                  COLUMN 1                                           COLUMN 2                                      ASSESSMENT
             SPECIFIC OUTCOMES                       ACCEPTABLE SOLUTIONS (if self-assessable)
                                                      PROBABLE SOLUTIONS (if code assessable)
                                                                                                 over the infilled cell. The marker was subsequently
                                                                                                 overlaid with a minimum of 500 mm of clean
                                                                                                 compacted fill capping layer.
                                                                                                 Part of the proposed Stage 3 Viridian development
                                                                                                 includes construction work in the area where the
                                                                                                 cell is currently located. Options, including
                                                                                                 transferring the cell to another portion of the site,
                                                                                                 have been considered. However, it is proposed to
                                                                                                 remove all material contained in the cell to an off-
                                                                                                 site waste containment facility. All works will be
                                                                                                 undertaken in accordance with the authority from
                                                                                                 the EPA. The removal will be undertaken in
                                                                                                 advance of building construction.
Haulage activity and amenity
O7                                                  S7.1                                         Complies with specific outcome.
Haulage of material to and from a site ensures      No solution provided.                        Cut to fill earthworks are being designed for the
a) minimal disturbance to neighbouring properties                                                development. An earthworks balance is possible
   and properties along the haulage route; and                                                   and levels are being established to achieve this. If a
b) Council s road infrastructure including                                                       balance cannot be achieved fill material will need
   pavements is not adversely affected.                                                          to be imported to the site with a maximum
                                                                                                 quantity of 5,000m3 being a realistic upper limit.
                                                                                                 The contaminated material currently stored in a
                                                                                                 containment cell will need to be removed from the
                                                                                                 site. Careful consideration will be given to the
                                                                                                 removal process such that access to and from
                                                                                                 Viewland Drive creates the least possible
                                                                                                 disturbance.

                                                                                                 The contractor will be limited in the number of
                                                                                                 heavy vehicles accessing Viewland Drive per day
                                                                                                                                    Volume II: Code Responses

                                                                                                                                    Viridian Noosa Project
                                                                                                                                    Viridian Stage 3

Earthworks Code                                                                                                                     11 April 2006     Page 31

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.