7.0 EROSION AND SEDIMENT CONTROL CODE
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
Effects of works
Erosion and sediment control
O1 S1.1 Complies with probable solutions.
Development minimises erosion and transport of Site disturbance is limited to building areas, their Development proposal complies with prescribed
sediments off-site. surrounds and other use areas; solution. The key to the erosion protection
AND strategy is the construction of cut-off drains
within the property, upstream of the development
S1.2 site, prior to the commencement of earthworks.
Sediment barriers are provided throughout and This will divert clean run-off from upstream areas
downslope of disturbed areas to prevent sediment of the site away from the areas disturbed by
washing into gutters, drains and watercourses either on earthworks. While this was previously specified
or off the site; for the Stages 1 and 2 works, the Contractor
AND adopted alternative work practices, which did not
adequately protect the work site from through
S1.3 run-off. The developer is now implementing
All stockpiles including sand, soil or building measures for erosion and sediment controls
materials are within the premises and contained including grassed and rock swales. This work is
within individual sediment barriers; being undertaken in advance of development.
AND
A comprehensive Erosion and Sediment control
S1.4 Management Plan was developed and adopted as
Sediment basins are provided where the site part of the existing Development Approval for
contains fine or dispersive soils; the site. Whilst the building types for the new
OR development proposal have been altered, the
location and area of disturbance on the site is very
S1.5 similar. The strategies developed and water
A stormwater catchpit incorporating a stormwater quality objectives in the management plan
catchpit protection device is installed so that all run- adopted as part of the existing development
off from disturbed areas flows to the catchpit; approval still apply. (Refer Bayview Noosa Hydrology
AND and Stormwater Management Plan prepared by WBM
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Erosion and Sediment Control Code 11 April 2006 Page 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.