Council archive · source document
Volume 2 - Code Responses · 132006.823
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
e) minimising impacts associated with pest insect
control and invasion by undesirable plant species;
and
f) providing for the rehabilitation and replanting
of degraded wetlands.
Riparian buffers
O5 S5.1 Complies with specific outcome.
The biodiversity and ecosystem values of No new development occurs on, or partly on, a) No development is proposed within the
watercourses, drainage lines, wetlands and premises indicated as Riparian Buffer on Biodiversity riparian buffer 10 metres either side of the
adjacent riparian zones are protected by Overlay Maps OM1.1 to OM9.1, except for drainage line.
a) avoiding any new development in the riparian a) temporary use of the land; or b) The vegetation within this corridor is to be
buffer; b) infrastructure which provides access to a retained and rehabilitated under the approved
b) retaining aquatic and terrestrial habitat; watercourse for recreational purposes; rehabilitation plan of the CAS.
c) maintaining wildlife corridors along watercourses OR c) The existing wildlife corridor is not adversely
and drainage lines for native fauna movement; impacted by the development. This is ensured
S5.2
d) avoiding edge effects and incompatible uses in by the environmental covenant area.
Where Detached house and located on an
riparian zones; d) The edge between the riparian corridor and
allotment situated wholly within the Riparian
e) maintaining bank stability by minimising bank the proposal is minimised as a result of the
Buffer, the following minimum building setbacks
erosion and slumping; fingers as discussed by Edaw s landscaping
measured from mean high water mark are
f) maintaining water quality by filtering report at Volume 3.
complied with
sediments, nutrients and other pollutants; and e) Buildings located in close proximity to the
a) if within the Coastal Protection Precinct as
g) removing undesirable plant species and replacing riparian corridor are located at or above
identified on the Natural Resources Overlay
them with vegetation of local origin. existing ground level with suspended lower
Maps in accordance with Schedule 1
levels resulting in the provision of undercrofts
Minimum Boundary Setbacks; or
ie. no excavation is proposed beneath the bank
b) Otherwise 40m;
line.
OR
f) Erosion and sediment control devices will
minimise any adverse effects of construction
S5.3
on water quality, effectively protecting
For Animal husbandry on premises in the Rural
downstream watercourses, native vegetation,
Zone
drainage lines and groundwater during the
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Biodiversity Overlay Code 11 April 2006 Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.