Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Volume 2 - Code Responses · 132006.823

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                     COLUMN 1                                              COLUMN 2                            ASSESSMENT
               SPECIFIC OUTCOMES                          PROBABLE SOLUTIONS (if code assessable)
Engineering and site works
O15                                                     S15.1
Development is sited and designed to                    Works, including roads, driveways, fences, sewer
a) provide adequate separation distance between         lines and other infrastructure
    the vegetation to be protected and the              a) do not transect areas of vegetation; or
    development to avoid disturbing, destabilising      b) are co-located within a combined utility
    and deoxygenating any tree or altering the               corridor; and
    drainage;                                           c) provide for fauna underpasses, speed reduction
b) avoid traversing or fragmenting vegetation or             devices and associated fencing, lighting and
    habitats for significant flora and fauna species;        warning signs, where appropriate;
    and                                                 AND
c) avoid creating barriers to faunal movement.
                                                        S15.2
                                                        Development within or adjacent to areas of
                                                        vegetation, incorporates fences that allow for
                                                        protected fauna movement and to control
                                                        unrestricted access of domestic cat and dogs;
                                                        AND
                                                        S15.3
                                                        Vegetation is protected from interference resulting
                                                        from clearing or construction activities by
                                                        a) clearly marking vegetation to be retained with
                                                            flagging tape;
                                                        b) installing protective fencing around the dripline
                                                            of the vegetation; and
                                                        c) ensuring stock piling, storage and vehicle
                                                            parking occur outside the identified vegetation
                                                            areas;
                                                        S15.4
                                                        Low impact construction techniques are used
                                                        around vegetation to minimise interference with
                                                        the vegetation.
                                                                                                                        Volume II: Code Responses

                                                                                                                        Viridian Noosa Project
                                                                                                                        Viridian Stage 3

Biodiversity Overlay Code                                                                                               11 April 2006     Page 17

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.