COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
a) stock proof fencing is installed along construction period. Water quality will be
watercourses at a distance of no less than 10m enhanced after the completion of construction, as
from the top of the bank; the proposed development of the original Viridian
b) stock watering points are located no less than site incorporates significant revegetation of the
15m away from the top of the bank of property grounds, and pergolas are not proposed
watercourses; and to be located within 10m from the top of bank. It
c) stock crossing points across watercourses are should be noted that the existing Alma Way
defined and controlled with stock proof typically exists between proposed Recreational
fencing, to prevent stock from damaging facilities and the top of the Bank.
riparian vegetation or banks to watercourses;
OR A GPT device will be incorporated on all drainage
lines, together with an oil and grease arrestor on
S5.4 drainage from car park areas prior to discharge to
Recreational facilities (including playgrounds, the drainage line running through the site.
pergolas, barbeques etc) are setback a minimum of
30m from the top of the bank of a watercourse and BBQs, playgrounds, and pergolas are not proposed
10m from the top of the bank of a drainage line; to be located within 10m of the top of the bank. It
should be noted that the existing Alma Way as
O6 S5.5 and S6.1
approved b y the CAS typically exists between
Wetlands are protected from removal or For Forestry uses the cultivated area is separated
proposed recreational facilities and the top of the
degradation and any impacts on wetlands are from watercourses and wetlands by a distance not less
bank.
prevented, minimised or mitigated by than the distances identified below, measured from
a) maintaining adequate separation between the high water mark or the top of the bank, whichever
No wetlands occur on the subject site. No Forestry
wetland and any adjacent development or is the greater distance, or for wetlands, the edge
is proposed as part of the proposal.
use10; of the wetland
b) minimising any modification of the natural
characteristics of the wetland, including the Feature Distance
topography, surface and groundwater Stream order 1 or 2 5m
hydrology, water quality and flora and fauna Stream order 3 or 4 10 m
species; Stream order greater than 4 20 m
Wetlands 100 m
10 The extent of separation will be determined from the size, values and vulnerability of the wetland, likely natural fluctuations, and the nature of potential threats to its integrity and function.
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Biodiversity Overlay Code 11 April 2006 Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.