Council upon payment of the
                      appropriate fee.
               15.    Provision of a State Survey Mark within the subdivision to Council’s satisfaction which shall
                      be levelled and located to the requirements of the Manager of Land Development. The Form
                      6 shall be submitted for Council’s records.
               16.    Prior to Council giving approval for the construction of roadworks or services associated with
                      this stage, the applicants are to submit a $50,000 bond to ensure compliance with the
                      conditions contained within this approval. The bond will be returned following acceptance of
                      all works “On Maintenance”.
               17.    The applicant shall contribute towards roadworks in accordance with Council’s policy for
                      contributions within the Junction Road Catchment. The current contribution rate is $4,214
                      per additional lot. This contribution is subject to CPI variation from February 1996 and any
                      alterations made to Council’s Policy.
               18.    All suitable native trees shall be retained where possible and the applicant shall undertake a
                      footpath tree planting programme on completion of the roadworks.



                                                                                                        Page 3 of 9
Document Set ID: 25155678
Version: 5, Version Date: 16/09/2026

Used in these records

About this file

File size
169 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 151999.982601.3 (As Published).pdf · 169 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.