COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
Filling and excavation
O16 S16.1 Complies with specific outcome.
Vegetation is not adversely impacted upon by No solution provided. No filling or excavation is within the riparian
earthworks and changes to the hydrological regime, buffer identified in the CAS.
including changes to ground water levels, flooding
levels, run-off and tidal hydraulics.
Fences along watercourses
O17 S17.1 Not applicable.
Fences along watercourses are designed and Fencing along watercourses are of open No fences are proposed.
constructed to maintain the visual amenity of the construction (ie. more than 50% transparent) and
watercourses and blend with the natural use lightweight materials, such as timber or steel
environment. wire.
Vegetation management
Replanting and rehabilitation
O18 S18.1 Complies with specific outcome.
Vegetation is enhanced through the following Landscaping complements important habitats by Vegetation is enhanced through the following
measures: a) utilising native plants of local origin; measures:
a) siting landscaped areas to complement and b) utilising suitable plant species identified in a) proposed planting is selected from plant lists
enhance existing vegetation; PSP3 Landscaping Plants and Guidelines; included in Landscape Report which have been
b) removal of all species likely to displace native c) replicating adjacent remnant habitats, including previously agreed with Council in association
flora species or degrade fauna habitat; understorey vegetation; with the CAS and include plants of local origin
c) replanting and rehabilitating13 degraded d) creating or enhancing linkages between from either the subject site or the National
habitat; and existing habitats; Park adjacent.
d) replacing any vegetation removed with suitable e) avoiding the use of Undesirable Plant Species b) siting landscaped areas to complement and
replacement vegetation of local origin. listed in Table 9.1 of PSP3 Landscaping Plants enhance existing vegetation through replication
and Guidelines; and of adjacent habitats;
f) planting riparian zones to filter stormwater run- c) removal of all species likely to displace native
off and provide for wildlife habitat. flora species or degrade fauna habitat;
AND d) replanting and rehabilitating degraded habitat.
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Biodiversity Overlay Code 11 April 2006 Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.