Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

MCU10/2083 Development Application part 2 - Attachment 4 - Economic Impact and Need Assessment

of 54

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

18.

19.

20.

21.

Make Good:

Lessor Works:

Lessee Works:

Signage:

As per standard lease conditions.

The Lessor will provide the base building tenancy as
set out in the following documents provided to the
Lessee:

The Lessor will provide the base building tenancy as
set out in the following documents provided to the
Lessee:

e Internal Lighting to NightOwl Specs

e Tiled Flooring to NightOwl Specs

e Install Automatic Biparting auto doors to
NightOwl specs
Tiled Grid Ceiling
Power: 100amp, 3 phase, 36 pole
distribution.

« Min 3 x external mercury vapour floodlights
on awning above tenancy lighting forecourt of
shop and immediate adjacent carparks

« 4x 10min express car bays
Under-slap drainage:

o Cold 20mm water outlet with
stopcock enter the tenancy up
through slab with valve remote read
meter.

o Capped sanitary drain (100mm)
connection outlet at floor level toward
the rear of the tenancy.

o Capped trade waste (100mm)
connection outlet at floor level toward
the rear of the tenancy.

Any Lessee fit-out works to be approved by the
Lessor before any works can commence. The Lessee
will forward indicative plans and a copy of the
Development Application for the Lessor’s review and
consent, such consent cannot be unreasonably
withheld.

The Lessor must either consent or refuse consent
within ten (10) business days of receipt of the
Lessee’s written request for consent. If the Lessor
refuses consent it must provide in writing the reasons
for such refusal.

The Lessee will be entitled to erect its signage on the
fabric of the tenancy, subject to Lessor consent
(which is not to be unreasonably withheld) and local
authority planning approval.

Requirements: 1 x Top Position Illuminated Pylon
Sign, 1 x Under Awning Illuminated Sign, 1 x Fascia
Illuminated Awning Sign, & 2 x NightOwl External
Promotional Lightboards to the shop-front.
Log in to download the original file

MCU10_2083 Development Application part 2 - Attachment 4 - Economic Impact and Need Assessment.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.