                     COLUMN 1                                        COLUMN 2                                     ASSESSMENT
              SPECIFIC OUTCOMES                       PROBABLE SOLUTIONS (if code assessable)
                                                                                                subsequently overlaid with a minimum of 500 mm
                                                                                                of clean compacted fill capping layer.
                                                                                                Part of the proposed Stage 3 Viridian development
                                                                                                includes construction work in the area where the
                                                                                                cell is currently located. Options, including
                                                                                                transferring the cell to another portion of the site,
                                                                                                have been considered. However, it is proposed to
                                                                                                remove all material contained in the cell to an off-
                                                                                                site waste containment facility. All works will be
                                                                                                undertaken in accordance with authority from the
                                                                                                EPA. The removal will be undertaken in advance
                                                                                                of construction.
Haulage activity and amenity
O7                                                  S7.1                                        Complies with specific outcome.
Haulage of material to and from a site ensures      No solution provided.                       Cut to fill earthworks are being designed for the
a) minimal disturbance to neighbouring properties                                               development. An earthworks balance is possible
   and properties along the haulage route; and                                                  and levels are being established to achieve this. If a
b) Council s road infrastructure including                                                      balance cannot be achieved fill material will need
   pavements is not adversely affected.                                                         to be imported to the site with a maximum
                                                                                                quantity of 5,000m3 being a realistic upper limit.
                                                                                                The contaminated material currently stored in a
                                                                                                containment cell will need to be removed from the
                                                                                                site. Careful consideration will be given to the
                                                                                                removal process such that access to and from
                                                                                                Viewland Drive creates the least possible
                                                                                                disturbance. The contractor will be limited in the
                                                                                                number of heavy vehicles accessing Viewland
                                                                                                Drive per day by careful control of scheduling of
                                                                                                deliveries and removal of material. Therefore no
                                                                                                impact will result on properties along a haulage
                                                                                                route or on Council road pavements.
                                                                                                                                   Volume II: Code Responses

                                                                                                                                   Viridian Noosa Project
                                                                                                                                   Viridian Stage 3

Water Sensitive Design Code                                                                                                        11 April 2006     Page 134

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.