Council archive · source document
Volume 2 - Code Responses · 132006.823
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
AND
S11.2 Not Applicable.
Road and drainage design and construction is in
accordance with Sections 3 and 4 of PSP5
Engineering Design Standards Roads, Drainage
and Earthworks.
Road and rail corridors
O12 S12.1 Complies with probable solution.
Noise sensitive uses including residential uses are Noise sensitive uses including residential uses are Development complies with separation distances
not subjected to high traffic noise levels from the separated by a minimum of to major roads and rail corridors nominated.
major road network or rail corridors. a) 40m from the property boundary of roads
within the major road network; and
b) 80m from the property boundary of rail
corridors;
OR
S12.2 Not Applicable.
Development in the vicinity of road corridors
meets the following external design criteria for
roads in the major road network
a) 63dB(A)L10 (18hours) based on predicted
traffic volumes ten years hence;
AND
S12.3 Not Applicable.
Development in the vicinity of rail corridors meets
the following external design level noise criteria
a) 65dB(a), assessed as the 24hour average
equivalent continuous A-weighted sound
pressure level; and
b) 87dB(A), assessed as a single event maximum
sound pressure level.
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Transport, Roads and Drainage Code 11 April 2006 Page 111
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.