Volume 2 - Code Responses · 132006.823

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                   COLUMN 1                                               COLUMN 2                                               ASSESSMENT
             SPECIFIC OUTCOMES                         ACCEPTABLE SOLUTIONS (if self-assessable)
                                                        PROBABLE SOLUTIONS (if code assessable)
Vegetative Waste
O5                                                    S5.1                                                     Complies with probable solution.
Vegetation cleared from a development site is         Cleared vegetation is transported offsite for disposal   Cleared vegetation is to be mulched on-site and
disposed of in an environmentally responsible         in an approved green waste disposal facility;            reused for landscaping of the finished
manner.                                               OR                                                       development.
                                                      S5.2
                                                      Cleared vegetation is mulched on-site and reused for
                                                      landscaping of the finished development;
                                                      OR
                                                      S5.3
                                                      Cleared vegetation is disposed of for the purpose of
                                                      firewood.
Managing contamination risk
O6                                                    S6.1                                                     Complies with specific outcome.
Materials used as fill are suitable for development   The fill material is solid clean earth, free of          Development proposal complies with prescribed
of the land and filling or excavation works do not    putrescible or refuse material, vegetation, acid         solution. Any fill material will be solid clean earth,
result in the contamination of land.                  sulfate soils, building or construction material or      free of putrescible or refuse material, vegetation,
                                                      other material or contaminants;                          acid sulfate soils, building or construction material
                                                      AND                                                      or contaminants.

                                                      S6.2                                                     The site is on the Environmental Management
                                                      The site is not on the contaminated land register.       register but as part of the clean up process,
                                                                                                               identified arsenic impacted soil, within areas of the
                                                                                                               original site, were removed and transferred to an
                                                                                                               on-site engineered containment cell located within
                                                                                                               the resort site (Stage 3 Viridian). Records provided
                                                                                                               to Golder Associates Pty Ltd indicate that
                                                                                                               approximately 6,000 m³ of material was transferred
                                                                                                               to the cell. A protective plastic marker geotextile,
                                                                                                               comprising orange fortacon 200 micron, was laid
                                                                                                                                                  Volume II: Code Responses

                                                                                                                                                  Viridian Noosa Project
                                                                                                                                                  Viridian Stage 3

Earthworks Code                                                                                                                                   11 April 2006     Page 30

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.