Skip to the record
Every meeting, every word.

Council archive · source document

Volume 2 - Code Responses · 132006.823

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                    COLUMN 1                                                  COLUMN 2                                                 ASSESSMENT
              SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS (if code assessable)
O10                                                       S10.1                                                      Not applicable.
Alignment of stormwater drainage infrastructure is        The location, design and construction of                   Council maintained stormwater drainage
to allow for easy access for the ongoing maintenance      stormwater drainage structures is in accordance            infrastructure is not required as part of the
by Council.                                               with Sections 4 and 5 of PSP5, Engineering Design          development.
                                                          Standards - Roads, Drainage and Earthworks;
                                                          AND

                                                          S10.2
                                                          Where infrastructure is located on private land an         No new easements are required.
                                                          easement is dedicated over the infrastructure in
                                                          accordance with Section 4 of PSP 5, Engineering
                                                          Design Standards Roads, Drainage and
                                                          Earthworks.
Frontage works
O11                                                       S11.1                                                      Complies with probable solution.
Development is provided with external roadworks           The following infrastructure components already            The nominated external infrastructure components
along the full extent of the frontage of the site to an   exist at the frontage of the site or are provided at the   already exist at the site frontage. All infrastructure
appropriate standard having regard to the specified       developer s expense                                        required external to the site has previously been
function of the road.                                     a) full width sealed road;                                 constructed in accordance with the requirements
                                                          b) concrete kerb and channel where appropriate;            of the CAS.
                                                          c) forming and grading to footpaths;
                                                          d) vehicular kerb and footpath crossings;
                                                          e) a constructed bikeway;
                                                          f) a constructed footpath;
                                                          g) a constructed carriageway;
                                                          h) required alterations to public utility mains,
                                                             services or installations;
                                                          i) construction of any required alterations to
                                                             public utility mains, services or installations;
                                                          j) stormwater drainage works; and
                                                          k) installation of electrical conduits;

                                                                                                                                                        Volume II: Code Responses

                                                                                                                                                        Viridian Noosa Project
                                                                                                                                                        Viridian Stage 3

Transport, Roads and Drainage Code                                                                                                                      11 April 2006     Page 110

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.