                  COLUMN 1                                      COLUMN 2                                               ASSESSMENT
             SPECIFIC OUTCOMES                ACCEPTABLE SOLUTIONS (if self-assessable)
                                               PROBABLE SOLUTIONS (if code assessable)
                                             S3.2                                                     development avoids the possible landslip and the
                                             Where the filling is for residential commercial or       sand dune areas adjacent to the Viridian Stage 3
                                             industrial purposes the works comply with                site.
                                             Sections 3 to 6 of AS3798 - Guidelines for
                                             earthworks on commercial & residential                   The works will comply with Sections 3-6 of AS
                                             development.                                             3798 Guidelines For Earthworks On
                                                                                                      Commercial and Residential Development.
Local amenity
O4                                           S4.1                                                     Complies with probable solution.
Earthworks do not cause disturbance to the   The following control measures are                       Development proposal complies with prescribed
amenity of the neighbouring land.            implemented                                              solution. The main access road within the site,
                                             a) regular water spraying of exposed areas to            Alma Way, is sealed. The site of the works is well
                                                 suppress dust;                                       away from other properties with more than 70m
                                             b) provision of dust stabilised or sealed internal       clearance to all neighbours except Stage 2 of the
                                                roads;                                                Viridian development.
                                             c) protective covering of exposed areas that are
                                                left for more than 2 weeks; and                       The contractor will be required to:
                                             d) if there is no valid development permit for the           suppress dust by watering and stabilising
                                                site, disturbed areas are revegetated using species       disturbed areas;
                                                identified in PSP3 Landscaping Plants and                 remove waste by licensed contractors;
                                                Guidelines.                                               undertake works within the prescribed hours
                                             AND                                                          of work.

                                             S4.2
                                             Earthworks are undertaken only during the hours
                                             of 7am to 6pm, Monday to Friday and 7am to 6pm
                                             on Saturday. No work is undertaken on Sunday or
                                             public holidays.




                                                                                                                                       Volume II: Code Responses

                                                                                                                                       Viridian Noosa Project
                                                                                                                                       Viridian Stage 3

Earthworks Code                                                                                                                        11 April 2006     Page 29

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.