Council archive · source document
Volume 2 - Code Responses · 132006.823
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
S1.6 Oceanics Australia). The management plan which
For buildings, is in accordance with existing best management
a) temporary or permanent downpipes are practices proposes a combination of:
connected to the stormwater system before early stabilisation of disturbed areas including
laying the roof; or hydromulching of general earthworks areas
b) localised erosion is avoided by directing flow and Sir Walter turfing and rock lined channels
from downpipes over non-erosive areas. along road and platform edges.
cut off drains to divert clean run-off away
from the disturbed areas.
early construction of underground drainage
including provision of GPT on all drains
prior to outlet.
construction of vegetated swales and
vegetated buffer strips to trap sediments prior
to discharge from the site.
protection in the form of silt fences and
dumped rock around all drainage inlets and
across drainage paths.
revegetation of the overall Viridian site to
reduce erosion from cleared steep land above
the proposed development site.
Compliance with the previously approved
Management Plan will protect downstream
properties and waterways from sediment
deposition.
Development proposal complies with the
prescribed solution. Sediment barriers identified
in S1.6 will be used to slow and spread the flow
from downpipes to avoid localised erosion.
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Erosion and Sediment Control Code 11 April 2006 Page 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.