Ga fy C2 oo mn eo Our Ref: K1595-0012 Your Ref: 17 June 2009 Sunshine Coast Regional Council PO Box 141 TEWANTIN QLD 4565 Dear Sir/Madam RE: PROPOSED DUPLEX - OPERATIONAL WORKS APPLICATION, 5] ELANDA STREET, SUNSHINE BEACH Please find enclosed three (3) copies of A3 RPEQ certified plans for the Engineering works and three (3) copies of Stormwater Management Plan for the subject development for which we seek approval. The application seeks approval for Roadworks and footpath, stormwater drainage connection and sediment and erosion control. The submission has been compiled to address all relevant conditions of the approval relating to engineering matters. ~ Sn . Also enclosed is a cheque for $1,403 (see attached email for confirmation of fees) and IDAS application forms Part A, Part E and Assessment Checklist. A response to each condition of the Material Change of Use approval dated 24 March 2009 Is provided below. CONDITION RESPONSE , 1-12 The submitted engineering drawings are in accordance with the approved plans. 13 Not Applicable 14-18 | Shown on the submitted drawing ROO]. _. -= ~ 19-20 Not Applicable a ee 22-23 Footpath is shown on drawing ROOT 24° || Road widening works are. shown on drawing R001. Internal stormwater drainage and rainwater tanks have been shown on the drawing SWO001 along with the connection to Council's system at the rear of the property. A Stormwater Management Plan has been 25-27 produced which looks at pre and post development flows and -demonstrates a detention basin is not required. Any overland flow that was able to enter the site will operate under the same flow regime in the post developed scenario. The existing sewer main has been picked up by survey with location 29-30 and zone of influence shown on drawings ROO] and RQO2. The building and footings are located outside of the zone of influence. 31-34 Not applicable. The proposed sewer easement (being equivalent to the zone of 35-36 influence width) is shown on drawing ROO] and will be included on future easement documents prepared by the surveyor. Earthworks are only proposed in the vicinity of the building construction. Tne building has been designed in consideration of the natural 37 topography by suspended slab construction and ‘stepping’ of the building into the hillside, There will be no impact to the flow regime of stormwater and no additional ponding above that currently experienced. 39-40 Erosion and Sediment Control is detailed in drawing SECO). Knobel Consulting Pty Ltd Knobel Consulting Pty Ltd Office: Suite 6 109 West Burleigh Road Burleigh Heads Qld 4220 Correspondence: PO Box 3892 Burleigh Town Centre Burleigh Heads Qid 4220 ABN 74 375 283 428 T 07 5576 4168 F 07 5576 6477 E [email protected] ENGINEERS PROJECT MANAGERS PROJECT FEASIBILITY CIVIL WORKS COUNCIL NEGOTIATION STORMWATER HYDRAULIC ANALYSIS WATER SUPPLY SEWERAGE pOPEGIALIGONSG 10 CITIL GNGINEERING SGAIIGES ONO PROJECT MANAGEMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 85 pages
Page 2
Knobel Consulting Pty Lid 17 June 2009 Page 2 of 2 4l Contributions fo be paid by developer. 42-44 To be monitored and controlled as part of construction supervision. 45 To be provided separately. ’ 46-47 Not applicable If you have any queries please do not hesitate to contact us. Yours faithfully TRENT PURDON - Knobel Consulting Pty Ltd Copy - Neil Stebbing Attachment - 3 x Knobel Consulting Pty Ltd, Engineering Drawings (REPQ) 3 x Knobel Consulting Pty Ltd, Stormwater Management Plan (Ref: K1595-0006) IDAS forms Parts A, E and Assessment Checklist Nationat Australia Bank - Payment cheque for submission - $1,403.00. K1595-0012
Page 3
mm eS SE Mm Oe em Oe Ul mlUlellUlmelhlcmlhlm em le lee Pa — Trent - Knobel Consulting From: Annie Evans [[email protected]] Sent: Friday, 29 May 2009 10:18 AM To: Trent - Knobel Consulting Subject: RE: K1595-0008 Fees for Operational Works Application Hi Trent Further to our conversations yesterday and based on the drawing provided, the fees for Operational Works will be as follows: 3.2.2 Duplex Development Permit 422.00 3.2.3 Plan Exam 364.00 3.4 S & E control 121.00 4.1.2 Inspections 496.00 (4 inspections) If additional inspections are required they will be charged at $122.00 each) TOTAL $1403.00 Regards Annie 5449 526 From: Trent - Knobel Consulting [mailto:[email protected]] Sent: Thursday, 28 May 2009 3:32 PM To: Annie Evans Subject: FW: K1595-0008 Fees for Operational Works Application Annie a Please see attached preliminary drawing to assess necessary fees for the application. There will be other drawings in the set that are not yet finished. | think the best guide to go off is the Development Approval. We are providing a response and plans to all conditions that request an operational works application (engineering items only) Please contact me with any further queries. Regards TRENT PURDON Project Engineer KNOBEL CONSULTING PTY LTD ENGINEERS - PROJECT MANAGERS ABN: 33 071 435 202 PO Box 3892 Burleigh Town Centre Burleigh Heads QLD 4220 11/06/2009
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Form 1 Development Application
—
Part A
Common details
NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the f form for advice on how to complete this form.
Appli icant “detai Is (The Applicant is the person responsible for making the application and need rat be the owner of the. land, The Applicant i is responsible for ensuring the
information provided on the IDAS Application Form is correct. . This information is relied upon by the Assessment Manager and any referral agencies when assessing and “" ~
, deciding this application. By lodging this application, the Applicant incurs the obligations and responsibilities prescribed by the IPA. Any development permit or pretiminary
approval that may be issued as a consequence of this application will be issued to the Applicant)
Company or organisation name (/ applicable) Ss 7aE FAC WEY Myre Sf AO: Sel. COMSUIL TITS
(ndividual applicantContact person (if there is mare than one applicant, provide additional applicant details on an attachment to this form) ri <
Title Firstname | 7 AEAT Last SaIreDon’
hame
Postdodiress | HO. Ao 3802 Kreceran Tan compe, (2 %220
Contact telephone number S3% G16F Mobile phone number|
Facsimile number S876 6477 e-mail address 2114 Oknobe leon sett: lor .atn
Details of the premises (ie. the and on which the development is proposed - ~ refer tothe advice atthe end of the “ed
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then goto a2
Name of each local goverment area in which the mobile and temporary ERA is proposed to operate
1.
OR
Table 8 Street address for the premises { ~ applicable hox/es below and insert property description in the table. Identify each lot in a separate row.)
() [2 Street address / {ot on plan for the premises (Appropriate for most applications including building applications); Of
(i) [2 Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate far development in water eg. jetty, pontoon
etc) (Note: Lot on plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government}
Street address Lot on plan description Local govemment area (eg
Uni | Steet ‘Street Name and official suburbfocaliy name Pest Vorwo,| Plan ope and Logan, Caims)
1. S/ | Eta OF} SteEET YOR IRPEG HQ | SUARIAE
SUNSHINE BeErdce CoMST~
AND/OR
Table C Coordinates and/or a map of the premises (4gpramiste for development in remote areas, over part of a lol. in water (e.g. channel dredging in Mareton Bay) etc.)
Coordinates
(Nate: place each set of coordinates in a separate row) Rene Datum ee een area
Easting Northing Latitude Longitude
1. (CD cpass [] wese4
(1 Other
Page 4
Page 5
INTEGRATED PLANNING ACT 1997 . Part A, Version 3.1, 3 March 2008
2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises wil not involve any of the
following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
Name of water body, watercourse or aquifer (if known}
1.
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on plan description for strategic port land Port authority for the lot
Table F Complete if the premises are in tidal water
Name of local government for the tidal area (// applicable) Name of port authority for the tidal area (/Fapplicable)
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
Total area of premises (land on which the development is proposed)
° 7 5 S |r hectares (v ‘applicable uni)
Existing use of the premises @
4. Current use/s of the premises: (eg. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
HOUSE
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water etc.)
No oO Yes - Fnsure the type, location and dimensions of each easement are included in plans, submitted with the application
Proposal details
6. Brief description of the proposal: (e.g. 6 unit apartment building, 30 fot residential subdivision, a bore, aquaculture etc.)
Durecex
7. Does the proposal include new building work or operational work (inctuding any services}on the premises?
oO No haves ~ Ensure the nature, focation and dimensions of the proposed works are included in plans, submitted with the application
Resource entitlement (applicable) - further information is provided in the advice section at the end of the form
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
10 - Goto Q9 D1 Yes - Complete Table G - provide details for each evidence requited on a separate row, if applicable Evidence of resource allocation or
entitiement must be submitted with the application. You do not need to answer Q9 - go to the next section.
Nature of State-owned resource _®@
Table G {Nature of evidence required
Allocation/entitlement
reference number
State Government Date of | Date of
Name of authorising officer Position of authorising officer Department issue | expiry
Owner's consent (ifapplicable) ~ further information is provided in the advice section at the end of the form
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and not
within a canal as defined under the Coastal Protection and Management Act 1995, ot work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for cach ovmer on a separate row, of on an attachinent to this form if appicable.
Table H Premises Owner's name/s Details of the premises owned Owners signature* Date consent
and postal address (street address ar tot an plan description} "9 was obtained
‘ SEE 4ATTACHED
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 af the Corporations Act 2007 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA websile .
Page 2
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Attachments and supporting information (Complete Table 1 ~ Use a separate sow for each type of. attachment 0 or inforination, including information required under
this Part) Please ensure all: documentation submitted with this form, including other Parts of Farm 1, or wner’s consent, etc, are securely attached to this Part of the Form.
ft : i
Table | (eg. Pate ora msc ee rie (eg. cman eS Trafic Report) Date seccement eget
1 (ARTE, OVERS LV AIL
CONSERT, SOR PW ATR
DAME GT LAN
‘Portable Long Service Leave (PLSL) levy Applicable for centain building and construction work valued over $80,000 only ad
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (+ box if applicable)
L the application seeks a preliminary approval only;
LD the application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave)
Act 1997, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for farming purposes:
fand clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or
controlling weeds or pests);
Ai costs, that relate to the work both directly and indirectly, are less than $80,009, inclusive of GST; or
(J the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Paymient Form {no payment required if owner-builder permit manber stated). The receipted forn must be sighted by the
assessment manager belore a development petrnit can be given.
11. Is payment of a PLSL levy applicable to this application? (Refer to Q70 and the Advice below for more information)
RING cn of Part A (Yes - Answer 012 below
12. Has the PLSL levy been paid?
Oo No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the
Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit @ Notification
and Payment Form to QLeave.)
oO Yes - Complete Table L and submit, with the application, the ‘yellow* (Local Government's (Council) / Private Centifier's) copy of the receipted Qt eave Form.
i i QLeave Project Number
Table L Amount paid Date paid (6 digis, string with A, B, E, Lor P)
OFFICE USE ONLY (For use by the Assessment Manager / Private Centifier) (Optional)
. Receiving Reference
Fee ($) Date received officer's name numbers
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER
To: Council. | have been engaged as the private cerlifier for the building work referred to in this application.
Date of engagement Name BSA Certification license number Building classification’s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Amount paid Date receipted form
Description of the work QLeave Project Number 6) Date paid sighted by Name of officer who sighted the form
assessment manager
Privacy Statement
The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992} ar
as required by Parliament. This information may be stored in a DIP database. The information collected will be retained as requited by the Public Records Act 2002.
Page 3
Page 7
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Advice for completing Part A (For more delaited advice, refer to IDAS Guide 1 (Making and IDAS application)
General advice
Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible for
answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger
may refuse to receive an application that is not properly made.
+ The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act
1975 only, i.e. those applications requiring the completion of Parts A and 8 only.
Applicant details
¢ Ifthe applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided under the IPA.
Details of the premises
« The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is
situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
« Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete Table A.
« The premises may be identified in a number of ways—
+ Street address and fot on plan are most common and will apply to most applications.
+ Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the premises
the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as
Zone Reference or GS84 may be provided.
The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.
Strategic Port Land is within a local gavemment area but a local government's planning scheme does not apply on Strategic Port Land. Strategic Port
Land is declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port fand) and the
Queensland Transport (Ports) website.
« ‘Tidal water’ is defined in the Coastal Protection and Management Act 7995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is
defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides)
establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless provided for under the Local Government
Act 7993. Unless otherwise provided for by legistation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is
within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local goverment tidal area.
However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the local government tidal area,
and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
¢ Section 3.2,1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State
resource. Schedule 10 of the /ntegrated Planning Regulation 1998 (\PR) prescribes the State resources, including State-owned land, where evidence is
required to be given, and the evidence required to support the application. Link to Integrated Planning Requiation. Section 3.2.1(10)(a)(ii) states an
application cannot be taken to be properly made without the required evidence.
For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the
request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
¢ For State-controtled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette
Notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
+ Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for
quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark.
Owner’s consent
* Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the tand owners, if the application
involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal
Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994.
+ Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the @
processes of the application or in the event of an appeal about the outcome of the application.
* ‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent
for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
« Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation may be used
for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
« Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary ERA.
Portable Long Service Leave (PLSL) Levy
« The Building and Construction Industry Portable Long Service Leave Scheme provides long service {eave entitlements to workers in the building and
construction industry who would be unlikely to accrue enough service with one employer to qualify for tong service leave. To fund the scheme, a Portable
Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out in Queensland.
« The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable
Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and
Construction industry Training Levy.
« The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act} defines the building and construction work subject to the
PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines,
fences or earthworks, and works for subdividing, irrigating or draining land.
* The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued.
« The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be
completed on the QLeave website at www.qleave.ald.qov.au. For further information contact QLeave (Tel: 1800 803 481 Web: www.gleave.ald.gov.au )
Page 4
Page 8
Knobel Consulting Ply Ltd
KNOBEL CONSULTING PTY LTD
ENGINEERS - PROJECT MANAGERS
ABN: 74 375 283 428
* PO Box 3892
Burleigh Town Centre
Burleigh Heads QLD 4220
Telephone No: (07) 5576 4168
Facsimile No: (07) 5576 6477
Email: [email protected]
LAND OWNER/S CONSENT
mer aol | Proposed Duplex PROJECT |
i enqeume 51 Elanda Street re
EPTIESE Sunshine Beach .
L, Stephen Locke Mans , as owner/s of the property described as
( Chanteny Too Phy Lted- Dikectoe
51 Elanda Street Sunshine Beach ,
Lot 403 RP48112
Hereby, give consent for KNOBEL CONSULTING PTY LTD, to lodge all applications
associated with the property on my/our behalf.
2 Oe
Signature: Gf — : Daie. “| + ?
\——4
K1595-0009 1 June 2009 Page | of |
Page 9
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
Part E
Building &/or operational work assessable against a planning scheme!
: on, - » .
_ Nature of the works lye a . - wae .
1. Nature of work that requires assessment againsLa planning scheme:
(1 Building work - Complete Table A Operational work - Complete Table B
Table A
(i) What is the nature of the building work made assessable in the planning scheme?
(ii) Are there any current approvals associated with this application? (e.g. materia change of use}
CINo (1 Yes - Provide devaits below
List of approval reference/s Date approved Date approval lapses (if known)
[ 4.
Table B
(i) Whatis the nature of the operational work made assessable in the planning scheme?
Ur Rosdworks [stormwater (Water infrastructure [_] Clearing vegetation under the planning scheme
(1 Drainage works ~~] Earthworks CL Sewerage infrastructure
C1 Landscaping D1 Signage (Cther - Specly S€QnE YF SOW C ra
(iii) What type of approval is being sought? (O76: / you have indicated muttipie operational works in question @) above and your answers to this question
would be different for different operational work, it may be more appropiate to provide these details in an attachment to this form)
[EX bevelopment Permit (1 Preliminary Approval C1 Both ¢specity below)
(iv) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision/?
we D1 Yes - Specify the number of lots being created
(v) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a toy
CINo Yes - Complete Table Bfa)
Table B(a} List of approval references . Date approved Date approval lapses (if known)
1. | SUARIAE CAT REG. COATT
2008F/IFEF 2y/ 3/09
2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) $ 10,000
fe 2
Mandatory information ‘
* -
3. Confirm the following mandatory information accompanies this application
Confirmation of lodgement] Method of lodgement
Plans, and specifications if applicable, showing the nature and location of the proposed works ficuuting he
lextent of any cut and fi) 1 Confirmed
OFFICE USE ONLY
Date received Reference numbers.
Advice for completing Part E
General advice
. Part A must also be completed for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly ta another question.
a1 I A development peril authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development lo occur.
1 This form is also used for building or operational work assessable against the land use plan for Caims airport land or Mackay airport land. Wherever
planning scheme is mentioned, take it to mean the land use plan for the airport land.
Page 1
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 IDAS Assessment Checklist IDAS Development ‘Application Form ti is the approved form for all development applications under the Integrated Planning Act 19971PA). Form 1 i is made up of various Parts. Part A (Common: details): of Form 1 must-be completed for all applications. The relevan of other Parts of Form 1 depends on the nature of the application. Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and ss ... feferral fequirements, and the Parts of Form 1 relevant to the application. Section 1 and all other relevant sections of the IDAS ‘Assessivent Checklist, as identified i in the Table below, must be completed for all development applications except those proposed on land in an urban development area, or for ~ building work requiring assessment against the Building Act 1975 only. |. For more advice about bui “For more information’ about development applications on land i in an urban an development area,’ Tefer to i . www.ulda.qid.qov.au. . ing applications refer to Part B of the IDAS Application Form. Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If unsure, phone or visit your local government or log onto the DIP website www.dip.qid.gov.au for help For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this application? 4 yes - complete Section 6 of this checklist. checklist Does the application seek approval to make a material change of use of the premises? O Yes | FTNo ifyes - complete Section 2 of this checklist. Does the application seek approval to reconfigure a lot? LD Yes | [tio i yes - complete Section 3 of this checklist and Part F of DAS Application Form 1, ff the premises are completely within a single local government area assessment is by the local government. Does the application seek approval to carry out operational work? [Ves CINo i yes - complete Section 4 of this checklist. Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? C1 Yes PINo H yes - complete Section 5 of this checklist. Have you received a referral agency response under seclion 3.3.2.0f the IPA, in relation to this development Yes [BNo Does the application seek approval to carry out building work requiring assessment against a local government planning scheme? if yes - complete Form 1 Part E of IDAS Application Form 1. Assessment is by the local government. OD Yes ZINo (Restructuring and Disposal) Act 2008? i yes -Assessment is by the Department of Infrastructure and Planning. Complete Form 7 Part D of IDAS Application Form 1 if the application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the local government as Advice Agency. Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? (Yes Ano ityes - 90 10 Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 7. Assessment is by a building certifier. Do you wish the application to be assessed against a superseded planning scheme? (Yes [YNo if yes - complete Form 7 Attachinent 7. Is the application for development completely or partly on Cairns or Mackay airport land under the Airport Assets Yes PINo Page 1
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
S E CTI O N 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
HERITAGE
1.1A ||s any part of the proposal intended to be carried out on a Queensland heritage place under the Queenstand Heritage Act 1992?
0- Gowari [Yes
Ifyes, has an exemption certificate for the proposal'-' been issued under the Queensland Heritage Act 1992?
(Yes (INo
Ifno, is the proposed work liturgical development under Queensland Heritage Act 1992, section 78?
OyYes (No
if no, is the work being carried out by the State?
If EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 5, item 2, IP Regulation, schedule 2, table 2. item 18
Yes oO No - (Complete Form 1, Part C1) This application requires assessment by the Environmental Protection Agency (EPA).
1.1B | Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of the
Queensiand Heritage Act 1992, other than if place is on Cairns or Mackay airport land?
Oto. Goto Q1.2 D Yes
If yes, does the following apply?
(i) development for public housing, as defined by the /ntegrated Planning Act 1997(IPA), chapter5, []No (1 Yes
part 6
(ii) development carried out by the state on land designated for community infrastructure under the ONo (Yes
IPA, chapter 2, part 6
{iii} development that is exempt from assessment against a planning scheme under the IPA, schedule C]No (] Yes
If no to all of (i) - (ii) above - (Complete Form 1, Part C2) This application requires assessment by the relevant local governmemt as Concurrence
Agency.
IPA, schedule 8 part 1, table 5, item 2A, IP Regulation, schedule 1, patt 2, table 5, item 2: Airport Assets (Restructuring and Disposal) Act 2008, s 54.
REMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2 pan the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No- Gotogr3 [1 Yes
if yes, is an allocation notice required under the Water Act 2000?
No 0 Yes
If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(Compiete Form 1, Part K;). If NRW is not the Assessmem Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005.
IPA, schedule 8, part 1, table 5, item 1, 1P Regulation. schedule 2. table 2, tem 11:1P Regulation, schedule 1, tate 5, item 2 (wild river area): Water Act 2000, section 966C; Wild Rivers Act
2005, section 43A.
No - (Complete Form 1, Part K) This application requires assessment by the Departinent of Natural Resources and Water (NRW). if NRW is not
oO Yes - Unless the application is consistent with ‘any property development plan applying to the land, the Assessment Manager must refuse to receive it.
e
‘+ In this IDAS Assessment Checklist, the term proposal sefers to the proposed use, work os lot reconfiguralion the subject of the application.
Page 2
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA _
13
Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gowai4 L1Yes
If yes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
CINo
If no, is there a code of environmental compliance under the Environmental Protection Regulation 2008 for every aspect of each
proposed ERA?
oO No - (Complete Form 1, Part G) This application requires assessment by the Administering Authority. i the Adiministering Authority is not the
Assessment Manager lor the application, the agency has jurisdiction as Concurrence Agency. Go to Q1.4
(1 Yes - Gor a1.4
O Yes
If yes, is any extraction ERA intended to be located in waters?
U1 Yes
If yes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental
Protection Act 1994, section 73AA(9)?
o Yes - Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by an
allocation notice, the Assessmem Manager must refuse to receive it. (Complete Form 1, Part G). This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994 and, subject to the declaration for the relevant wild river area,
the Wild Rivers Act 2005. If the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
4 No ~ An application for the ERA will be taken to be not properly made and the Assessment Manager must refuse to receive it.
CNo
If no, is any part of any ERA intended to be located in a high preservation area?
0 Yes
If yes, is each proposed ERA one of the following?
(i) asewage ERA Ld No| (1 Yes
(ii) a water treatment ERA CINo| (1 Yes
(iii) a dredging ERA _ ()No| D1 Yes
{iv) an extraction ERA carried out outside waters and the activity is a borrow pit of not ONo/L Yes
more than 10,000m: for -
* — specified works under the Wild Rivers Act 2005; or
| residential complexes, as defined under the Environmental Protection Act 1994
(v) “a screening ERA carried out outside waters and the activity is for - (CNo|L Yes
« specified works under the Wild Rivers Act 2005, or
+ _ forresidential complexes, as defined under the Environmental Protection Act 1994
(vi) a crude oil or petroleum product storage ERA and the activity is - (no|T Yes
« for residential complexes, as defined under the Environmental Protection Act 1994, &
« carried out outside a designated urban area, as defined under the Wild Rivers Act
2005
(vii) An exempt environmentally relevant activity, as defined under Environmental Protection \(C)No|(_] Yes
Act 1994, in a designated urban area, as defined under the Wild Rivers Act 2005
If yes to any one of (i) - (vii) above - Unless the application is consistem with any property development plan applying to the land, and
the application is accompanied by an allocation notice, the Assessment Manager must refuse to receive x. (Complete Form 1, Part G). This
application requires assessment by the Administering Authority for the purposes of the Environmental Protection Act 1994. ifthe
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Cancurrence Agency. Subject to
any limitations in the declaration for the wild river area and the Wild Rivers code, assessment is also required for the purposes of the Wild
Rivers Act 2005. In paiticiilar, a sewage ERA, a water treatinent ERA and an ‘exempt environmentally relevant activity’ do not require
assessment for the purposes of the Wild Rivers Act 2005 if the ERA is proposed in a designated urban atea.
If no to all of (i) - (vii) above - An application for the ERA/s will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
oO No - Answer the following question on the next page
Page 3
Page 13
INTEGRATED PLANNING ACT 1997 iDAS Assessment Checklist, Version 22
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA (continued)
lfno, is any ERA an extraction ERA intended to be located outside waters?
No — Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by
an allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires
assessment by the Administering Authority for the purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act
2005. if the Administering Authoniy is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
D1 Yes
[C1No|Q Yes |
More than 10,000m3 for - ‘
¢ — Specifted works under the Wild Rivers Act 20085, or 4
* residential complexes, as defined under the Environmental Protection Act 1994
|) No|L1 ves |
| (ii) the activity is located outside a flood management area
If yes to either (i) or {ii} above - Uniess the application is consistent with any property development plan applying to the land, and
the application is accompanied by an allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1,
Part G). This application requires assessment by the Administering Authority for the purposes of both the Environmental
Protection Act 1994 and, subject to the declaration for the relevant wild river area, the Wild Rivers Act 2005. If the Administering
Authority is not the Assessment Managet for the application, the agency has jurisdiction as Concurrence Agency.
If no to both (i) and (ii) above - An application for the ERA will be taken to be not properly made and the Assessmem manager |
refuse to receive it.
IPA, schedule 8. part 1, table 2, item 1, IPA, schedule 8 part 1, table 5, tems 2 and 4; iP Regulation, schedule 2, table 2, items 1 and 23: Enviconmemal Protection Act 1994. section 73AA (wild
fives area): Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivess Code.
WITHIN THE LIMITS OF A PORT
14
's any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
jo- Gowoar.s [_] Yes
Hf yes, is that part of the premises below high water mark?
LI No
L1 Yes - ifanswers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8 — Answer (a) to (c) below. This application tequires assessment by the Port Authority for the land. if you answer no to (a), (b) and
(¢) below, the Port Authority for the Port has jurisdiction as Advice Agency.
(a} Is any part of the proposal within 200m of a shipping channel or an entry and exit shipping corridor for the Port?
No (1 Yes - the Post Authority for the Port has jurisdiction as Concurrence Agency.
{b) Is any part of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage or spoil grounds?
LINo C1 Yes - the Port Authority for the Port has jurisdiction as Concurrence Agency.
(c) Is any part of the proposal within 1,000m of a planned port facility identified in a land use plan?
oO No oO Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
JP Reguiation, schedule 2, table 2. tems 15 and 16
DECLARED FISH HABITAT [email protected]
Daés any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
No - Goo. Q1.6
(J Yes - ‘answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8,
this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the Assessment
Manager for the application, the agency has jurisdiction as Advice Agency.
JP Regulation, schedule 2, table 2. tem 26,
Page 4
Page 14
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 22
COMMUNITY INFRASTRUCTURE ‘
1.6 |\ls any’part of the premises designated for community infrastructure?
lo- Gotoat.?7 Ll Yes
tf yes, is the community infrastructure intended to be provided by a public sector entity?
CD No OYes
If yes, is the land owned by or on behaif of the State?
C1 Yes LI No
If no, is the development for the following?
(i) For the designated purpose Ono [Yes
(ii) Carried out by, or on behalf of, the designator Dino (Yes
If no to either or both (i) or (ii) above, is the proposed development assessable under the planning scheme?
O No O Yes - This application must be refered to the Queensland Government department administering the Act authorising the
developmen for the designation as Concurrence Agency.
IP Regulation, schedule 2, table 3, tent 7.
WASTE WATER MANAGEMENT
1.7| Dogs the proposal involve the establishment or expansion of a waste water disposal system?
No - End of Section? [1] Yes
{f yes, is any part of the disposal system proposed to be located in an area declared to be a catchment area under the Water Act 2000?
CI No- Endo Section? (C] Yes
If yes, is the proposed waste water disposal system an environmentally relevant activity (ERA) under the Environmental
Protection Act 1997?
D1 Yes - End of Section? [No
If no, is the proposed development involving the waste water disposal system assessable under the planning scheme?
oO No - End of Section 7 oO Yes - This application requires assessment by the Departinem of Natural Resources and Water (NRW) as
Concurrence Agency. End of Section 7
IP Regulation, schedule 2, table 3, item $.
Page 5
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 S ECTI O N 4 Section 4 must be completed when the application seeks approval to carry out operational work. PLANNING SCHEME 44 Is the proposed operational work assessable under any State planning regulatory provisions? No If no, is the proposed operational work assessable under the planning scheme? CINo - Gowas2 Yes - Complete Form 1, Pan E and answer Q4.1.1 - 4.1.7 below OYes If yes, is the proposed operational work assessable under the planning scheme? oO No ~ Answer Q4.7.1- 4.1.7 oO Yes ~ Complete Form 1, Part E and answer (4.1.1 - 4.1.7 below STATE-CONTROLLEDROAD =. ‘ oo aa 444 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? Wo If no, is the proposed operational work for filling or excavating listed in /ntegrated Planning Regulation 1998, schedule § and does‘it exceed the threshold? VIN lo C1 Yes - 7nis application must be referred to the Departinent af Main Roads (DMR) as Concutience Agency. (1 Yes If yes, is all of the proposed operational work associated with either - « — Amaterial change of use that is assessable under the planning scheme; or (Ono OYes « — Reconfiguring a tot that increases the total number of lots, or increases the total number of lots abutting the State-controlled road If no - Answer (a) - (6) below (a) Is any of the proposed operational work associated with access to a State-controlled road? No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. (b) Is any of the proposed operational work for filling or excavation? CI No O Yes oe is the operational work proposed in a future State-controlled road not defined by route? No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency oO Yes - This application must be referred to DMR as Advice Agency. (c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road? CINo Yes \f yes, is the operational work proposed in a future State-controlled road not defined by route? LINo.- tis application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. Oo Yes - This application must be referred to DMR as Advice Agency. IP Regulation, schedule 2, table 3. tem 3; IP Reguiation, schodule 2, table 3, item 1(6).” ACID SULFATE SOILS 412 Is any of the operational work proposed in a local government area listed*1 in State Planning Policy 2/02; Planning and Managing Deyeélopment Involving Acid Sulfate Soils? No -Gowaa73 [1Yes If yes, is the natural ground level of any point where work is being carried out less than 20m AHD? LI No 0 Yes If yes, does the proposed operational work involve the following? (i) Excavating more than 1,000m3 of soil or sediment at or below 5m AHD [No DYes (ii) Filling the premises with 1,000m5 or more of material with an average depth of 0.5m on Ono Des land, soil or sediment at or below 5m AHD If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Waler (NRW) as Advice Agency IP Regulation, schedule 2. table 3, tem 4, State Pleoning Policy 2/02: Pisnning anid Managing Development involving Acid Suitste Soils. section 3.6. 41 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumeti, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpeniaria, Cook, Cooloola, Douglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday Page 27
Page 16
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 22
EASEMENTS AND SUBSTATIONS
413
ls apy of the proposed operational work for filling or excavation?
No-Gowo414 [Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
C Yes LINo - Answer both (a) and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity
under ihe Electricity Act 1994?
LINo UO Yes
Ifyes, is any of the operational work proposed to be located in any part of the easement?
LINo = (1) Yes - this application must be referred to the entity as Advice Agency.
(b) |s any of the operational work proposed to be located within 10m of a substation site under the Efectricity Act
1994?
oO No oO Yes - This application must be refered to the entity responsible for the substation as Advice Agency.
IP Regulation, schedude 2, table 3 tem 10(6): IP Reguiauon, schedule 2. tate 3, sem 100).
4.1.4
ls any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Act 7923 {or the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No - Gowoa475 [Yes
If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with @
reconfiguring a lot?
LNo OD Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
No oO Yes - This application must be referred to the licence holder as Advice Agency.
EP Regulation, scheade 2, table 3, tem 17.
PUBLIC PASSENGER TRANSPORT
415
|s any of the proposed operational work listed in schedule 13C of the /ntegrated Planning Regulation 1998 and does it exceed the
specified threshold?
No - Go10 04.1.6 (1 Yes - this application must be referred to Queenstand Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 14.
RAILWAY SAFETY AND EFFICIENCY
4.16
Is any of the proposed operational work listed in schedule 13D of the /ntegrated Planning Regulation 1998 and does it exceed the
cified threshold?
No - Goto. 04.17 11 Yes - this application must be referred to Queensland Transport (Q7) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15.
KOALA CONSERVATION (outside SEQ urban footprint)
4.1.7
ls gfy part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
No - Goto. 04.2 (Yes
If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation (i.e. did you answer ‘yes’ to all questions in either 02.1.8 or Q 3.127?
(1 Yes .Gowa2 ([JNo
Ifno, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
OYes-Gowos2 [CINo
Ino, will the activity result in the following?
(i)__Clearing of native vegetation over ran area greater ‘than 2,500m2 OS oO No |Z Yes
(ii) Extracting gravel, rock or sand from an area greater than 5,000m?2 [No {LD Yes
(iil) Excavating or filling an area greater than 5,000m2 {0 No jC] Yes |
If yes to one or more of (i) - (iii) above - This appication must be referred to the Environmental Protection Agency (EPA) as
Concurrence Agency.
iP Reguiahon. schedule 2. table 3. tem 19
WILD RIVER AREA — Although legislation provides for assessment of operational works for residential, commercial and industrial development for the purposes of the
Wild Rivers Act 2005, currenlly no deciarations for any of the wild river areas apply the Wild Rivers code to that type of development.
Page 28
Page 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
AREA
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
42
Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No-Gowo43 (ClYes
Hf yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part E) if the premises are completely within a single local government area, the operational work associated with recontiguring
is assessed by the local government.
Yes
If yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban area,
as defined by the Wild Rivers Act 2005?
O No - (Complete Form 7, Part £} if the premises ate completely within a single local government area, the operational work associated with
recontiguring is assessed by the local government.
LJ Yes (Complete Form 1, Part E) If the premises are completely within a single local government area, the operational work associated with
reconfigining is assessed by the local goverrunent, and subject to the declaration for the relevam wild river area, assessment by the local
government is required for the purposes of the Wild Rivers Act 2005.
IPA, schetiite 8 part 1, table 4, tem 2: IP Regulation, schedule 1, part 2, table 5, item Te}, Wild Rivers code (Note: the code docs not curently coniain applicable provisions for residentis
industial ot commercial development inside a designated urban area).
KOALA CONSERVATION (inside SEQ urban footprint)
4.3A
Is apy part of the premises in an interim koala habitat protection area?
No - Goto 04.38 O Yes
If yes, is the proposed operational work for clearing native vegetation, as defined in draft South East Queensland Koala State
planning regulatory provisions (koala regulatory provisions)*??
[No -Gowo438 C1] Yes
If yes, does the following apply?
(i) the proposed clearing is for a domestic activity, as defined in Lino |(1Yes
the koala regulatory provisions
(i) the proposed clearing is for a building or structure of less than 500 m? Dino |DYes
| grossfioorarea
(ii) the proposed clearing will result in — L1No iL] Yes
« — the clearing of less than 2,500m? of native
vegetation, as defined in the koala regulatory
provisions; and
« no loss of mature koala habitat trees, as defined in
the koala regulatory provisions.
(iv) the proposed clearing is consistent with a development approval |[]No j (1 Yes
for a material change of use, reconfiguring a lot or operational
work that has not lapsed, where
« the application for the development approval was
made before 12 December 2008 ; or
« — the development approval was given under Division
2 of the draft South East Queensland Koala State
planning regulatory provisions.
{f no to all of (i} ~ (iv) above - The proposed operational work for clearing native vegetation may not occur and an application involving that
component cannot be made.
IP Reguiaiion, schediie 2. table 2, tem 340: Dralt Souih East Queensland Kasia State planning regutatory provisions
4? Native vegetation is defined in the draft South East Queensland Koala State planning :egulatory provisions. The term ‘clearing’ has the meaning given in the /ntegrated
Planning Act 1997, schedule 10 (dictionary).
Page 29
Page 18
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
VEGETATION CLEARING; KOALA CONSERVATION (outside SEQ urban footprint); WILD RIVER AREA
4.3B ea of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999 applies?
No-Gowase ()Yes
Ityes, is the proposed clearing assessable (i.e. not an exception) under schedule 8, part 1, table 4 of the IPA?
LINo-Gowars (Yes
If yes, is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section 22A
for one or more of the following?
(i) A project declared to be a significant project under the State Development and Public Works |) No |) Yes
! Organisation Act 1977, section 26
Gi) __ Necessary to control non-native plants or declared pest LE No {D1 Yes |
"ai To ensure public safely ; Clo {C0 Yes
(iv) For establishing a necessary fence, firebreak, road or vehicle track, or for constructing CJNo }L1 Yes
necessary built infrastructure, if there is no suitable alternative site for the fence, firebreak,
__ Toad, track or infrastructure de ef
(vy) A natural and ordinary consequence of other assessable development for which a Ono 1/0 Yes |
development approval as defined under the Planning Act was given, or a development
_application as defined under the Planning Act was made, before 16 May 2003 fe
(vi). For fodder ‘harvesting . 7 _ {No J Yes | @
(vil) Fort thinning Bo __._____ {No [Yes
(viii) For clearing of encroachment oo _ [CNo |L1 Yes |
(ix) For an extractive industry (No {1 Yes
(x) For clearing regrowth on leases issued under the Land Act 1994 for agriculture or grazing CINo {C1 Yes
purposes
| (xi) For clearing regrowth on freehold tand, or indigenous tand, in a wild river high preservation {[_]No |] Yes
i area.
If no to all (i) ~ (xi) above - The clearing is not a relevant jrupose and the Assessment Manager must refuse to receive the application.
If yes to any one of (i) - (xi) above, is the proposed clearing associated with a material change of use or reconfiguring a
lot for which referral is required in relation to clearing vegetation (ic. did you answer ‘yes’ to all questions in either 2.1.4 or Q3.3?
CJ Yes - Goto 04.4
oO No ~ Answer (4) (b} and (c} on the next ‘page of this Checklist.
Page 30
Page 19
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA (continued) : +
{a) fs any of the proposed clearing in an area deciared as an area of high nature conservation value (other than a
wild river high preservation area) or an area vulnerable to land degradation under the Vegetation Management
Act 1999?
Oo No - (Comptete Form 1, Part J). This application requites assessment by the Department of Natural Resources and Water (NRW).
if NRW is nat the Assessment Manager, the agency has jurisdiction as Concurrence Agericy.
O Yes
If yes, is any of the proposed clearing for (v), (vi), (ix) or (x) above? ~
LI No - (Complete Form 1, Part J). This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRV/ is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
oO Yes — The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application
(b) Is any of the proposed clearing in the high preservation area of a declared wild river area?
No - (Complete Form 1, Part J). This application requires assessment by the Department of Natural Resources and Water (NRW).
J NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
(Yes
If yes, is any of the proposed clearing for the following purposes?
{i)__For (i), (vi), (vi) or (ix) above Co | Cl Yes
{ii) For (x) or (xi) above and in a high preservation area outside of a CNo | D1 Yes
registered area of agriculture as defined under the Vegetation
Management Act 1999
If no to either or both (i) or (ii) above - Subject to the declaration for the relevant wild river area, the application
requires assessment for the purposes of the Wild Rivers Act 2005 - Complete Form 1, Part J. This application
requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment
Manager, the agency has jurisdiction as Concurrence Agency.
If yes to either or both (i) or (ii) above, is there a property development plan approved under the Wild
Rivers Act 2005 applying to the land?
oO No - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.
oO Yes - Unless the application is consistent with any approved property devolopment plan applying to the and, the
Assessment Manager must refuse to receive it. Subject to te declaration for the selevant wild river area, ihe
application requires assessment for the purposes of the Wild Rivers Act 2005 - if an application is made
complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Managet, the agency has jurisdiction as Concurrence Agency.
(c) Is any of the proposed clearing in a koala conservation area or koala sustainability area, other than in an
SEQ urban footprint area?
[No - Go a44 OJ Yes
If yes, is any of the proposed clearing associated with reconfiguring a lot for which referral is required in
relation to proposed clearing in a koala conservation area or koala sustainability area (i.e. did you answer
‘yes’ to all questions in Q3.127?
(Yes - Gota44 [No
If no, is any of the proposed clearing over an area greater than 2,500m??
LINo - Gowos
LD Yes - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence
Agency.
IPA, schedule 8, part 1, table 4, tems TA-1G; IP Reguistion, schedule 2. table 2, tem 5 (vegetation Sean, iP Reguiation, schedule 2, table 2, tem 34 (koala conservation). IP Requiation, schedule 7, part
3 table 4, fem (vegetation dearing/vald tives atea); Vegetation Management Ad 1999, section 22A (vegetation cleaving wid river rca}: Wad Rivers Aa 2005, sections 3 1F and 43A, Wid Rivers Cade.
Page 31
Page 20
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44
's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under the Water
oe section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
lO - Goo 045 oO Yes - Answer (a) and (b) below
{a) Are the operations mentioned as self-assessable development in the following?
(i) Awater resource plan under the Water Act 2000 ONo C1 Yes
(ii) A wild river declaration under the Wild Rivers Act 2005 [_] No OO Yes
(iii) A regulation under the IPA or the Water Act 2000 (No 0 Yes
If no to all of (i) to (ili) above - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to (b)
(b) 1s any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 2005?
OC Yes
If yes, is the work for the following?
(i) A water pump
(ii) Water storage _ |
(iii) Gravity diversion from a watercourse
(iv)_ Watercourse diversion Ld
{v)__Other work for taking or interfering with water ”
(Yes (Complete Form 1, Part Kz)
oO Yes (Complete Form 1, Part Ks)
CI No
| LJ No
[CNo | (1 Yes (Complete Form 1, Part Ky) @
(No
| CNo
(1 Yes (Complete Form 1, Pant Ke)
If yes to any one of (i) to (v) above - any part of the proposal relates to operational work that interfores with water in a high preservation
area, or in a nominated waterway (other tan lor a dam or weit), the application will be taken to be not properly made and the Assessment
Manager must refuse to receive it. All other proposals are subject to the declaration for the relevant wild river area, and assessinent may
be required for the purposes of the Wild Rivers Act 2005. The appiication will equie assessment by the Department of Natural Resouces
and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
{Complete the relevant Form 1, Part K as indicated in the table above if an application is made.)
CINo
s ; A water pump
oO!
Zz,
oO
ID.
“ae
&
‘S
3
=
8
Fh
=
&
&
s
(ii) Water storage
di , Gravity diversion from a watercourse
(iv) Watercourse diversion —
lw Other work for taking or interfering with water
10
C1 Yes (Complete Forin 3, Part Ky)
C1 Yes (Complete Form 1, Part Ke)
|
jo
o
Zz
o
i
‘O
=<
oD
g
2
g
Ss
8
S
oa
g
>
g
(1 Yes (Complete Form 1, Part Ke)
i
If yes to any one of (i) to (v) above - The application mitlrequie assessment by the Departinent of Natural Resources anu Water (NRW). If NRW
fs not he Assessment Manager for ihe application, the agency has jurisdiction as Concurrence Agency.
{Complete the relevant Form 1, Part K as indicated in the table above.)
IPA, schedule 8 pait 1, table 4, teins 3a). IP Regulation, schedile 2. table 2. tem 8: P Regulation, schedule 1 part 2. table 4, items 2 and 3A; Water Act 2000, soction 966A (wild river @
area); Wild Rivers Act 2005, section 43A. relevant wntd nver declaration: Wild Rivers Code.
4.5
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No - Go 10 04.6 oO Yes - (Complete Form 1, Pant K,) This application requires assessment by the Department of Natural Resources and Water (NRW). If
NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schedule 8, part 1, table 4, item 3{b): P Regulation, schedule 2, table 2, tem 8; IP Regulation. scheduie 1, part 3, table 4, item 3: relevant wild river declaration, Wild Rivers Code (Note:
the code does fot currently contain applicable provisions for taking a interfering with artesian water).
Page 32
Page 21
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)
4.6 | Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water}?
MNo -Goi0as7 = 1 Yes - Answer (a) and (bj below
{a) Are the operations mentioned as assessable development in the following?
{i) Awater resource plan under the Water Act 2000 CINo C1 Yes
(ii) A regulation under the IPA or the Water Act 2000 [no (Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ka), This application requires assessment by the Department of Natural
Resources and Water (NRW). if NRW is not the Assessment Manager for the appiication, the agency has jurisdiction as
Concurrence Agency.
{b) ls any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
river area declared under the Wild Rivers Act 2005?
O No Oo Yes - if <ény part of the proposal relates (0 operational work in a high preservation area other than works stated in a wild tiver
declaration for the atea to be assessable development for which a development application may be made, the application will
be taken to be not properly made and the Assessment Manager must refuse to receive it. All other proposals are subject to the
declaration for the efevant wild river area, and assessmem may be required for the purposes of the Wild Rivers Act 2005.
(Complete Form 1, Part Keif an application is made.)
IPA, schedule 8 part 1, table 4, em Hci}; IP Reguiation, schedule 2, table 2, tem 8; 1P Regulation, schedule 1, pait 3, table 4, tenn 3; Water Act 2000. section 966A (witd tiver area): Wild
Rivers Act 2005, section 42A: relevant wild river deckuation; Witd Rivers Code.
4.7 |\s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
ihterfering with subartesian water (other than using a water truck to pump water)?
No-Gowa1s (L1Yes
{f yes, are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 CINo Yes
(ii) A regulation under the IPA or the Water Act 2000 LINo (J Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Pan K,) This application requires assessment by the Department of Natu at
Resources and Water (NRW). if NRW is not the Assessment Manager for the application, ihe agency has jurisdiction as
Concurrence Agericy.
WPA schedute B part 1 table 4. item 3{c}{i): IP Regulation, schedule 2. table 2. tem 8: 1P Regulation, scheduie 1. pit 3, table 4, dem 3: Wates Act 2000, section: 966A (ld rivey avea){Nore: no cunenn wad
tives decletation identiies taking oc interfering wih substtesian water as assessalne): Wid River code (Note: the code does nol currently contain applicable provisions for subartesian wete).
4.8 | Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering
with overland flow water (other than using a water truck to pump water)?
No -Go10Q49 — [_] Yes - Answer both (a) and (b) below
(a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005?
(Yes
If yes, indicate what the proposed operational work relates to
(i) Specified works for the area LINo (Yes
{ii) Work state in the relevant wild river declaration to be CONo (Yes
assessable development for which an application may
be lodged
if yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ko Subject to the dectaration for the relevant wild river area, assessment
may be required for the purposes of the Wild Rivers Act 2005)
If no to both (i) and (ii) above - she application will be taken to be not properly made and the Assessmem Manager must retuse to receive it
CONo
If no, are the operations mentioned as assessable development in the following?
(i) A water resource plan under the Water Act 2000 LI No (Yes
(ii) A regulation under the IPA or the Water Act 2000 LI No (Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kr) This application requires assessment by the Department of Natural
Resouices and Water (NRW). if NRW/is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
{b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
CINo (Yes - (Complete Form 1, Part Kia) This application requies assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessinent Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1. able 4, xems 3c} and 3d): IP Regutaiion. schedtae 2, iabke ? aem 9 IP Regetauon, schedue 1. pan 3 table 4. tem 3A: Water Act 2000 secnon 9668 (wid river area).
televari wild river dectaration; Wild Rivers Code.
Page 33
Page 22
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 22
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)
4.9 _|Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Supply (Safety [Kio (1 Yes
and Reliability) Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% Eo CJ Yes
Hyes to either or both of (i) or (ii) above - (Complete Form 1, Part Kx} This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for tre application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 4, IP Reguistion, schedule 2, table 2, item 10.
TIDAL WORK; WILD RIVER AREA
4.10 ||s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No - Go1oas11 — ([] Yes - Answer (a) and (b) below
(a)_ Is any of the proposed tidal work prescribed tidal work? _
OD Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
[LI No
If no, is the work proposed in a canal?
No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
LINo- (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transpon (Maritime Safety Qid) as Concinrence Agency.
: oO Yes - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
| application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensiand
Transport (Maritime Safely Qld) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
CO Yes
{f yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
No - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qld) as
Concurrence Agency.
O Yes - (Cuinplete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qid) as
- Concurrence Agency and Qid Fire and Rescue Service as Advice Agency. ae we
ChYes —. . 2
Ifyes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
LINo-An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it
_ OYes
! if yes, is the work proposed in a canal?
{ CJ No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No ~ Unless the application is consistent with any property development plan applying to the land, the Assessinent
! Manager must refuse (0 receive it. (Complete Forin 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and assessmem for the purposes of the Wild Rivers Act 2005.
O Yes ~ Uniess the application is consistent with any, property development plan applying to the land, the Assessment
Manager must refuse lo receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
|
I
: | OU Yes
oO No - Unless the application is consistent with any property development plan applying (o the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P} This application must be referred to Queensland
Transport (Maritime Safety Qid) as Concurrence Agency. Subject to the declaration for the relevant wild river
' afea, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
! DO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
| Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safety Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
The application also requires assessment for the purposes of the Wild Rivers Act 2005. | _
. _TINo- Go to the frst question on the next page of this Checklist _
Page 4
Page 23
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
TIDAL WORK; WILD RIVER AREA (continuea)
Ifo, is any of the proposed tidal work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
C1 Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
LI No -An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
Yes
{f yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it. (Complete Form 1, Part M) This application requires assessment by the Environmental Protection
Agency (EPA). if EPA is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agenty. The application also requires assessment by Queenstand Transport (Maritine Safely Qid) as Concurrence Agency
and, Subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005,
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessmem Manager
must refuse to receive it. (Complete Form 1, Part M) This application requires assessmem by the Environmental
Protection Agency (EPA). if EPA is not tie Assessment Manager for the application, the agency has jurisdiction as
Concuntrence Agency. The application also requires assessment by Queensland Transport (Maritime Safety Qid) as
Concimence Agency and Qid Fire and Rescue Service as Advice Agericy. Subject to the declaration for the refevant wild
river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
CINo
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - (Conplete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concturence Agency. The application
also requies assessmem by Queensland Transport (Maritime Salety Qid) as Concinrence Agency.
oO Yes - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requites assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency) and Qid Fite and
Rescue Service as Advice Agency.
(b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
(i)__ One only local government tidal area Ono |LYes
(ii) Starting in one local government tidal area and extending into another local govemment tidal /()No |L Yes
|___ area (but in no strategic port tidal area)
(iii) In two or more local government tidal areas but not starting in either local government | tidal area Ono [DO Yes |
(iv) One only strategic port tidal area ONo | Yes
(v) A tidal area that is not a strategic port tidal area or a local government tidal area CONo | Yes
Note: The answers you provide in (i) - (v) above may affect wha the Assessment Manager is for the application.
APA, schedule 8, part 1, table 4, tem 5, 1P Regulation. schedule 2, table 2, toms 12, 14 and 17; IP Reguiation, schedule 1, part 3, table 4, items 4A and 5; Coastal Protection and
Managemen Act 1995, section 104A (wild tiver arca).
Page 35
Page 24
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11
CaN. of the operational work proposed to be carried out within a coastal management district?
No -Gotoo4iz2 (]Yes
__lfyes, is the proposed operational work for the following? _
; {i) _ Interfering with quarry material on State coastal land above high-water mark oo. ‘O No {0 Yes
(ii) Disposing of dredge spoil or other solid waste material in tidal water# ra No ,C] Yes
(iii) Draining or allowing drainage or flow water or other matter across State costal land above high-water : LJ No OO Yes
mark
i) “Constructing or installing works ina watercourse where the works are not assessable under IPA, (No |() Yes
_ items 3 or 4 oo eee ee __
(v)_ Reclaiming land under tidal water® 2 {Eine | Yes |
(vi) Constructing an artificial waterway, other than a canal, associated with reconfiguring alot a} No. (Yes
(vii) Constructing an artificial waterway that is a canal, associated with reconfiguring a lot= __{UNo |L1 Yes
(vill) Constructing an artificial waterway not associated with reconfiguring alot on land, other than State LNo |( Yes
_ Soastal land, above high-water if the maximum surface area of water on the waterway is at least 5,000m? _..
{ix) Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, [No [1 Yes
__, above high-water mark oo _ . 4 J
{x) Removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion DNo |C Yes @
prone area and above high-water mark . _ a L |
If yes to one or more of (i) - (x) above, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act
2007
oO No - (Complete Form 1, Patt M) This application requires assessment by the Environmental Protection A Igency (EPA). If EPA is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. I! yes, above, to any shown bold and marked with the symbol,
the application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency.
D Yes
Ifyes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
YeS - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it
(Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessment
‘Manager for the application, the agency has jurisdiction as concurrence Agency. if yes, above, to any shown bold and marked with the symbol 4, the
application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency. Subject ta the declaration for the relevant
wild river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
[No - An application for the operational work will be taken to be not properly made and the Assessment Manager must reluse to receive It.
JPA schedule 8, part 1, table 4, tem 5; 1P Regulation, schedule 2, table 2 tems 12 amd 14; 1P Regulation. schedule 1, part 3, table 4, items 4A and & Coastal Protection and Management
Act 1995 Act 1995, section 104A (wild river area): Wild Rivers Act 2005, section 43A.
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12
i oy of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gowos13 [LJ Yes
If yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005? @
LINo
If no, is all of the operational work for constructing or raising waterway barrier works - tick applicable box/es and answer (a) and/or (b) below
jC) temporary no | Yes
: (ii minor . ; [No | D1 Yes
(iii) rebuilt on a regular basis [No O ves
(a) If yes to one or more of (i) - (iii) above, does all the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code?
DD Yes - 4 permit for that aspect of the operational work is not required. Go to 04.13 LINo - Gote
(b) If no to all of (i) ~ (iii) or no to (a) above - (Complete Form 1, Part Q,) This application requires assessment by the Department of Primary
industries and Fisheries (OPI&F). If DPIGF is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
OYes
ILyes, is any of the proposed operational work to be carried out in a wild river high preservation area?
No - Unless the application is consistent with any, ‘Property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part O,) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). and,
Subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the
Assessmem Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - An application for the operational work will be taken to be not ‘properly made and the Assessment Manager must refuse to receive it.
IFA scheckie 8 par 1. table 4. item 6: IPA, schedule 8, part 2, table 4. tem 2: Fisheries Regulation 1995 $113A (self assessable codesh IP. Regulauon, schedule 2 table 2. tem 28, 1P
Requiaton, schedule 1, part 3. table 4. item 6; Fishesies Act 1994, section 76D (enld tives area): Wild Rivers Act 2005, section 43A.
Page 36
Page 25
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
DECLARED FISH HABITAT AREA; WILD RIVER AREA
4.13
ls any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
Act A994,
No -Gowoss [Yes
If yes, is the operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
(i) The maintenance of existing structures, including for example the following structures, if the structures | (_) No} [J Yes
were constructed in compliance with all the requirements, under any Act, relating to a structure of that
type —
+ Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs;
« Existing powerlines or associated powerline infrastructure
(ii) Educational or research purposes relating to the fish habitat area LI No|[L] Yes
(iii) Monitoring the impact of development on the declared fish habitat area LINo} (J Yes
(iv) The construction or placement of structures, including for example, safety signs, swimming enclosures | [_}No![] Yes
and aids to navigation, if ~
+ The impact on the area is minor; and
+ The structures are constructed in compiiance with all the requirements, under any Act, relating to a
structure of that type
(v) Public benefit works, including, for example, the construction of runnels for mosquito control, the (1No|C Yes
removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is minor
(a) If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
Co Yes -A permit for shat aspect of the operational work is not required. Go to Q4.14 CINo - Goto (0)
(b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
LINo- (Complete Form 1, Part Oz) This application requires assessment by the Deparment of Primaty industries and Fisheries (DPI&F). If DPIRF is not
o y the Assessment Manager for the application, the agency will have jurisdiction as Concurrence Agency.
‘es
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse 10
receive it. (Complete Form 1, Part O2) This application requires assessment by the Department of Primary Industies and Fisheries
(OPISF) and assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not he Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency.
LINo
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
C] No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse
to receive it. (Complete Form 1, Part O2) This application requires assessment by the Department of Primary industies and
Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers
Act 2005. if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
C1 Yes - An application for the operational work will be taken to be not properly made and the assessment manager must reluse to
receive il.
IEA, schedule 8 part 1, table 4. item 7 IPA, schedule 8, part 2. table 4, tem 3. Fisheries Regulation 1995 s 113A (sei-assessahle codes), IP Regulation. schedule 2, table 2, tem 25 1P-
Regulation, schedule 1, pant 3, able 4, item 7: Wid Rivers Act 2005, sections 434, Fisheries Act, section 7GUC {wild river area).
Page 37
Page 26
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA 414 iar of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 19947 No -Gowo4is [Yes If yes, is t is the proposed operational work reasonably necessary | for: (Tick applicable box/es and answer a) and/or (b) below) (i) There The removal, destruction or damage of dead marine wood on unallocated State 2 land, ‘other th than ina (or No oO Yes | wild river area, for trade or commerce ;__ Wile rive e qe 2 fd i (ii) The maintenance of existing structures, including, for example, the following structures, if the CNo |L Yes structures were constructed in compliance with ail the requirements, under any Act, relating to a structure of that type — i + — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and weirs; + — existing drainage structures; L . existing p powerlines or associated powerline infrastructure — | (iii) For educational or research purposes or for the monitoring the impact of development on marine O No | Oy Yes Plants (iv) ) For the construction or placement of structures, ‘including, for example, swimming enclosures, safety | Ono |( Yes signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if - + The extent of the removal, destruction or damage is minor; and + The structures were constructed in compliance with all the requirements, under any Act, relating __ toa structure of that type_ i (v) ‘For the construction of runnels for mosquito control, removal of L _yngbya, seed collection for site fm] No. oO Yes rehabilitation or the coltection of marine plants for fishing bait, or handicraft i. (a)_ If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of Primary Industries and Fisheries (DPI&F) self-assessable code? oO Yes - A permit for that aspect of the operational work is not required. Go to Q4.15 oO No - Goto (b) (b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005? oO No - (Complete Form 1, Part O,) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. O Yes If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005? oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (OPI&F) and, subject to the dectaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If OPIAF is not the Assessment Manager tor the application, the agency has jurisdiction as Concurrence Agency. OONo Ifo, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or infrastructure required to support other development for which a development permit is not required or, if a development permit is required, the permit is held or has been applied for? oO Yes - Unless the application is consistent with any property development plan applying to the land, ie Assessment Manager must refuse to receive it. (Complete Fonn 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries (OPIGF) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. oO No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive tt. IPA schedule 8, part i, table 4, tom 8: IPA, schedule 8. pant 2. table 4, tem 4; Fisheries Reguiation 1995 113A (sei assessable codes): IP Regulation, schedie 2, table 2, item 29: IP Regidation, schedule 1. part 3. table 4, item 8: Fisheries Act 1994, section 76DB (wild river area); Wild Rivers Act 2005, section 43A; relevar wild river deciaration: Wild Rivers Code. Page 38
Page 27
INTEGRATED PLANNING ACT 1997
WILD RIVER AREA
4.15
Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
lo -Gowa4i6 [J] Yes
If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 [LINo Yes
(i) Animal husbandry activities as defined under the Wild Rivers Act 2005 ONo C1 Yes
If yes to either {i) or (ii) above, is any part of the premises in the wild river high preservation area?
Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
LINo
fino, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
Yes - An application for the operational work will be taken to be not properly made and the Assessmem Manager must refuse to receive tt
oO No - Untess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agriculture. Complete Form 1, Part R fanimal husbandry) Subject to the declaration for the
relevant wild river area, his application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, putt 1, lable 4, item 10: 1P Regulation. schedule 2, table 2, tem 37; Wild Rivers Act 2005, sections 42, 43A,
STATE-CONTROLLED ROAD
4.16
Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No - Endofsection4 [L] Yes
If yes, is the proposed operational work associated with either -
« A material change of use that is assessable under the planning scheme; or LINo (LJ Yes
+ — Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
abutting the State-controlled road
If no, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under
IPA, schedule @ - Answer (a) - (c) below.
(a) Is any of the proposed operational work associated with access to a State-controlled road?
No O Yes - This application must be releuied to the Department of Main Roads (OMR) as Concaence Agency.
(b) Is any of the proposed operational work for filling or excavation?
CINo (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
O No - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
Yes - this application must be referred to the DMR as Advice Agency.
(c) Does any of the proposed operational work invalve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
LINo 0 Yes
If yes, is the operationat work proposed in a future State-controlled road not defined by route?
oO) No - This application must be referred to the Department of Main Roads (BMR) as Concurrence Agency.
C1 Yes - this application must be referred to the DMR as Advice Agency.
IP Regulation, schedule 2 lable 2. item 3.
Page 39
IDAS Assessment Checklist, Version 22
Page 28
‘Sunshine Coast
Regional Council
24 March 2009
Chantay Too Pty Ltd
CARE Martoo Consulting Pty Ltd
PO Box 1684
KiSI6-
Locked Bag 72 T 07 5475 7272
Sunshine Coast Mail Centre F O7 8475 7277
Qid 4560 & [email protected] 37 876 973 913 W wvausunshinecoast.qld.gov.au
Officer: Evelyn Murphy
Direct Telephone: (07) 5449 5225
Response Address: PO Box 141, Tewantin QLD 4665
Email: EN jecoas OV,
Our Reference: 2008/1867
Your Reference: 00800 LO5 MK
SCEIVED
neo consulting SC
L O Courter
NOOSA HEADS QLD 4567
vfs 95 MAR 2009 Gone
File ROK, scans haedte
ROLLIE vereef
Dear Madam
Decision Notice
integrated Planning Act 1997
| refer to your application and advise that on 24 March 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
Application No: 2008/1867
Street address: 51 Elanda Street, Sunshine Beach
Real property description: Lot 403 RP 48112
Planning Scheme:
The Noosa Plan
The following type of approval has been issued:
. Development Permit for Material Change of Use - Multiple Housing Type 2 - Duplex
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
Land Use
4. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and may
be amended by these conditions: -
; Plan’ TT Rev.
: Document No.
° | DA-DO8
‘Plan? Document Name ‘Date
Floor P
| Architecture i '
Page 1 of 14
Caloundra Office
+ Omrah Avenue
Maroochydore Office
11-13 Ocean Street
Tewantin Office
9 Pelican Street
Nambour Office
Cnr Currie and Bury Streets.
Caloundra Qld 45514 Maroochydore Qld 4558 Nambour Qld 4560 Tewanlin Qid 4565
T O07 5420 8200 ¥ O7 5475 8501 T 07 5475 8501 ‘4 07 5449 5200
F 07 5420 8900 F 07 5444 8338 F 07 5441 8338 F 07 5447 1062
Page 29
2008/1867 “DA-D04— i Ground Floor Pian East — Andrew Bock! 17 October 2008 — : : Architecture i : “DA-DO5 = Floor Plan Level 1 — Andrew Bock! 17 October 2008 | | Architecture ; i “DA-D06 1 Tf Floor Plan Level 2 — Andrew Bock | 17 October 2008 4 Architecture i ' DA-DO7 _ | Roof Plan— Andrew Bock Architecture | 17 October 2008 | i | DA-E.01 North “Elevation —~ Andrew Bock | 17 October 2008 : Architecture /DAE02 ~~) | South" Elevation’ “" “Andrew © Bock | 47 Gctober 2008“! : Architecture : * DA-E.03 East “Elevation — Andrew Bock | 17 October 2008 | ; Architecture DA-E.04 oT West Elevation — “Andrew” Bock ! 17 October 2008 ! i Architecture i : DAF OT A | A-Section 61 ~~ Andrew Bock | 28 January 2008 | Architecture ' i “DAF.O2 OY ‘|’ -Section 02 = Andrew Bock Architecture | 28 January 2008 : DA-F.03°~” “~~ T -Section 03 — Andrew Bock Architecture | 28 January 2009 “DAF.04 | ~—_—'| -Section 04 — Andrew Bock Architecture | 28 January 2009S , DA-F.O5 "1" "Section 05 — Andrew Bock Architecture | 28 January 2009. “DAZ.03 | ~~ Ss«| View from South East — Andrew Bock | 47 October 2008 Architecture : !DA-Z.04 View from South West 2 — Andrew Bock | 17 October 2008 i Architecture \ The development must be undertaken and operated In a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The open space ‘and setback areas are to be landscaped in accordance with Council's Policy on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter and shail include:- 3.1 A minimum of 2 street trees are to be provided along the sites frontage. 3.2 Screening vegetation is to be provided along the side boundaries. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. These landscape plans required to be submitted are to denote areas of existing vegetation or existing trees proposed or required to be retained. All fencing shail be setback at least 1 metre from the front property boundary, with at least half of the fencing setback 2 metres. The area of land between the fence and the front property boundary shall be densely landscaped to screen any fencing from the street Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining as open structures. Page 2 of 14
Page 30
2008/1867 10. 11. 12. The premises are to be identified by the provision of a street number in a prominent location to ensure it is identifiable to all persons, particularly emergency services personnel. Building Height is to be a maximum of 3 stories and 12 metres above natural and finished ground level as per the Noosa Pian. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of work confirming compliance with the maximum allowable buitding height as required by either the conditions of _ approval or the Planning Scheme. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for operational works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises, Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. The Development Permit for a material change of use of premises lapses if the use has not happened by 24 March 2013, unless an application to extend the relevant period is approved by Council. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works. Building Services 13. Lan Fences are not permitted to exceed 2 metres above natural ground level. Vehicle Access 14. 15. 16. 17. 18. A vehicular access driveway shall be constructed to the site frontage with a maximum width of 3.5m within the Elanda Street Road Reserve. The driveway must then increase In width to a minimum of 5.5m within the property to allow passage of two cars on the driveway. The driveway shail be designed and constructed to Council's design standards and to grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any step or level difference. Should any driveways be constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels that do comply. Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall, To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the driveway and any associated fencing or vegetation near the driveway shall-comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant shall demonstrate compliance by illustrating these sight lines on the plans submitted for both Operational Works approval! and Building Works approval. All vehicles shall enter and leave the site in a forward direction. The vehicle manoeuvring area at the northern end of the driveway shall remain unobstructed at all times. Signage shall be installed to ensure vehicles do not park in the vehicle manoeuvring area. Off Street 19. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter the space ina forward gear, reverse and leave the site in a forward gear in a total of three movements. Page 3 of 14
Page 31
phere 2008/1867 20. The carpark and driveway area must have a minimum head clearance (headroom) of 2.2m at any point. Frontage Works 21. 22, 23, Footpath improvements such as topsoiling, grassing, and tree planting are required to the Elanda Street frontage of the site in accordance with Planning Scheme Policy PSPO3 Landscaping Plants & Guidelines. Grass shall be couch, free of weeds. A new 1.5m wide concrete path shail be constructed along the Elanda Street frontage of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. The footpath shall connect to and match evenly with the existing footpath networks located to the north and south of the site. All paths, driveways and parking areas Shall be designed and constructed to ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility. Road Works 24, The full length of the Elanda Street frontage of the development site shail be upgraded by providing kerb and channel, bitumen road widening and landscaping improvements to the footpath. The new kerb and channel shall be aligned so that it is located 8 metres off the existing kerb and channel on the western side of the road measured from the nominal face of the kerb, All associated and ancillary work including pavement correction to the existing pavement, drainage works, modification of the footpath, and adjustments to the existing infrastructure shall be undertaken to complete the roadworks widening. In this regard, plans detailing this work shall be prepared and submitted to Council for approval prior to obtaining a Development Permit for Operational Works. Roof Water & Stormwater Drainage 25. 26. Roof runoff from any new building shall be directed to a ralnwater storage system or tank that is installed to ensure water from the rainwater storage system or tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC) current at the time of building approval, and shall be part of the plumbing application for approval. The location and capacity of the tanks shall be clearly shown on the plans submitted for Operational Works approval and any overflow shall be directed to the approved stormwater discharge point. All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site may be discharged to Council's existing drainage structures at either the grated stormwater pit at the south east corner of the site or to the kerb and channel in the Henderson Street road reserve. Stormwater drainage permitted to drain from the site must be in accordance with an Operational Works Approval for stormwater drainage. The Operational Works application for stormwater drainage must clearly demonstrate to the satisfaction of the CEO's delegated officer that the stormwater structure nominated to receive site drainage has sufficient capacity to recelve any additional flows generated from the site. Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer of Queensland (RPEQ) and submitted to Council prior to obtaining a Development Permit for Operational Works. The maximum discharge of stormwater drainage allowable to Council's kerb & channel street drainage system at any one location is 25 litres/second. - Page 4 of 14
Page 32
2008/1867 27. 28. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. As the site is proposed to be filled, stormwater drainage pipes and/or an overland flow-path that caters for drainage from the adjoining sites for a design storm with an Average Recurrence Interval of 1 in 100 years shall be installed within the site to collect and discharge stormwater runoff from all adjoining properties to prevent additional ponding/flooding on these properties. All site stormwater drainage shail be by means of a gravity system. Sewer Mains 29. 30. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council's.standards and requirements at no cost to Council. . The existing sewer main that traverses the rear of the site and the ‘zone of influence’ (taken as the area within a 45-degree angle measured from the ‘invert of the sewer main to the finished surface level) shall be accurately located and determined by a licensed Surveyor and shown on all plans submitted for Operational Works approval. To ensure Council's sewer main is accessible for maintenance purposes and is protected from tisk of damage no structures requiring a building permit (eg. buildings, swimming pools, retaining wails exceeding 4m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater. As such the applicant shall amend Operational Works plans including Building plans to ensure compliance. Town Water Supply 31. 32. 33. 34, The site shall be connected to Council’s existing town water supply and be constructed in accordance with Council's standards and requirements at no cost to Council. The development shall be served by individual water meters to each tenement and be capable ‘of being separately rated. Each individual water connection to the water reticulation system shall extend fo the property boundary and be metered. All fees for the supply of water meters shall be paid to the Council. Ali water meters must be located outside the property boundary and in an easily assessable location to facilitate unhindered reading by Council and/or Council's contracted water meter readers, and not behind fences or locked gates. In this regard approval of the water meter configuration and location must be obtained from Council's Water & Sewerage Capital Works Manager prior to lodgement and approval! of hydraulic drawings. Service Easements (Sewer) 35, A registered easement shall be created over the zone of influence of ali sewers within the subject site and over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The easements shall generally be paraltel to and centred over the sewer main and be equivaient in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall accurately locate all sewer mains and determine the necessary width of the easement, which shall be shown on any plans submitted for Operational Works approval. To this extent the surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to be created. In addition to this the Applicant’s Solicitor shail give Council's Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Tittes Office forms or requisitions requiring the consent of Council will be attended to promptly. Page 5 of 14
Page 33
2008/1867 36. A duly executed copy of the easement shail be submitted to Council for perusal prior to the use commencing. Any changes required by Council's Solicitor must be corrected immediately. No building or other structure shall be constructed or encroach over an easement. Earthworks 37. 38, Earthworks on site shall be carried out in accordance with Council’s Planning Scheme Policy PSP5 — Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed site surveys indicating natural surface levels and contours of the adjoining properties must be provided with the application for a Development Permit for Operational Works for Drainage. This may require the design and construction of drainage pipes and/or an overland flow-path within the development site that caters for drainage from the adjoining sites for a design storm with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the drainage pipes or overland flow-path will also be required. In this regard a Development Permit for Operational Works shall be obtained. Should evidence be provided to Council indicating that no additional ponding of stormwater will occur on the adjoining properties the requirement for the drainage pipes, overland flow- path and easement shall not apply. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or structures that border the development site. Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval, Erosion and Sediment Control 39, 40. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Scour of the site shall not occur as a result of the approved development. In this respect, all overland flow path areas must be suitably stabilised. » Contributions Towards Council Infrastructure 41. Monetary contributions shalt be paid to Sunshine Cost Regional Council towards the cost of providing and/or upgrading various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution amounts under the current Council policies and requirements is outlined in the table below: PSP 12 — Public Open Space Contributions (Park) $ 3,164 PSP16 — Sewerage Headworks Contributions $3,513 PSP17 ~ Water Supply Headworks Contributions | $4,956 PSP20 — Pathway Trunk Network Contributions $711 TOTAL Contribution Amount = $ 12,344 ‘Page 8 of 14
Page 34
2008/1867 Groups Brisbane from December 2008 until the date of payment. Please note, that these amounts are all subject to variations in the Consumer Price Index, All All contributions must be paid prior to the issue of a Development Permit for Operational Works. . Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. . Processing of bonds for security where specific Council approval has been given for the bonding of contributions will incur an administration fee in accordance with Council's Land Development Commercial & Regulatory Fees at the time of lodgement. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the paid contributions and/or the trading bank guarantee will be returned. General 42, Any damage caused to any public utility during the course of construction shall be repaired to Council's standards and at no cost to Council. 43. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. 44. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. Environmental Health 45. Where the development invoives the removal, relocation or demolition of a building, a Waste Management Plan (construction and demolition) shall be submitted prior to demolition, removal or relocation of any building other than a shed. Waste Management Plans (construction and demolition) are required to be submitted in accordance with Planning Scheme Policy 11, Waste Management Plans see table below. Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste materials. These shail be located so that they are convenient and safe to use. (Refer to Noosa Council Waste Management Code) The Plan shall contain the following information: . e The site area for the storage and separation of waste is to be shown on the plan drawings accompanying the application, . A waste management table as indicated below is to be completed showing how waste material is to be segregated - recycled — reused or disposed. Page 7 of 14
Page 35
2008/1867 46. 47. MATERIALS ON-SITE DESTINATION Re-use and Recycling Disposal Expected waste materials ‘Estimated volume(m?*) On-site “specify proposed te-use or on-site Off-site “specify contractor and recycling outlet “specify contractor and landfill site or other disposal site recycling methods Excavation material Green waste Bricks Concrete Timber-please specify Plasterboard Metals - please specify Asbestos Other - specify please Note * Ifa demolition contractor Is undertaking works, then the Waste Management table is to be completed by the demolition contractor. The purpose of the Waste Management Pian is to facilitate the segregation of waste for the effective reuse and recycling of such materials. Additionally Council rewards those who segregate waste by significantly reducing disposal fees at the landfill some items are free. Higher gate fees are charged for loads of mixed waste. The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and ‘Industrial Premises", including an external imperviously paved area correctly sized for all refuse and recycling containers and sultably screened from public places and neighbouring properties. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool Pumps etc) shall comply with the following requirements: 47.1 The equipment shall be installed and located in a manner that prevents excessive Noise in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences. >» 47.2 Aperson must not use equipment on any day if it makes or causes noise to be made: 47.2.1 From 10pm to 7am: More than the jower of either — . 40 dB(A) 3 dB(A) above the background noise level 47.2.2 From 7am to 7pm: More than the lower of either — * 50 dBA) ° 5 dB(A) above the background noise level 47.2.3 From 7pm to 10pm: More than 3 dB(A) above the background noise level. 47.2.4 Pool pumps must not be audible at an effected premises between 10pm-7am Page 8 of 14
Page 36
2008/1867 47.3 Submission of written certification from a suitably qualified person confirming that the noise levels comply when measured at either the residential boundary or outside the most exposed part of an affected building, whichever is the closest to the equipment. This is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council. This assessment must take into account noise from all fixed equipment on the property e.g. swimming pool pump, heating equipment, that may increase the overail noise level emitted. Note: it is recommended that the consultant that will be engaged to certify the noise levels of mechanical equipment is asked to comment on the position and installation of equipment at the plan design stage, this is way noise problems can be > minimized 0 or avoided cost t effectively. The referral agencies applicable to this eeptaton are: | Referral ‘Trigger Referral Status. Referral al Agency Referral Address [6 APPROVED PLANS/DOCUMENTS The approved plans and / or documents for this s development approval are listed in the following table: [ Pian / Document No. Rev Pian] Document Name * West — Andrew _ DA-DOS ! Ground Floor Pi Architecture . “DADO4 ee Ground Floor Plan East — Andrew Bock | 17 October 2008 | i Architecture | DA-DOS Floor Pian Level 1 - Andrew Bock | 17 October 2008 | | Architecture bee eee a we a ee sa a ee ' DA-DO6 Floor Plan Level 2 - Andrew Bock | 17 October 2008 i ' | Architecture i ee whe Figen wes soon gu ceegve es sevefe ge meieeeceey tie vgegsig gteeas essed : DA-DO7 Roof Plan ~ Andrew Bock Architecture: 17 October 2008 i b. we | i En nnce sages “| | DA-E.01 i | North Elevation — Andrew Bock | 17 October 2008 i ! Architecture i > DA-E.02 | South Elevation “-~ Andrew ck | 17 October 2008 : Architecture : DA-E.03 East” Elevation — Andrew Bock | 17 Ociober 2008! : Architecture ‘ : | DA-E.04 West Elevation -— Andrew Bock | 17 October 2008 i i Architecture | } . 7 co es | : DAF.O1 A A-Section 01 —- Andrew Bock | 28 January 2009 i ‘ Architecture . ‘ | -Section 02 — Andrew Bock Architecture | 28 January 2000 ' !2Section 03 — Andrew Bock Architecture '-Section 04 — Andrew Bock Architecture 28 January 2009 1 Section 08 - - Andrew W Bock Architecture | | 28 January 2008 — Page 9 of 14
Page 37
2008/1867 - DA-Z.03° ; “| View from South East — Andrew Bock 147 October 2008.” i Architecture : PDA-Z.04 “1p Wiew from South West 2 — Andrew Bock [47 October 2008 ~~ : i Architecture i i [7 ADVISORY NOTES TES sine - | The following Advisory Notes are for information purposes only and do not form conditions of approval: 1. The applicant is advised that development contributions and infrastructure charges applicable to this development approval have been based on the following Uses Class/ Uses and applicable quantities:- Multiple Housing - Detached House 1 Dwelling Type 2 ~ Duplex 2.x 3 Bedroom Units 2, The development should be undertaken in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air- borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No. 12 — Control of Nuisances. 3. In accordance with the Environmental Protection (Water) Policy 1997, ail sand, silt, mud, paint, cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. 4. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1994 Act if the cost of operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Bullding and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site. » §. The applicant is informed that approval of this development application will trigger an Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount of $1,102 and is subject to variations in the Consumer Price Index, All Groups Brisbane from December 2008 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act 1997. 6. The applicant is Informed that payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit or for infrastructure charge notices issued separately. 7. The applicant is advised that a Compliance Permit for ail plumbing and drainage works within the boundaries of the development site shall be obtained from Council's Plumbing Services Section prior to obtaining a Development Permit for Building Works. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). Page 10 of 14
Page 38
2008/1867
The ACH Act establishes a cultural heritage duty of care which provides that: "A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage’. \t is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
le PROP
PROPERTY NOTES —
Not applicable
ecco tnnee renee em ve neem anon semen cevertveninrensnaty
[9 PRELIMINARY APPROVAL OVERRIDING SCHEME = |
Not applicable
Pen anne ec sonny
[10 "FURTHER DEVELOPMENT PERMITS REQUIRED
pe of of Development Permit required. | Subject. of the required D Development Permit ~
| Development Permit for Building Works ‘All Building Works
| | Development Permit for Operational i Landscaping, Carparking and Access, Frontage |
| Works | Works, Stormwater Drainage, Erosion & Sediment |
| / | Control & Filling of the Site
144 “SELF ASSESSABLE CODES ~ |
Not applicable
ty ‘
tenn ncsetraremnane cevorraemietene ami
Not applicable
PPROVAL DESPITE CONFLICT WITH SCHEME |
*
RIGHTS OF APPEAL
[RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. if Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice"
may be given, Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the integrated Planning Act 1997)
a
Please note that an Infrastructure Charge i in accordance with the Coastal “Major | Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council's decision electronic copies are available
on line at www.sunshinecoast.ald.goy.au, or at Council Offices.
Page 11 of 14
Page 39
2008/1867 Yours faithfully, Chore Tracy Jones s E. JOR PLANNING OFFICE! R Page 12 of 14
Page 40
2008/1867
Sunshine Coast
| Appeal Rights uo
1
|
Regional Council | INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
i
The following is an extract from the Integrated
Flanning Act (Chapter 4).
Division 8 - Appeals to court relating to
development applications
Appeats by applicants
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
Including any condition applying to the
development, and the identification of a code
under section 3.1.6;"
(c) the decision to give a preliminary approval when a
development permit was applied for;
(d) the length of a relevant period;
(e) a deemed refusal.
(2) An appeal under subsection (1)(a) to (d) must
be started within 20 business days (the “applicant's
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant.
(3) An appeal under subsection (1)(e) may be
starled at any time after the last day a decision on the
matter should have been made.
Appeais by submitters
4.1.28.1) A submitter for a development application
may appeal to the court about-
(a) the giving of a development approval, including
any conditions (or lack of conditions) or other
provisions of the approval; or
(b} the length of a relevant period for the approval.
{2) The appeal must be started within 20 business.
- days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is
given to the submitter.
{3) If a person withdraws a submission before the
application Is decided, the person may not appeal the
decision.
(4) If an application involves both impact
assessment and code assessment, appeal rights for
submitiers are avallabla only for the part of tha
application involving impact assessment.
(6) If an application is processed under section
6.1,28{2), appeal rights for submitters for the
application are available only for the aspects of ihe
development that would have required public
notification under the repealed Act.
" Section 3.1.6 (Preliminary approval may override ,
locat planning instrument)
(8) If an application involves assessment agalnst a
concurrence agency code, appeal rights for submitters |
for the application are not available against the part of
the approval that represents the concurrence agency's
response for the code.
Appeals by advice agency submitters
4.1.29.(4) An advice agency may, within the Ilmits of
its jurisdiction, appeal to the court about the giving of a
development approval for a development application
if- .
(a) the development application involves impact
assessment, and
(b) the advice agency told the applicant and the
assessment manager to treat its response to the
application as a submission for an appeal.
(2) The appeal must be started within 20 business
days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
submitter.
Appeals for matters arising after approval given
(co-respondents)
4.1.30.(1) For a development approval given for a
development application, a person to whom any of the
following notices have been given may appeal to the
court against the decision in the notice-
{a) a notice giving a decision on a request for
extension of the relevant period for an approval;
(b) a notice giving a decision on a request to make a
minor change to an approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given to
the person.
(3) Subsection (1)(a) does not apply if the
approval resulted from a development’ application
{superseded planning scheme) that was assessed as
if it were an application under a superseded planning
scheme. :
{4) Also, a person who has made a request
mentioned In subsection (1) may appeal to the court
against a deemed refusal of the request.
(5) An appeal under subsection (4) may be started
at any tlme after the last day the decision on the
matter should have been made.
Divisfon 9 - Appeats to court about other matters
Appeals for matters arising after approval given
(no co-respondents)
4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
Page 13 of 14
Page 41
2008/1867
(b) a notice under section 6.1.44* giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20
business days after the day the notice of the decision
is given to the person.
(3) Also, a person who has made a@ request
mentioned in subsection (1)(a) may appeal to the.
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
{a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person. .
(3) An sppeal under subsection (1)(b) may be
started at any time after the tast day a decision on the
matter should have been mace.
Appeals against local laws .
4.1,33B,(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises or
the erection of a building or other structure permitted
by the planning scheme may appeal to the court
against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision Is given to the
applicant.
For Building Works Only
Rights of appeal conferred by Section 4.2.9 of the
Integrated Planning Act 1997 as follows:
Division 3 ~ Appeals to tribunals relating to
davelopment applications
Appeals by applicants
4.2.9(4) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
. application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;°
(c) the decision to give a preliminary approval when a
development permit was applied for;
? Section 6.1.44 (Conditions may be changed or
cancelied by assessment manager or concurrence
agency in certain circumstances)
* Section 3.1.6 (Preliminary approval may override
local planning instrument)
(d) the length of a period mentioned in section 3.5.21
relevant period; ©
{e) a deemed refusal.
(2) An appeal under subsection (1)(a) to (dj must
be started within 20 business days (the “applicant's
appeal pertod”) after the day the decision notice or
negotiated decision notice is given to the applicant.
(3) An appeal under subsection (1)(e) may be
started at any time afler the last day a decision on the
matter should have been made.
The Registrar for the Building and Development
Tribunal may be contacted at the website
http:/www.localgovernment.gid.gov.au/
For Infrastructure Charges Only
4.1.36 Appeals about particular infrastructure
charges .
(4) This section applies to a person who has been
given, and Js dissatisfied with, an infrastructure
charges notice or a regulated State infrastructure
charges notice.
(2) The person may appeal fo the court against the
notice,
(3) The appeal must be started within 20 business
days after-
(a) ifthe notice Is given because of a development
approval or master plan approval-the day the
applicant is given notice of the decision about the
€approval; or
(b) otherwise-the day the notice is given to the
person.
(4) An appeal under this section may only be about-
(a) whether a charge in the notice is so
unreasonable that no reasonable retevant focal
government, State infrastructure provider or
coordinating agency could have imposed it; or
(b) an error in the calculation of the charge.
(8) Toremove any doubt, it is declared that an
appeal under this section can not be about the
methodology used to establish the charge In the
relevant infrastructure charges schedule or regulated
State infrastructure charges schedule.
>
Page 14 of 14
Page 42
Gl & 8 G2 ote tw oo Mm Oo Eo eee ee lL hl a =D oo 4 i Tewantin Office, 9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565 sunshine Coast | Ponca ses s200 PO Box 141 Tevan Regional Council -ABN 37876 973 913 INFRASTRUCTURE CHARGE NOTICE ° Chantay Too Pty Ltd CARE Martoo Consulting Pty Ltd PO Box 1684 NOOSA HEADS QLD 4567 ce: Chantay Too Pty Ltd Date of Issue: 25/03/2009 PO Box 4185 . Charge Notice No: 1C0000842 Rev No: 0 ASHMORE QLD 4214 Reference No: 08/1867 (DA) LAND TO WHICH THE INFRASTRUCTURE CHARGE APPLIES: Planning Scheme: The Noosa Plan Property Description: 403 RP 48112 Par Weyba Cty March Property Address: 51 Blanda Street SUNSHINE BEACH QLD 4567 TRUNK INFRASTRUCTURE FOR WHICH THE INFRASTRUCTURE CHARGE NOTICE APPLIES: INFRASTRUCTURE CODE Job No : Coastal Major Road Network CMRN 0012014.0267.0834 CHARGE AMOUNT =$1,102.00* NOTE: * THE CHARGE AMOUNT IS SUBJECT TO CHANGES IN THE PRICE INDEX REFER TO LAND DEVELOPMENT SECTION BEFORE MAKING PAYMENT The Infrastructure Charge has been calculated in accordance with the details relevant to the nominated Infrastructure Charges Plan above and is subject to variations in the Consumer Price Index (CPI), All Groups Brisbane from December 2008 until the date of payment. COMPOUND INTEREST AT 11% PER ANNUM WILL BE CHARGED ON ALL OVERDUE CHARGES. DUE DATE FOR PAYMENT: The Infrastructure Charge is payable in accordance with Section 5.1.10 of the Integrated Planning Act 1997 and has reference to: 08/1867 (DA) that has a currency period until 24/03/2013 The above development permit refers to: Material Change of Use The due date for payment is: Prior to Commencement of Use PERSON TO WHOM THE CHARGE MUST BE PAID: . Payment of the Charge must be made payable to Council via the Infrastructure Charges Admin Officer, Land Development Section located on level 2 at the Tewantin Office, telephone (07) 5449 5139. . Q Notice is hereby given that the abovementioned infrastructure charges are levied by the Sunshine Coast Regional Council in compliance with the Integrated Planning Act 1997, Chapter 5, Part 1, and by virtue of the Local Government Act ‘on land described for the period prescribed, and such charges are DUE AND PAYABLE BY THE ABOVE DATE. These charges plus any arrears and interest thereon may be recovered by legal process without further notice if unpaid after the expiration of the DUE DATE John Knaggs . . 7 CHIEF EXECUTIVE OFFICER AMOUNT PAID: DATE: Fomenmecmnnnananna neem ennnne: (cut along dotted line & submit below section with payment)---------------+--------~-- INFRASTRUCTURE CHARGES PAYMENT SLIP Date of Payment: Charge Notice No: IC0000842 Rev No: 0 Payee: Reference No: 08/1867 (DA) Address: Property Description: 403 RP 48112 Par Weyba Cty March Property Address: 51 Elanda Street SUNSHINE BEACH QLD 4567 CODE Job No CMRN 0012014.0267.0834 Charge amount paid = $ Sunshine Coast. Regional Council 9 Pelican Street, Tewantin, PO Box 141, Tewantin, Q4565
Page 43
Sunshine Coast Explanatory Statement For
Regional Council
Infrastructure Charge Notice
PLANNING SCHEME AMENDMENT: COASTAL MAJOR ROAD
NETWORK INFRASTRUTURE CHARGES PLAN (CMRNICP)
The Integrated Planning Act 1997 (IPA) commenced in Morch
1998 and with it come the introduction of Infrastructure
Charges Plons, The Coastal Mojor Road Network Infrastructure
Charges Plan (CMRNICP) wos prepared in accordance with the
requirements of Chapter 5 of IPA,
The CMRNICP underwent public consultation in September and
October 2002 followed by a second review by the Department of
Local Government ond Planning. The Minister for Locof
Government and Planning issued approval of the CMRNICP on 3
Tune 2004 in accordance with conditions dated 18 May 2004,
Council adapted the amendment to the Shire of Noose Planning
Scheme, the Coastal Major Road Network Infrastructure
Charges Plan (CMRNICP) in accordance with the Minister's
conditions of approval as follows:
(i) At the Ordinary Meeting of 10 June 2004, Council
adopted the CMRNICP to epply to exempt and se/f-
assessable development. Public notice of Council's
adoption of the amendment was given on 12 June 2004
(Sunshine Coast Baily), 15 June 2004 (Noosa News) and
18 June 2004 (Government Gazette): and
ti) At the Ordinary Meeting of 14 Octeber 2004, Council °
adopted the balance of the CMRNICP applying to
assessable development. Public notice ef Councif's
adoption of the amendment was given on 22 October
2004, (Noosa News & Government Gazette) and 23
October 2004 (Sunshine Coast Dai ly).
The CMRNICP now applies to all development in the coastal area
’ of the Shire under Chopter 5 ond Section 6.2.5 of IPA (as
amended .by the Integrated Plonning and Other Legislation
Amendment Aet 2003 (IPOLAA 2003) that commenced on 4
October 2004,)
The CMRNICP was adopted on 19 January 2006 ‘as part of The
Noosa Plan - IPA Planning Scheme to include The Noose Plan Use
Classes and Definitions and taking effect on 3 February 2006.
The adopted amendment Specifically involves the introduction of
the Coastal Major Road Network Infrostructure Charges Plon
into the planning scheme.
The adopted omendment results from findings of:
* The Strategic Plan (1997);
* — Tts plonning study component Trensport 4 Road Networking
in Noosa Shire (Beard, Black & Summers 1996); and
« Twe planning studies associated with the Choosing Futures
Process Cost Estimates for Future Road Infrastructure in
the Coastal Area of Noosa Shire (Colloghon. Toth Consulting
Engineers) and Coastol Area Troffic & Transport to 2016
(Beard 2002).
In combination, these documents find that:
* The cost of provision of road infrastructure should be borne
substantially by those making use of and causing the need for
the provision of that infrastructure,
* The read network existing at the benchmark yeor of 1998 was
adequately serving the needs of the existing community. Thot e
network did not need the substantial upgreding onticipated
under the Strategic Plan to cater for the existing community
needs,
"© The need for network upgroding is driven by future growth in
residentiot, educational, recreational ond employment-based
sectors. Consequently, development giving rise to this growth
should fund the mojority of the cost burden,
* It Is not possible to recover the full cost burden from future
development and s significant component of funding needs to
also flow fram the existing community,
An Infrostructure charging regime under the provisions of the IPA
{Chapter 5, Port 1) has been determined to be the appropriate
means of recovering the costs and to ensure the equitoble
distribution of costs between the existing and future populations
and development.
[:2:2 Pune CTLOF THE ANENDNE
The amendment applies to all lond in the coastal area of Noosa
Shire as defined by the localities of: Peregion Beach, Marcus
Beach, Costoways Beach, Sunrise Beach, Sunshine Beach, Nooso
Heads, Noosaville, Tewantin and Doonen {excluding properties In
Doonan and Tewentin that toke access to Cooroy-Noosa Read or
Eumundi Road via Sunrise Road or Tinbeerwoh Rond), refer to Map
1 .
The amendment will have the effect of ensuring thet the road
network in the coastal area of the Shire meets the needs of the.
community. It also results in future development in the coastal
grec of the Shire being required to contribute te the funding
programme,
The Coostl Major Road Network Infrastructure Charges Plan hos
as its benchmark year 1998, with its calculations based on April
thot year. Charges ore subject to variations in the Price Index
from April 1998 to that current gt the time of payment. The
current contributory retes are available from Council's Lond -
Development Section, Tewsntin of fice at Petican Street, Tewantin,
SUNSHINE COAST REGIONAL COUNCIL 9 Pelican Street TEWANTIN (PO Box 141 TEWANTIN 4565)
Ph: 07 5447 5139 . Fox: 07 5447 1062
E-Mail: Jeonne,dowson@sunshinecoos?,gld, Lgov.au
IT gt\land development \icp's \infrostructure charges issued\other docs current! lexplanatory statement « charge notice = rev Bove
mBmDHm@HWwHewkewhkWwe@Qe wee we we we h6hlUra lee lc lee
Page 44
r @ ANDREW BOCK ARCHITECTURE
o
eas
SOFT LANDSCAPING AREA = 396 sqm a
NOTE: LANDSCAPING SUBJECT TO FUTURE DESIGN oan
REV AMENDMENT = | CHKD DATE,
= COAST. |.
aenStinn COUN.
* TetANS APPROVED |-
{ coacor eosmia emt
t
ELANDA STREET
WEW K A.C TO COUNCIL REQUIREMENTS.
PROJECT
DUPLEX 51 ELANDA ST
SUNSHINE BEACH
LENT
Chantay Too Ply. Ltd.
DRAWING TITLE
. 4 Ground Floor Plan West
‘SCALES NORTH
$:100 &%
RN CHXD ‘DATE
we AB 47M008
i
PROJECT NO cwote SSUBREV
10
C) LEVEL 0 PLAN WEST Se 4040 DADOa
4:100
Page 45
ANDREW BOCK ARCHITECTURE NOTE: LANDSCAPING SUBJECT TO FUTURE Posaxtisy sooty, ‘wogSA HEADS. af ous? moern H1884 rocker eptaretconay ARCHAEG Na. 7519 REV, AMENDMENT || GHD DATE, PROJECT DUPLEX 51 ELANDA ST SUNSHINE BEACH ' CLENT Chantay Too Pty, Ltd. DRAW THLE Ground Floor Plan East SCALES: NATH $:100 & ‘ORAWH CAND DATE WB AB 17110108 PROJECT KO OW KO ISSUEREV 1040 DA-D04 e LEVEL 0 PLAN EAST 1:400 ® @
Page 46
meee Fe we Se & & & , ANDREW BOCK ARCHITECTURE ‘con ST UREV AMENDWENT = CHRD. DATE PROJECT DUPLEX 51 ELANDA ST SUNSHINE BEACH q CuENT Chantay Too Ply. Ltd, RAN TIME Floor Plan Level 4 ‘SCALES ORTH 4:100 & DRAWN nD GATE WB AB 17/10/08 ‘ PROJECT NO owa No (ssUEREVY LEVEL 1 PLAN C} #2100
Page 47
ANDREW BOCK ARCHITECTURE icoRoRst @ ear OCH 118688, decaehdopusoatcomay ARCHED Na 2519 REV AMENOMENT | CHK. ATE, PROJECT: DUPLEX 51 ELANDA ST SUNSHINE BEACH CuENT Chantay Too Ply. Ltd. RAWING THLE Floor Plan Level 2 SCALES ORT 1100 & DRAWN cH DATE : LEVEL2 PLAN | “8 Aa $7t0108 O 1:100 FROIEGTNO ew =e 1040 DA-D06 Fea eae Eee ate casera Se , @ cohen TTA
Page 48
ANDREW BOCK ARCHITECTURE antcorona et RINSE REACH 7 9 oe Posen zts1 WOOSAHEADS oer Ott? T0889 SectarrhGoptinet com ARCHED ts 2910 REV AMENDMENT =| CHD DATE, PROJECT DUPLEX 51 ELANDA ST SUNSHINE BEACH CUENT Chantay Too Pty. Ltd, DRAWING TITLE Roof Ptan ‘SCALES HORTH 4:100 & + ‘DRAWN HKD DATE © - ROOF PLAN | we AB. 47/0108 1100 PROJECT HO Dwa ho ISSUEREY
Page 49
ANDREW BOCK ARCHITECTURE
AAECORONA BT
[SURSHOTE BEACH
a a7
OBOE
MOOSAHEADS
Qua?
gata M6654
poctareneptienalconey
ARGHRED Ho. 2519
AS”
. 2. [TSONSHINE COA
REGIONAL COUNC
Loe PLANS APPROY .
PROUECT
DUPLEX 5f ELANDAST
SUNSHINE BEACH
CUENT
rendered blockwork Chantay Too Ply, Ltd.
fibrecement
‘Sun hood ORAWRNG TILE
Ceram{o Te North Elevation
Glass
Powdercoated aluminium acreen
screen
Metal Roof.
Poo! Fence
Metal
SO0L Ratnweter Tank
Paneliit Door
North
C) 1100 | Ec ie rvoxeamemyonen
Seomrgmarermnsas
‘AGENT STTIRENORTA ROCK MCHATETINS HO Ts PADRE PHY.
RESID RAS ea a Ca TET
Page 50
meee Oe UmhlCU ECU Ce aia ee eo ho oes ae ANDREW BOCK ARCHITECTURE DUPLEX 51 ELANDA ST SUNSHINE BEACH CUENT =55) Chantay Too Pty. Ltd, THLE MATERIALS LEGEND Painted rendered biookwork PRC Painted florecoment sheoting SH Sun hood ct Ceramic Tite Giase Halustrading Powdercoated alumintum ecreen au] Timber screen Motal Reof Sheeting ‘oP Downpipe GPF Giass Pool Fence Meta! Awning wT 300L Retnwater Tank IGPD- Coforbond™ Paneitft Door South Elevation ‘SCALEB NORTH 4100 & DRAMA cH CATE, WB AB 170/08 $ PROAETHO WG NO TSSUBREV 1040 DA-E,02 ‘ye Pememoeeenrne BEPREPERBET TRAD CHEE RA OESORY ETT DELLA PeCTOCRyvPeS RENT DE PICTON ERMESSEN OF ORE Fyooed waroeven a ReStecTeDT1DE [OG GF TA NCRIDATON CED + | Remmortermrrousonnr scr crested Bo Pw ASC AST TTR Rn AUER
Page 51
ANDREW BOCK ARCHITECTURE DISCOROHAST ‘SUNSHINE BEACH o mT POBox2ise soosattaans one mova Tenet Fesrrersety MATERIALS LEGEND PRB Painted PFC Painted fibrecement heating SH [Sun hood REV AMENDHENT = HKD. DATE, er ci Tie jas Gian PAS. aluminium soreen TS Timber screen MRS Mats! Roof Sheeting oP Dow GPF Glass Pool Fence MA Metal Awning We S001, Tank CPD Colorbond™ Panelift Door PROJECT DUPLEX 51 ELANDAST SUNSHINE BEACH CUENT Chantay Too Ply. Lid, DRAWING TITLE O- East East Elevation SCALES WORTH 4100 & + DRAMA Cry ATE WB Ag THO/08 PROVECTHO NO TSSUBREV 1040 DA-E.03 @ @ DONOR enter ASA TA nBRHmHHmHHmHHe nHHH He HF wee a a
Page 52
MATERIALS LEGEND: PRB Painted rentiored blockwork PFC Painted fibrecement sheeting SH Sun hood ict Ceramic Tie eB Glass ig PAS Powdercoated aluminium screen TS Timber soreen MAS: Metal Roof Shesting oF Downpipe GPF Glass Pool Fence MA Metal Avening Wr 3001, Rainwater Tank CPD Colorbond™ Panelift Door West 4:100 ANDREW BOCK ARCHITECTURE 274 poROMA BY SUNOOE BEAD <a ee posox2s7 ROOSAHEADS Oe? mba S008 ARCH RED Ho, 2513, PROJECT DUPLEX 51 ELANDAST SUNSHINE BEACH ‘CUENT Chantay Too Pty. Ltd, DRAWING TITLE West Elevation ‘SCALES NORTH 1:100 & oR HKD ONE 170/08
Page 53
t = =
pool fer & purnp
garage
Section 01°
ANDREW BOCK ARCHITECTURE
ait cononast
0, AMENDMENT, CKO DATE:
loxa “counci.ers as arm
PROJECT
DUPLEX 51 ELANDA ST
SUNSHINE BEACH
CUENT
Chantay Too Ply. Ltd.
a DRAWING TILE
A A-Section 04
|
‘SCALES Tort
5 ices ee “f 4100 &
| pool Ber & pump. :
| a garage DRAWN CHK DATE
WB AB 28/0109
= ee EL | j
YES Sy y SSAvy oy ROIS SoS SS SSS PROJECT NO ‘BaoNO ISSUEREY
Section 01 Se ae ee oaenenmenen
1100 Scion nonaarnch onto wen eoonione anon
*
mas
Page 54
meee eee le le Oe OlClClemlCU Ce le CeCe
Q ANDREW BOCK ARCHITECTURE
2yA cone sT
SURSHNE BEKDH
@ ast
eo sc7E?
Woosh HERDS.
, “i OS
Nate er on
C) POO
PROJECT
DUPLEX 51 ELANDA ST
SUNSHINE BEACH
cuENT
Chanlay Too Pty. Ltd.
DRAWING TITLE
-Sectlon 02
‘SCALES woRTH
1100 ©
Page 55
ANDREW BOCK ARCHITECTURE CORO zm . * 5 - * : oe a “Uo $ $7,980 . a, es stair oe Lt . £00. 7 7 — a 4 ’ . . - $4200 _ — ~ I. fe can : : el. 84,300 0 . ‘ . . : 2 . nm : . . . _ $ 81,200 oe pe a _ —y- : = - 2,21 1 - : tee et = a j—- : = — ry He ° 7 Caer a VT: | oo “| Provect OUPLEX 51 ELANDA ST SUNSHINE BEACH f GtENT HE SY Yj Chantay Too Pty. Ltd, QO Section 03 | samen 4:100 Section 03 ‘SCALES. NORTH 100 & ona xD DATE WB AB 28/01/09 t @ @ TTT reload OL WS OTRO . mmm HE HE HF HF FF Se Se eo ee
Page 56
co CS Co Co Oo owe eee eel lull lu) 6 lhlvlmldlhCUlmeelhUumumhlm)lhlUumc me le Oo Oo ANDREW BOCK ARCHITECTURE PROUECT DUPLEX 51 ELANDA ST SUNSHINE BEACH ENT O Section 04 — | chantay Too Py. Lid. 100 DRAWING TITLE . : Section 04 ‘SCALES WORTH 4100 &
Page 57
ANDREW BOCK ARCHITECTURE
2na COROMA ST
@ an
ID. «= AMENDMENT. == CHKD DATE
RL 451,300 -— ee
evel
OC Section 05 |
1:
"00 DUPLEX 51 ELANDA ST
SUNSHINE BEACH
CuENT
Chantay Too Pty. Ltd,
DRAWING TE
Section 05
SCALES — NORTH
4:100 &
* ORAWN HKD OATE
WB AB 28/01/09
+
PROJECT HO TWONG (GBVEREV
1040 DA-F.05
empRenmparemrmacr nein oun moanect en
‘AACA ACEO G METRE TO STN Yok AMEN OR ED
SGORoA eres PONE a CETTE Ap Me MIRED AT
@ @ ASTRA Aercirie fore GOA SOTA
4
Page 58
} @ : ANDREW BOCK ARCHITECTURE 3 ma coRoA st GuMENE BEACH 2 a Get Poroxart WOOSA HES O45iT meta ster ‘ARCHED ho 289 DUPLEX 51 ELANDA ST SUNSHINE BEACH CUuENT Chantay Too Pty. Ltd. ‘DRAWING TITLE View from South East SCALES. WORTH 1:100 & ‘ORAWN cHKO OATE WB AB 170108 PROJEGTNO a RG ISSUBREV 1040 DA-Z.03 PRETO Mercier DS OLE MORIA
Page 59
ANDREW BOCK ARCHITECTURE
‘M4 OORORAST
NSHINE COAST
++ | pBaiGwar COUNCIL
. . | pLANs APPROVED
PROJECT
OUPLEX 51 ELANDA ST
SUNSHINE BEACH
CUENT
Chantay Too Ply. Ltd.
ORAWING TITLE:
View from South West 2
SCALES: NORTH
190.91 &%
‘DRAWN HKD OATE
WB AB 4740/08
Page 60
“ ~~>E LI e} RL 49.72 @ ANDREW BOCK ARCHITECTURE v 2M CORPAST %, eS b, PORK ITT . fF SOONERS aoe tees 2 OMS He 8 es re OD re a se DUTLINE OF PROPOSED AMENDMENT. CHD DATE z BUILDING ° : g| Be Re FENC = m, te 9 \n sezet TIMBER FENCE = % mn a7 is4 f z at ig Ay b> 19%, 2 4 TNS fr a Slo igo \2 “4 fr rc Gn, | rege AB A a a 5 fe » fa D> Me yi a ay NOE Sat fo] je g Zz | %, ©. STEPS = 1 = = BIN Soy aed. Cle ~ a B <= te , a ; s 8 1 et \ 3 Lanny ‘ = 2g Fy ' : & Hrs, < \ wiguseT BLOCK EF! LL Zp a n 4 ts FL UP Sol \ "Oxy “Be fA 2 4 Rey ¢ ie L- oe pn 47.7 A PRON \ P-. 5 z Pe \ F NOT SU —_ $ & 3 ote 8 YN cone | ---44 2 2 =a V'DAH | He 3 G, \ = j oes a s/s 5 sy Pe, ——— | y Az ‘ i" > = a %, =) Res con GARAGE iy = f 3 @ rage fe » SHRUB PNG Shp 5 NDI cl r-tf} & .! 3 > 499 Hee FE 4 a + Ope Qn NCI M | ON Boek WALL LATTICE ow BLOCK Ware GATE na S85 —— eo p TSE ER athy CE OF BLO ey ay wan ey, ? a f % ae PROECT ~ . 4f150 x * Ot, DUPLEX 51 ELANDA ST EXISTING CONC BLK Me Re, VAP Bo, SUNSHINE BEACH we EXISTING = “SN, Cs ial ‘xIS IMBER FENCE & >| Chantay Too Ply. Lid, ly, zg ORAWING TITLE . 7 fe, Og EXISTING Survey Plan with Outline of Proposed Bufiding %G, BUILDING Me « 8 SNES ‘WORTH ns 1% Al ime Q * & ss / DRAW oO ATE WB 8 28/01/09 2 ho PROJECT HO DWGNO ISSUGIREY i
Page 61
Knobel Consulting Pty Ltd Stormwater Management Plan Proposed Residential Duplex Lot 403 RP48112 - 51 Elanda Street Sunshine Beach for Steve Rackemann Project No: K1595-0006 5 June 2009 PO Box 3892 Burleigh Town Centre BURLEIGH HEADS QLD 4220 T: 07 5576 4168 F: 07 5576 6477 _—_ E: [email protected]
Page 62
Knobel Consulting Pty Ltd Document Control Sheet Knobel Consulting Pty Ltd Suite 6 - 109 West Burleigh Road BURLEIGH HEADS QLD 4220 PO BOX 3892 Burleigh Town Centre BURLEIGH HEADS QLD 4220 T: (07) 5576 4168 F: (07) 5576 6477 E: [email protected] Document No: K1595-0006 Original Date of Issue: 5 June 2009 Project Manager: Trent Purdon Title: Stormwater Management Plan Author: Trent Purdon Client: Steve Rackemann Client Contact: Neil Stebbing Client Reference: | 5) Elanda Street, Sunshine Beach Synopsis: This Stormwater Management Plan describes the existing — site characteristics, proposed development of the site and corresponding stormwater quantity controls to be implemented during operational phases of the development to ensure no increase in peak discharge. Revision/Checking History Revision No Date Checked By Issued By Original 05/06/09 Matt Godwin Trent Purdon Distribution Recipient No of Copies Method Sunshine Coast Regional Council 3 Post Neil Stebbing ] Post Steve Rackemann ] Post K1595-0006 5 June 2009 Page lof il
Page 63
STEVE RACKEMANN KNOBEL CONSULTING PTY LTD Proposed Duplex Stormwater Management Plan Lot 403 RP48112 - 51 Elanda Street Project No: K1595 Sunshine Beach Contents 1.0 Introduction | Background . | 1.2 SCOPE iecccrrsesrrereees ] 1.3 Description of Subject Site. ] 1.3.1 LOCATHON wee } 1,32 Site Topography....... 2 1.3.3 Vegetation and Land Use. 2 1.4 Description of Development . 3 2.0 Site Hydrology and Hydraulics.. 3 2.1 BACKQFOUN woes 3 2.2 Catchment Definition we 2.3 Rational Method wd 2.3.1 Coefficient of Runoff. 4 3.0 Sediment and Erosion Control 5 3.1 Construction Phase... 5 3.1.1 Key Pollutants.. 6 3.1.2 Performance Criteria .. 6 3.1.3 Sediment and Erosion Controls... are} 3.1.4 Water Quality Monitoring and inspections. 7 3.1.5 Reporting. 7 4.0 Conclusions .. 8 §.0 References.... 8 Figures Figure 1: Google Cadastral Extract Figure 2: Aerial Photograph of the site (Google Earth).... Tables Table 1: Post Development Design Flow Rate for Site Catchment... Table 2: Key Pollutants, COnstructlon PASC... Table 3: Construction Phase, Water Quality Performance Criteria... Appendices Appendix A- Donald James Colston, Contour & Detail Survey Over Lot 403 on RP48112 at 51 Elanda Street, Sunshine Beach (Ref: 22046-1C) Appendix B- Andrew Bock Architecture, Site Plan (Ref: 1040-1-A) Appendix C - Knobel Consulting Pty Ltd, Pre and Post Development Impervious Area Layout Plan (Ref: K1595/SW002/A) Appendix D - Knobel Consulting Pty Lid, Stormwater Layout Plan (Ref: K1595/SW001/A) Appendix E- Knobel Consulting Pty Ltd, Sediment and Erosion Control Layout Plan & Details Sheet Ref: K1695/SEOO1/A) K1595-0006 5 June 2009 Page ii of li
Page 64
STEVE RACKEMANN KNOBEL CONSULTING PTY LTD Proposed Duplex Stormwater Management Plan Lot 403 RP48112 - 51 Elanda Street Project No: K1595 Sunshine Beach 1.0 Introduction 1.1 1.2 1.3 1.3.7 Background Knobel Consulting Pty Ltd has been commissioned by Neil Stebbing & Associates Pty Ltd to prepare a Stormwater Management Plan (SWMP) for a proposed residential duplex on Lot 403 RP48112, 51 Elanda Street, Sunshine Beach (the subject site). In preparing the SWMP Knobel Consulting Pty Ltd has considered stormwater quantity management during the operational phase to ensure no net increase in runoff from the site and sediment and erosion controls during the construction phase. This report has been produced to address conditions 25, 26, 37 and 39 of Council’s Material Change of Use approval for the site dated 24 March 2009. Scope This SWMP aims to: « — Establish the required performance criteria for the proposed stormwater quantity system; » Provide detailed design of stormwater infrastructure within the site; = Ensure stormwater runoff Is conveyed from/through the site to a legal point of discharge without adversely affecting both upstream and downstream flood levels; * Provide detailed design and calculations to determine if detention is required to mitigate post development flows, and » — Ensure the quality of stormwater runoff discharging from the site during the construction phase does not adversely impact on water quality and ecological values of downstream watercourses. This SWMP is in accordance with the IEAust, (National Committee on Water Engineering). Australian Runoff Quality (Draft) and the Queensland Urban Drainage Manual (QUDM). Description of Subject Site Location Figure 1 shows the subject site that is located at 51 Elanda Street, Sunshine Beach. The subject site covers an area of 755 m2. K1595-0006 5 June 2009 Page 1 of 8
Page 65
STEVE RACKEMANN KNOBEL CONSULTING PTY LTD Proposed Duplex Stormwater Management Plan Lot 403 RP48112 - 51 Elanda Street Project No: K1595 Sunshine Beach Figure 1: Google Cadastral Extract 1.3.2 Site Topography The subject site falls steeply away from Elanda Street as is shown on the Donald James Colston, Contour & Detail Survey Over Lot 406 on RP48112 at 51 Elanda Street, Sunshine Beach (Ref: 22046- 1C€) Included as Appendix A. 1.3.3 Vegetation and Land Use Site inspection confirms that a residential dwelling and associated hardstand currently exists on the site. An aerial photograph showing the current dwelling is provided in figure 2 below. K1595-0006 5 June 2009 Page 2 of 8
Page 66
STEVE RACKEMANN KNOBEL CONSULTING PTY LTD
Proposed Duplex Stormwater Management Plan
Lot 403 RP48112 - 51 Elanda Street Project No: K1595
Sunshine Beach
; Pet ta
» |. y pte —
OO Tae CEE als cara FERETIE)
Ge °
ae,
pa A sce a ee ThE es,
Brroneh rss rh yok yd PS eel re Eee kt
Figure 2: _—_ Aerial Photograph of the site (Google Earth)
1.4 Description of Development
With reference to the Andrew Bock Architecture, Site Plan (Ref; 1040-1-A) included as Appendix B,
a duplex is proposed to be built on the subject site.
2.0 Site Hydrology and Hydraulics
2.1. Background
The proposed duplex is to be constructed in place of existing residential dwelling.
K1595-0006 5 June 2009 Page 3 of 8
Page 67
STEVE RACKEMANN KNOBEL CONSULTING PTY LTD Proposed Duplex Stormwater Management Pian Lot 403 RP48112 - 51 Elanda Street Project No: K1595 Sunshine Beach Legal Point of Discharge It is proposed to discharge piped stormwater drainage from the site to the existing field inlet located within the pathway to the south east of the site. Overland flows will continue to discharge as sheet flow to the rear of the property, 2.2 Catchment Definition The subject site has one (1) catchment area corresponding to the site area, Stormwater runoff from properties to the North currently discharge to the rear of those sites. Any flows that discharged onto the subject property will continue to do so with the addition of the new development as construction is offset from the boundary atlowing flows to enter the subject site unimpeded. The Internal catchment covers 755 m? and to provide accurate pre and post runoff flows the fraction impervious of the existing case and that of the proposed duplex have been calculated. 2.3 Rational Method 2.3.1 Coefficient of Runoff A coefficient of runoff (Cyear) was calculated for the associated catchments based on an analysis of the land and the fraction impervious of the existing and proposed arrangements. Pre Development Impervious Area - 326m? (From survey) Fraction Impervious = 43.0% C10 = 0.79 (QUDM 2007 Table 4.05.3(a)) Post Development Impervious Area - 393m2 (From Design) Fraction Impervious = 52.0% C10 = 0.80 (QUDM 2007 Table 4.05.3(a)) The pre and post development impervious areas are shown on Knobel Consulting Pty Ltd drawing, Pre and Post Development Impervious Area Layout Plan (Ref: K1595/SWO002/A) included as Appendix C. K1595-0006 5 June 2009 Page 4of8
Page 68
STEVE RACKEMANN KNOBEL CONSULTING PTY LTD Proposed Duplex Stormwater Management Pian Lot 403 RP48112 - 51 Elanda Street Project No: K1595 Sunshine Beach 3.0 Time of Concentration A minimum time of concentration of 5 minutes has been adopted for the pre and post development scenarios. Rainfall intensities were obtained from Council Standard Drawings 9231. Design Flow Rates Design storm flow rates have been calculated for storms with an ARI of 10 and 100-year intervals and are provided in Table 1. The Rational Method provides a basis for assessing the design peak flow rate to enable the determination of the sizes for inlets, pipes and culverts and the dimensions of open channels. The Rational Method (Q = 2.78 x 10-3 CIA) has been used to calculate the required design flow rates for the subject site. Table 1: Post Development Design Flow Rate for Site Catchment Average Recurrence Interval ARI | Pre@io |, Post@io | Pre Qioo | Post Qico ” CoefficientRunoff SSCS Cc ove | 080 0.95 0.96 Area of Catchment (ha) . "as A 0.0755 0.0755 0.0755 0.0755 “Average Rainfall Intensity (mm/h) ! 225.0 225.0 320.0 320.0 Peak Flow Rate (L/s) a 37.3 378 63.8 64.4 Table | shows that the post development flow rate is approximately equal to the pre development flow rate. It is not considered necessary to provide detention given the minimal difference in flow rates, As there will not be any increase in flows to the existing stormwater system and further analysis is not required, Knobel Consulting Pty Ltd drawing, Stormwater Layout Plan (Ref: K1595/SW001/A) included as Appendix D shows the proposed internal stormwater drainage layout and proposed connection to Council's system. The internal works have been designed by Dennis Cairns and Associates Hydraulic Consultants. Sediment and Erosion Control 3.1. Construction Phase Details of the construction phase sediment and erosion controls, monitoring and maintenance are provided in the following sections. K1595-0006 § June 2009 Page 5S of 8
Page 69
f STEVE RACKEMANN. KNOBEL CONSULTING PTY LID Proposed Duplex Stormwater Management Plan B Lot 403 RP48112 - 51 Elanda Street . Project No: K1595 Sunshine Beach n 3.1.1 Key Pollutants ™ In accordance with Table 13.1.C (GCCC Draft WSUD Guidelines, 2007) the following key pollutants = have been identified for the Construction Phase of this development. Table 2: Key Pollutants, Construction Phase ‘Pollutant « Sources a | : ” Litter Paper, construction packaging, food packaging, cement bags, vs material off cuts. Sediment Exposed soils and stockpiles during earthworks and building works, Hydrocarbons Fuel and oil spills, leaks from construction equipment and temporary ra car park areas. . . Cement slurry, asphait primer, solvents, cleaning agents, and wash = Toxic Materials waters (eg, from tile works). Acids or Alkaline . . substances Acid sulphate soils, cement slurry and wash waters. 3.1.2 Performance Criteria In accordance with Table 13.1.A (GCCC Draft WSUD Guidelines, 2007) the following site discharge pollutant criteria have been identified during the construction phase of the development. Table 3: Construction Phase, Water Quality Performance Criteria Pollutant Ciiteia Total Suspended Solids 90th Sile <5Omg/L pH 6.5 -9.0 Dissolved Oxygen 90" %ile >80% saturation or 6mg/L Hydrocarbons No visible sheen on receiving waters litter No visible litter washed from site, Cations and Anions np cable to Development, Sulphate Soll Management Plan (If 3.1.3 Sediment and Erosion Controls Sediment and erosion control devices G&EC) employed on the site shall be designed and constructed in accordance with the Institution of Engineers, Soi Erosion and Sediment Control Guidelines (IESESC) as shown on Knobel Consulting Pty Ltd drawing, Sediment and Erosion Control Layout Plan & Details Sheet (Ref: K1595/SE001/A) included as Appendix E. During construction, all areas of exposed soils allowing dust generation are to be suitably treated. Treatments will include covering the soil and watering. Road accesses are to be regularly cleaned to prevent the transmission of soil on vehicle wheels and eliminate any build up of typical road dirt and tyre dusts from delivery vehicles. co co OoOlLUrllhlUmelhlUn eC Cue ee le) lai K1595-0006 § June 2009 Page 6 of & a)
Page 70
Ho OO | oe! CU hUolCUc)lCUclClcl Ucn) ow 0 O STEVE RACKEMANN KNOBEL CONSULTING PTY LID Proposed Duplex Stormwater Management Plan Lot 403 RP48112 - §1 Elanda Street Project No: K1595 Sunshine Beach 3.1.5 Adequate waste disposal facilities are to be provided and maintained on the site to cater for all waste materials such as litter hydrocarbons, toxic materials, acids or alkaline substances. Water Quality Monitoring and Inspections To ensure that the water quality objectives are being met during the construction phase of the development water quality monitoring shall be conducted at a monitoring station as shown on Knobel Consulting Pty Ltd drawing. Sediment and Erosion Control Layout Plan & Details Sheet (Ref: K1595/SE001/A). Water quality monitoring shall use a calibrated probe or sampling and testing at a NATA registered laboratory. Location: Monitoring Station MS1 is shown on Knobel Consulting Pty Ltd drawing, Sediment and Erosion Control Layout Plan & Details Sheet (Ref: K1570/SE001/A). Parameters: Site discharge criteria. Frequency: Following at least 30 mm of rainfall in a 24 hour period. The contractor shall be responsible for the inspection and maintenance of all sediment and erosion control devices. Additional controls and review of existing controls shall be undertaken in response to the results of the above-mentioned monitoring program, Reporting An inspection report shall be written by a suitably qualified and experienced scientist/engineer following each water quality monitoring episode. The report shall include at least the following information. = Name, address and real property description for the development site; = Council file reference number (if known); * Monitoring locations; «Performance criteria; « — Results for each monitoring location, identifying any breaches of performance criteria, and » Recommended corrective actions to be taken and additional sediment and erosion controls, if required. Inspection reports shall be provided to the contractor for their action and compilation in an on-site register. If the above-mentioned performance criteria are exceeded and results from the downstream monitoring stations show significant deterioration from upstream results Gf applicable), the contractor shall implement all recommendation of the inspection report within one (1) working day of receipt of the report. K1595-0006 § June 2009 Page 7 of 8
Page 71
STEVE RACKEMANN KNOBEL CONSULTING PTY LID Proposed Duplex Stormwater Management Plan Lot 403 RP48112 ~- 51 Elanda Street Project No: K1595 Sunshine Beach 4.0 Conclusions Knobel Consulting Pty Ltd has analysed the pre and post development stormwater discharge from the site and determined that no detention is required as the proposed development does not increase peak flow rate from that of the pre development scenario. The legal point of discharge for the site shall be to the existing field inlet to the south east of the site with overland flows continuing to discharge as sheet flow to the rear of the site. Sediment and Erosion Control measures have been proposed for the construction phase to ensure no adverse impacts on downstream water quality. 5.0 References * — Australian Rainfall and Runoff (ARR) - Volume 1 Book 2 - Design Rainfall Considerations = Queensland Urban Drainage Manual (QUDM) - 1992 K1595-0006 5 June 2009 Page 8 of 8
Page 72
STEVE RACKEMANN Proposed Duplex Lot 403 RP48112 - 51 Elanda Street Sunshine Beach KNOBEL CONSULTING PTY LTD Stormwater Management Plan Project No: K1595 APPENDIX A Donald James Colston Contour & Detail Survey Over Lot 406 on RP48112 at 51 Elanda Street, Sunshine Beach (Ref: 22046-1C) K1595-0006 5 June 2009 Page fof v
Page 73
yondid yames Lolaton Cadastral Surveyor
Quemsiond 4573
rene (07) 547171
tau Sear 701 368,
‘enol ccoptbigpond.con
’
C\Dwg Standard\colston letterhead top b.jpg
urveyor {certified pract
consutting 61
CONTOUR &
DETAIL SURVEY
over
Lot 406 on RP48112
o
i
§1 ELANDA STREET
SUNSHINE BEACH
: WER,
= a 5 —_ Sey
pot TT at eo ts my
saree ey on
ay
2 ~
ee
‘SAK S2S\Coonttants’Surweyi0e-05-t4iEbanda EXTRA Road Surv Addiad up, ¥06/2000 4:15:06 Ph, tendp, Yenobet¥Od_C4S0_PS
NOSHYZONFH
:
: Bs
g) &e
3 Sei Sw Pr
ria /Hote :
(eee Phy
Page 74
STEVE RACKEMANN Proposed Duplex Lot 403 RP48112 - 51 Elanda Street Sunshine Beach KNOBEL CONSULTING PTY LTD Stormwater Management Plan Project No: K1595 APPENDIX Andrew Bock Architecture Site Plan (Ref: 1040-1-A) K1595-0006 5 June 2009 Page ilofv
Page 75
andr uw Bock Architecture :
Or
2/14 CDRONA ST. SUNSHINE BEACH QLD 4567 AUSTRALIA
M0412 116686 P 6175455 4840 F 6175449 2947
[email protected]
Board of Architects Reg, No. 2519
COPYRIGHT ALL RIGHTS RESERVED, THIS WORK IS
REV] AMENDMENT CHKD [DATE
A
PROJECT
Duplex 51 Elanda St, Sunshine Beac
»
CLIENT
@ i Lazarides
SK.01 Site Plan 1:200
DRAWING TITLE
Site Plan
| SCALES TNORTH
. { 1:200
| DRAWN/CHKD DATE ]
{ WB/AB Shae sday, 8 May
{ PROJECT NUIDWG NO TISSUE/REV
, | 1040 4 A
; EEC? RUPER,RMENSI SNS PREREPERES: ASEAN on
:
i
3
z
a
;
ee 11 FAL NS UncoenHOR. SZ CAD FILEPATH 500GB HDD #1\UserswilllanberryDocumet
DRAWINGS IN PROGRESS | |Beeeeee*
Page 76
STEVE RACKEMANN Proposed Duplex Lot 403 RP48112 - 51 Elanda Street Sunshine Beach KNOBEL CONSULTING PTY LTD Stormwater Management Pian Project No: K1595 APPENDIX Cc Knobel Consulting Pty Ltd Pre and Post Development Impervious Area Layout Plan (Ref: K1595/SW002/A) K1595-0006 5 June 2009 Page iil of v
Page 77
LEGEND PRE DEVELOPMENT IMPERVIOUS AREA - 327m? POST DEVELOPMENT IMPERVIOUS AREA - 393m? ELANDA\STREET / A 206-00 | ISSUED FOR CLUSION IN REPORT GSSUENA} DATE ANENOMEN ZAKLS@S\Constructori WGK 1505-SWO02-A dug, 2006/2009 91074 AM, evan, adobe pt x 2& KNOBEL CONSULTING PTY LTD ENGINEERS - PROJECT MANAGERS Phone: 07 S576 4168 8/109 West Burleigh Road Fex 07 8576477 Burleigh Haads QLD 4220 Email: [email protected] ‘ABN 33 071 435 202 ‘CUENT STEVE RACKEMANN PROJECT PROPOSED DUPLEX 51 ELANDA STREET. SUNSHINE BEACH, QLD 402 IRP48112 } j ; ' ! 404 RP48112 Tme PRE AND POST DEVELOPMENT IMPERVIOUS AREA LAYOUT PLAN SAE 4100aTAl ° 2 4 6 & "9 a 10m 1200 AT AS SS ——— 382 RP48112 000 GTP 689 PROJECT NO. K1595 Dwano, | ISSUE Swo02| A
Page 78
STEVE RACKEMANN Proposed Duplex Lot 403 RP48112 - 51 Elanda Street Sunshine Beach KNOBEL CONSULTING PTY LTD Stormwater Management Pian Project No: K1595 APPENDIX D Knobel Consulting Pty Ltd Stormwater Layout Plan (Ref: K1595/SWO001/A) 1595-0006 5 June 2009 Page lv of v
Page 79
7
ee eee
t
t
= 7
tr
:
‘
402
RP48112 382
CS x RP48112
NY
= {
Rae %
, <o Ta, i q
i@r2s 00 =
147.00 witha i
ot eS l
x we vos P
ws i
OVER
Ut Se ETAL % ayer THANK
RU a . | 5000!
( | —*]
41.48.1795 w.44.700 a
yA 1.48.035° qe
so e. 4.800 4 2
7 44 I
RL.47 100) 2 [tT l
3 [HF
I
. _a et eH
soon 80 PROPOSED se] Boge pyres 148
0? Gant - QUPLEX F ee
108, 1A va | —"| Nin f
i} |S 000
ic7 00 ‘ p—ansifoo | GTP 689
t
” i
%
~ { RL 4B\HO0 ;
Bi A700 some care a Wh sen 5/9 (059 =D a |e | ee
t
i
| RMWATER PIT
0 LA8.97 I 43.96
: 4 1.42.93
oft 1x (103) x L
SDT * a - came
Ge i La —
----f-------' aH — ores ee fe- a -a---- me 109,
T me) 1 1 not ‘ a? TRI se
| i ft 1 ou 4 WANS
aa npen nena ne t---p--~----JL---jr ----f b-day SE Lio? —
. Saigo, Ws
\ CONNECT TO EXISTING _// STORMWATER MH SSeS
COUNCIL PIT AND MAKE 8.43.63 SA Pon
; GOOD CONNECTION Lazio / BL,
~ NON. ~
| EXISTING 300 PIPE sag esd
sO
we
CONTINUES TO HENDERSON ~~,
404 STREET PIPE SYSTEM.
RP48112
INTERNAL STORMWATER DESIGN :
BY DENNIS CAIRNS & ASSOCIATES ‘
" CUENT DESIGN DRAWN [APPROVED | TITLE PROJECT NO.
KootniConssirerys KNOBEL CONSULTING PTY LTD (“or ive RACKEMANN P UBS STORMWATER LAYOUT PLAN
ENGINEERS - PROJECT MANAGERS ~— [racer SWunSER RPE NRE : K1595
. PROPOSED DUPLEX ' DWGNO. | ISSUE
A | toes | SSUEDFOR APPROVAL Pee” or sere eer? Buntaigh sieads GA 4200 51 ELANDA STREET, SCALE 4400ATAI 9 2 4 8 8 10m
‘SSuEm) GATE ENMENT a Emal: [email protected] ABN 33071 435202 | SUNSHINE BEACH, QLD pienso 1200 AT A3 —————————————— Swo0i| A
2 ———
‘AKI S05\ConsiructorM WEI ISES SYIOOT-A.dtig, 20062000 £02551 AM, event, eccbe pot
Page 80
STEVE RACKEMANN KNOBEL CONSULTING PTY LTD Proposed Duplex Stormwater Management Plan Lot 403 RP48112 - 51 Elanda Street Project No: K1595 Sunshine Beach APPENDIX E Knobel Consulting Pty Ltd Details Sheet (Ref: K1595/SE001/A) K1595-0006 5S June 2009 Page v of v mmm Em meme hlaeehllCUeellCUmeUeeCmeellCmeeeee ee eel ane SeIMENt_and.Erosion.Control Layout Plan &
Page 81
PROPOSED *
{
i
43
%y
ae
\
145,
\
= \.
7.20055
£222
Ry * |
ae eceee cc
7 ¥
—
4d —
$8, Po,
” nanos ROAD, A BUND 19?
ENTRY/EXIT PAD FALL:
TO BE INSTALLED ACROSS
THE AGGREGATE PAD TO
DIRECT RUNOFF TO
SEDIMENT FENCE
40-75mm CRUSHED ROCK
OR RECYCLED CONCRETE
LEGEND i
—/——- + ———__ SEDIMENT FENCE
——_sFw -—; SEDIMENT FENCE WEIR
> —> ——> — >, TEMPORARY DIVERSION DRAIN
SEDIMENT AND EROSION CONTROL NOTES
1
STABILISED ENTRY/EXIT POINT - TYPE A
NTS OR APPROVED EQUIVALENT
DENOTES STABILISED ENTRY/EXIT
POINT, REFER LAYOUT PLAN FOR
LOCATIONS.
SEP
[~>———et
>
. PONDED RAINFALL SHALL BE PUMPED THROUGH A SEDIMENT FENCE LOCATED ON THE SITE
i
STABILISED ENTRYEXIT POINT
Yr
ZF | CONFINED WASTE DISPOSAL AREA
LL
S14
+
WATER QUALITY MONITORING STATION
THE PROJECT SEDIMENT AND EROSION CONTROL DRAWINGS ARE TO BE READ IN CONJUNCTION
WITH THE SITE'S APPROVED STORMWATER MANAGEMENT PLAN.
CONSTRUCTION IS TO BE PROGRAMMED TO PROVIDE INSTALLATION OF PERIMETER
LANDSCAPING / SURFACE TREATMENTS AS EARLY AS PRACTICAL.
THE CONTRACTOR'S WORKS PROGRAM IS TO BE REVIEWED AT THE PRESTART MEETING.
ALTERATIONS TO THE PROGRAM MAY BE REQUIRED TO ENSURE SATISFACTORY EROSION AND
SEDIMENT CONTROL.
SAFETY ISSUES MUST BE CONSIDERED AND MONITORED FOR EACH DEVICE TO THE
SATISFACTION OF THE SUPERINTENDENT.
SEDIMENT FENCE FILTER FABRIC IS TO BE APPROVED BY THE ENGINEER.
SEDIMENTATION MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF
CONSTRUCTION ACTIVITIES AND MAINTAINED AT A SUITABLE LEVEL/ CONDITION THROUGHOUT
CONSTRUCTION.
SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED BY 30%.
DRAINAGE STRUCTURE PROTECTION IS TO BE CLEANED FOLLOWING EACH SIGNIFICANT RUNOFF
PRODUCING STORM.
ACCESS TO THE SITE IS TO BE PROVIDED BY THE CONTRACTOR. APPROVAL IS TO BE OBTAINED
FROM SUNSHINE COAST REGIONAL COUNCIL FOR THE LOCATION OF THE SITE ACCESS POINT
AND WASH DOWN AREA WHICH IS TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION
PERIOD. ACCESS TO AND FROM THE SITE IS TO BE VIA THE SHAKEDOWN FACILITY ONLY. ALL
VEHICLES ARE TO BE WASHED DOWN PRIOR TO LEAVING THE SITE. wage
THE CONTRACTOR SHALL PROVIDE TEMPORARY DRAINAGE CONTROLS TO DIVERT FLOW FROM
UNDISTURBED AREAS AROUND DISTURBED AREAS AND DIRECT FLOW FROM DISTURBED AREAS
TOWARD CONTROL DEVICES.
BEFORE DISCHARGING INTO THE DOWNSTREAM STORMWATER SYSTEM.
STRAW BALES USED IN SEDIMENT DEVICES ARE TO BE REPLACED AFTER A MAXIMUM SERVICE
PERIOD OF 6 WEEKS.
WIRE FILTER CLOTH WIRE CLOTH CLIPPED. FILTER CLOTH . PROVIDE TOPSOIL LAYER FILTER CLOTH :
TO EACH STAKE AT 600 CRS \ ie OVER FILTER CLOTH FOR t LAP 100mm WEIR TO BE 600mm —}-—————~|_] REFER LAYOUT PLAN FOR SURFACE
aeseap =a a ee — Aaa = > FULL LENGTH OF SILT FENCE WIDE UN.O. ON TREATMENT AT WEIR OUTLET
; * + LAYOUT PLAN
ag +
3 ig
ROAR . “
PROVIDE WIRE STRAND 50 x 50 HW STAKES pS 5G
BETWEEN STAKES FOR OR STAR PICKETS CONSTRUCT WEIR WEIR HEIGHT TO BE
FILTER CLOTH SUPPORT b SECTION SiMBAR TO SEDIMENT Y 450mm U.N.O. ON LAYOUT
FENCE PLAN
ELEVATION
; ELEVATION
SEDIMENT FENCE DETAILS “ENCE REFER LAYOUT SEDIMENT FENCE WEIR
wes DENOTES SEDIMENT , REFER NTS” —7——Tsew — DENOTES SEDIMENT FENCE WEIR, REFER LAYOUT
PLAN FOR LOCATION AND EXTENTS. \ PLAN FOR LOCATION AND EXTENTS.
LENT : DESIGN DRAWN, APPROVED — | TITLE t PROJECT NO.
Sar pepegege “NOBEL CONSULTING PTY LTO | steve RaCKEMANN 1P EL SEDIMENT AND EROSION CONTROL
ENGINEERS - PROJECT MANAGERS = feaoccr CWHAGER- RPEO MABER 658 LAYOUT PLAN & DETAILS SHEET K1595
PROPOSED DUPLEX DWGNO. | ISSUE
Phona: 07 5576 4168 ef09 Burleigh -
A z.0603 | ISSUED FOR APPROVAL Fac or S876 ear? Bursigh Heads OFD 4200 51 ELANDA STREET. SCALE 4125ATAL 0 5 10 seo01|] A
eae) ane ENT Emak [email protected] ABN 33071435202 | SUNSHINE BEACH, QLD = ip fe DA
7
ZAKI S@S\Constructoni WCW 506-SENO 1A the, 20/2008 9:07:25 AM, evan, adobe pol
Page 82
7 7 ——7
/ / — LEGEND: ~ SeweaM ‘
. / a i 3
X Jf [===] 1.5m WIDE 100mm THICK SL72 MESH CONCRETE FOOTPATH ~-~-s—-—— _ EXISTING SEWER MAIN IL. 41.474
, " IN ACCORDANCE WITH IPWEAQ STD DRG SEQ R-065 _ eyo = EXISTING STORMWATER DRAINAGE
i nA (SSRN) PAVEMENT WIDENING REFER DETAL ew” —_ |
v I I {
CONTRASTORITO CONFIRM\ m ” . __._EJ_____ CONCRETE PAVEMENT EXPANSION JOINT IN FOR ROADWORKS NOTES REFER DWG R002 * t
LOCATION OF Ald SERVICES, Be \\y ACCORDANCE WITH IPWEAQ STD DRG SEQ R065 {Ff jest / ‘h 4 ve
PRIOR TO COMMENCEMENT S. _ ' Ze Fon, ~ / !
OF WORKS ~_\% Meee _-—_DJ____ CONCRETE PAVEMENT DUMMY JOINT IN 2 Ao5| 3
: py) \ > , iw ACCORDANCE WITH IPWEAQ STD DRG SEQ R-065 ~ on 7 = j
e n \ we - \ _— 1
3 WS | < +i PROPOSED FINISHED KERB LIP LEVELS \ ( z
wal; a < Fi els
/ “ ING PEN ¥ \ \ a
J m , exeT J BE ae et 3 é&
EXISTING POWER PQLE —~\_ \ | g4
ha
/
a
\.
/
MATCH NEATLY TO EXISTING DRIVEWAY
PROVIDE SLAB THICKENING JOIN TO
EXISTING WITH 812 DOWELS, 400mm
LONG AT 600 crs’
NEW TYPE M1 KERB FOR FRONTAGE
OF SITE. JOIN NEATLY TO EXISTING
KERB AT BOTH ENDS
j
ONTRACTOR TO REMOVE SHRUBS AS ——"~~ --——
REQUIRED TO CONSTRUCT FOOTPATH
~ ameoteet uma teed oe
REDUNDANT CONCRETE WITHIN VERGE TO BE
“REMOVED OFF SITE, VERGE TO 8E TRIMMED & TURFED
WITH WEED FREE COUCH ON COMPLETION OF WORKS. \
nena sated
THE CONTRACTOR SHALL UNDERTAKE ADJUSMENT/MODIFCATION | 1
n> TO EXISTING INFRASTRUCTURE & SERVICES TO FACILITATE ROAD i
is WIDENING & FOOTPATH CONSTRUCTION.
ge + /
' {4 L \
* DRIVEWAY SITE DISTANCE
TRIANGLES
SLD
\ |
Ley
|) ero
1 oY
\ \,
= DUPLEX
if
-EXTENT.OF PROPOSED S|
s~— ~~
mo TS ts
Sos
ee.
|
|
\
REFER R002 FOR SEWER
ZONE OF INFLUENCE
;
|
~ 43
—
24 150s Conactructon TW SES-RODT-E.thg, 11/06/2009 HAE AM, ban, Tkncbetsne'Q_C3G2 CAD
\ 8.0m. \ | ‘
—a=- —— # co 2 SEWER M/H
Va NAL 8b ae
frre NA tL. 41.21
‘SHRUBS TO BE REMOVED TO ACHIEVE STORMWATER PiT T
SITE DISTANCE _| SL 43.96 | Ssy
N IL 42.93 _— ~~ ee
3.5m WIDE, 125mm THICK, SL72 MESH DRIVEWAY IN | 7 <a -
ACCORDANCE WITH IPWEAQ STD DRG SEQ R-050 STORMWATERMM aE Sp, —_—
Ta fi ~—e
ii WIDEN PATH FROM EXISTING APPROX 1.2 TO 1.5m SL 43.63 “8h ? mS
Ns é OVER 2m TO PROVIDE SLAB THICKENING JOIN TO pees HL 42D ~ Nf
WW L4 EXISTING WITH @12 DOWELS, 400mm LONG AT 600 crs’ 30mm ASPHALT. ON AMCO PRIME 4.0L/n? SS “f
[TT eneann |= SAWCUT EXISTING ASPHALT REFER PAVEMENT ‘25mm CBR 80 CLASS 1A CONTINUES TO Heoenson "> x.
- .
7 JOINTING DETAR. so5mmn CBR 45 CLASS 2 STREET PIPE SYSTEM S
SN L ~= Za
a / 150mm CBR 15 CLASS 3
“ / |
| NOMINAL 1.5m OR AS VARIED TO AVOID POWER POLE , *
| 2h LIP OF KERB TYPICAL PAVEMENT CROSS SECTION DETAIL
@ [ *% SUBJECT TO TESTING, SCALE 1:10
. 9.150 | —
—— si [--—-——_ EDGE OF EXISTING PAVEMENT
WL slecgioe/~/—L =| 0.300 . 0.300
. 0.050 . 0.275 ! 0278 ——|
g |-— SELECT FREE DRAINING NON PLASTIC | VERTICAL CUT 1 \ | EXSTING SURFACING
: FILTER MATERIAL
° EXISTING PAVEMENT
ORR RG
Z STS IEISTING PAVEMENT] SCO
= | = }-@100uPVC CORRUGATED AND SLOTTED CLASS 1000 3 OOPS SSK
eee
t POLYETHYLENE DRAINAGE PIPE WITH GEOFABRIC le Ss CE x RESAAES XK
0.300MIN. | SOCK. JOIN TO CONNECTING SIDE DRAINS WHERE PS YY YYYYYYYYYYWYDOY DS
P le ROR UOC CR
KERB & PAVEMENT SIDE DRAIN DETAIL iS
NOTE: 1 TYPICAL JOINT DETAIL AT FLEXIBLE PAVEMENTS
PAVEMENT & KERB TYPE SHOWN ARE INDICATIVE ONLY. SCALE 120
SIDE DRAINS TO BE PROVIDED BENEATH ALL KERBERB &
CHa Peon KERB TYPE M1
{ 1:5ATAI
(CUENT 7 DESIGN DRAWN JAPPROVED. TMmeE PROJECT NO.
KeobelConsnoryit KNOBEL CONSULTING PTY LTD STEVE RACKEMANN 1P uF | hf ROADWORKS LAYOUT PLAN K1595
ENGINEERS - PROJECT MANAGERS = [Eagar CWHAGER RPEO. MARES .
8 c2c609 | TITLE BLOCK AMEXDED - . PROPOSED DUPLEX . Bweno. | issue
7» | 20502 | SSSUED FOR APPROVAL = Fon gy ssveoer7 Buren Heese ok aoe 51 ELANDA STREET, SCE S:400ATAT 0 2 4 6 8 10m R001 | B
SUE Ka | GATE AMENDMENT ~ Emak [email protected] ABN 33071 435202 | SUNSHINE BEACH, QLD 02-06-09 $200 AT AS CER ep emer,
Page 83
ROADWORKS NOTES 1, GEOTECHNICAL TESTING FOR PAVEMENT CONSTRUCTION IS TO BE CARRIED OUT IN ACCORDANCE WITH SUNSHINE COAST REGIONAL COUNCIL STANDARDS, TEST CERTIFICATES ARE TO BE PREPARED BY A REGISTERED N.A.T.A. LABORATORY AT THE CONTRACTOR'S COST AND SHALL BE PROVIDED TO THE ENGINEER PROGRESSIVELY THROUGH THE WORKS, THE CONTRACTOR IS TO NOTIFY THE ENGINEER OF ANY NON-CONFORMANCES, ALL NON CONFORMING WORK IS TO BE RECTIFIED AS DIRECTED BY THE ENGINEER. 2. FULL DEPTH PAVEMENT CONSTRUCTION SHALL EXTEND BEHIND ALL KERB AND KERB AND CHANNEL FOR A DISTANCE WHICH IS THE GREATER OF 150mm FROM THE BACK OF KERB OR ACROSS TO THE OUTER LIMIT OF SIDE DRAIN FILTER MATERIAL, 3. KERB/KERB AND CHANNEL TRANSITIONS ARE TO BE MADE SMOOTHLY OVER MIN. 1.0m LENGTH, 4, PAVEMENT THICKNESSES NOMINATED ON THESE DRAWINGS ARE PROVISIONAL. INSITU PAVEMENT SUBGRADE (AT THE UNDERSIDE OF THE NOMINATED LOWER SUBBASE COURSE WITHIN FILL AREAS, AND TO THE UNDERSIDE OF THE NOMINATED UPPER SUBBASE COURSE WITHIN CUT AREAS) TESTING IS TO BE CARRIED OUT BY A REGISTERED NATA, 0.190 fT 200 SERIES H-BLOCK COREFILLED MASONRY a N16-400 HORIZONTAL, N16-400 VERTICAL _ 5.693 GL. 45.20]] | 4 LABORATORY AT THE CONTRACTORS COST AND SHALL BE PROVIDED TO Pa THE ENGINEER FOR FINALISATION OF PAVEMENT DESIGN (CONTRACTOR IS oT TO ALLOW 3 WORKING DAYS FOR ENGINEER'S RESPONSE). ig Tae 5, SUBSOIL DRAINAGE TO BE PROVIDED BENEATH ALL BARRIER AND MEDIAN —_ N See, 3.600m WIDTH FOR ZONE OF INFLUENCE. KERB. “OL PROPOSED EASEMENT 6. FOR DIGITAL SETOUT REFER TO CONSULTING ENGINEER FOR DATA. — orm ~ 200 AT PIER 4-N16 TOP & BTM N12-450(2L) SHEAR Tp LOCATIONS 1.400, | TIES WITH N12-226(2L) 100mm EITHER Yn sm 7 SIDE OF PIER pe ——— ‘ “ye ~ PILING, SCREW PIERS OR OTHER is Pp , DESIGNED, INSTALLED & CERTIFIED BY y PILING CONTRACTOR Lo Z 00 STEBBING 8 ASSOOIATES PTY LTD ZONE OF NRLUENCE STRUCTURAL ENGINEERS & EXISTING SEWER ZONE OF INFLUENCE ” CUENT DESIGN: DRAWN APPROVED THLE PROJECT NO. Kecve consti ryit, KNOBEL CONSULTING PTY LTD | cteve RACKEMANN 1 uF |e ROADWORKS NOTES & SEWER ZONE OF K1595 ENGINEERS - PROJECT MANAGERS —[ppowect CWAAGER- RPO. NABER C535 *— INFLUENCE SED Ol DWG NO. ISSUE B | c20609 | TITLE BLOCK AMENDED Phone: 07 8576 4168 6/109 West Burteigh Road ORO ANDA omen nz e a 27-0505 | ISSUED FOR APPROVAL — Fee O07 S5766477 Burleigh Heads QLD 4220 INE BEACH ' ow. oat a 0 500 1000 1500 z000mm R002 B wel oe mana = Emak [email protected] ABN 33071 435202 | SUNS! , QLD pigetie Cee ES RP BOUNDARY 29K 1805 Construction WKY 1525-RO02-B stu, 26/2009 06 AL AM, evant, Vinobalanw'iK_C3E2_CAD
Page 84
PROPOSED
DUPLEX
7
OTL008S1
wbEC 22
¥
<< <— <— <—
~~
=
7
“ty
<_ <— <—
f
SF
%e,
|
WIRE FILTER CLOTH
TO EACH STAKE
ay
ENTRY/EXIT PAD FALLS
'BWARDS ROAD, A BUND IS#
TO BE INSTALLED ACROSS
THE AGGREGATE PAD TO
DIRECT RUNOFF TO
SEDIMENT FENCE
40-75mm CRUSHED ROCK
OR RECYCLED CONCRETE
STABILISED ENTRY/EXIT POINT - TYPE A
NTS
DENOTES STABILISED ENTRY/EXIT
POINT, REFER LAYOUT PLAN FOR
LOCATIONS,
SEP
} 2500 MAX.
AT 600 CRS \
OR APPROVED EQUIVALENT
XOUddY
009
SSS SEES
SSeS
PROVIDE WIRE STRAND ~
BETWEEN STAKES FOR
FILTER CLOTH SUPPORT
“4
ELEVATION
fo, gy
Kp
TPM ISIES
PROVIDE TOPSOIL LAYER
OVER FILTER CLOTH FOR
FULL LENGTH OF SILT FENCE
4sFwt
as or
7
&,
2b, ~N
Bs,
J
Sry
a
NE
x
FILTER CLOTH
LAP 100mm
+
FB
SECTION
SEDIMENT FENCE DETAILS
LEGEND
—— ss "Sep MENT FENCE
a
———sFw]}+-——_ SEDIMENT FENCE WEIR
> ——» —> ——» TEMPORARY DIVERSION DRAIN
a
STABILISED ENTRY/EXIT POINT
CONFINED WASTE DISPOSAL AREA
WATER QUALITY MONITORING STATION
’
}
SEDIMENT AND EROSION CONTROL NOTES
1. THE PROJECT SEDIMENT AND EROSION CONTROL DRAWINGS ARE TO BE READ IN CONJUNCTION
WITH THE SITE'S APPROVED STORMWATER MANAGEMENT PLAN.
2. CONSTRUCTION IS TO BE PROGRAMMED TO PROVIDE INSTALLATION OF PERIMETER
LANDSCAPING / SURFACE TREATMENTS AS EARLY AS PRACTICAL.
3. THE CONTRACTOR'S WORKS PROGRAM IS TO BE REVIEWED AT THE PRESTART MEETING.
ALTERATIONS TO THE PROGRAM MAY BE REQUIRED TO ENSURE SATISFACTORY EROSION AND
SEDIMENT CONTROL.
4. SAFETY ISSUES MUST BE CONSIDERED AND MONITORED FOR EACH DEVICE TO THE
SATISFACTION OF THE SUPERINTENDENT.
$5. SEDIMENT FENCE FILTER FABRIC IS TO BE APPROVED BY THE ENGINEER.
6. SEDIMENTATION MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF
CONSTRUCTION ACTIVITIES AND MAINTAINED AT A SUITABLE LEVEL/ CONDITION THROUGHOUT
CONSTRUCTION.
7. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED BY 30%.
8 DRAINAGE STRUCTURE PROTECTION IS TO BE CLEANED FOLLOWING EACH SIGNIFICANT RUNOFF
PRODUCING STORM.
9. ACCESS TO THE SITE IS TO BE PROVIDED BY THE CONTRACTOR. APPROVAL IS TO BE OBTAINED
FROM SUNSHINE COAST REGIONAL COUNCIL FOR THE LOCATION OF THE SITE ACCESS POINT
AND WASH DOWN AREA WHICH IS TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION
PERIOD, ACCESS 70 AND FROM THE SITE IS TO BE VIA THE SHAKEDOWN FACILITY ONLY, ALL
VEHICLES ARE TO BE WASHED DOWN PRIOR TO LEAVING THE SITE.
10, THE CONTRACTOR SHALL PROVIDE TEMPORARY DRAINAGE CONTROLS TO DIVERT FLOW FROM
UNDISTURBED AREAS AROUND DISTURBED AREAS AND DIRECT FLOW FROM DISTURBED AREAS
TOWARD CONTROL DEVICES.
41. PONDED RAINFALL SHALL BE PUMPED THROUGH A SEDIMENT FENCE LOCATED ON THE SITE
BEFORE DISCHARGING INTO THE DOWNSTREAM STORMWATER SYSTEM.
12, STRAW BALES USED IN SEDIMENT DEVICES ARE TO BE REPLACED AFTER A MAXIMUM SERVICE
PERIOD OF 6 WEEKS.
REFER LAYOUT PLAN FOR SURFACE
WEIR TO BE 600mm ——}-—————-
TREATMENT AT WEIR OUTLET
WIDE U.N.O. ON
LAYOUT PLAN
8
XOudd¥
WEIR HEIGHT TO BE
450mm U.N.O. ON LAYOUT
PLAN
CONSTRUCT WEIR
SIMILAR TO SEDIMENT
FENCE
ELEVATION
NTS
—-— /-— s¥ — DENOTES SEDIMENT FENCE, REFER LAYOUT
PLAN FOR LOCATION AND EXTENTS.
SEDIMENT FENCE WEIR
NTS ——:——]stw -— DENOTES SEDIMENT FENCE WEIR, REFER LAYOUT
PLAN FOR LOCATION AND EXTENTS.
A 02-06-09 | ISSUED FOR APPROVAL
GSUENo | DATE (AMENDMENT
fing Pty Lid
KNOBEL CONSULTING PTY LTD
‘CUENT
STEVE RACKEMANN
DESIGN DRAWN
™ EL
ey
ENGINEERS - PROJECT MANAGERS
Phone: 07 5576 4168
Fex 07 5576 6477
6/409 West Burleigh Road
Burtaigh Heads QLD 4220
ABN 33.071 435 202
PROJECT
PROPOSED DUPLEX
51 ELANDA STREET,
SUNSHINE BEACH, QLD
CWHAGER- RPEO. NUMBER 8538
TME
SEDIMENT AND EROSION CONTROL
LAYOUT PLAN & DETAILS SHEET
SCALE 1125AT AL 0 5 10
02-06-09 OAS et
‘2AK1S65\Constroction DWGIK L595 SEDO A de, 200612009 7A AR, exert, Tanatbstene OM CS2 CAD
Page 85
402
RP48112
R
it SUMP OVE
(RUN REFER OLTAL
300x150
GRATE
Ween 8
wos
sh,
382
of RP48112
46
Sse.
{ ‘ = RS wo)
fom 8)
| CONNECT TO EXISTING
COUNCIL PIT AND MAKE i ho wy .
GOOD CONNECTION IL 42.40 / SV SRL
SON
EXISTING 300 PIPE Ny de
Oe
CONTINUES TO. HENDERSON ~ “s,
404 STREET PIPE SYSTEM
RP48112
INTERNAL STORMWATER DESIGN
BY DENNIS CAIRNS & ASSOCIATES
‘CUENT DESIGN DRAWN APPROVED TE PROJECT NO.
an papas KNOBEL CONSULTING PTY LTD | steve RACKEMANN te | eves |—+/ |STORMWATER LAYOUT PLAN
ENGINEERS - PROJECT MANAGERS = maar CRAG APEO RRS Z K1595
Phone: 07 5576 4168 ‘8/109 West Burieigh Road ORO NDA Stee DWG NO. ISSUE
: 51 ELANDA STREET, SOME
mts = ——erv ‘AMEROMENT ” Eat eng@tnobalconait com. BUMRSN 33 074 435 202 SUNSHINE BEACH, QLD = 02-06-09 {eo ata a a Swooi} A
‘ZAK 1895 \Construgtion DWGW1S5 SHROT-A dug, 2006/2009 G11 Ad, evant, NenabetsreKN_C352_ GAD
Page 86
TSunshi ne Co 2g st DEVE| MENT FEES & CONTRIBUTIONS
lease Retum to Admin Officer, Development)
| Regional Council
E}||BONDS = Bond Refund Details an
Payee Name:
541, Address:
Road / Drainage Plan Exam
Road / Drainage Field Inspection 542
Legal Document Examination 543
Sealing Fee - Survey Plans, Legal Documents ; 544
Sale of Documents, Policy Lists, Misc 545 (CALCULATIONS jae
546
588
Bonding Admin Fee (Contributions, uncompleted works) Lot Calculation
Closed Circuit TV Inspection
Pre-lodgement Meeting Fee ; 549
{CONTRIBUT { AMOUNT [RECEIPT TYPE] Plan Examination Calculation
Developer Contribution - Landscaping §50
Developer Contribution - Road Other than PSP 583
Developer Contribution - Drainage Other than PSP 554
Developer Contribution - Pathway Other than PSP 685 Inspection Caiculation
Developer Contrib. ~ In Liew O#f St Parking (PSP13 Car parking) 556 ,
Developer Contribution — Other Parks and Community 580 it ROADWORKS\CONTR
ICS - Community Land (Not currently active) 560 Catchment: ~
ICS — Public Transport -|° 561
ICS - Sewerage (PSP Rural) 557 Road/Section:
ICS — Sewerage (PSP Coastal) 613
ICS ~ Sewerage — South Peregian (PSP Maroochy) 681 APPLICATION|DETAILS Sac -
ICS Water Supply (PSF) PayeeName: Chcrtiy Joo Pty Ltd are ihe hantey Three Trust
Address:
ICS — Sport and Recreation Land (PSP Parks) LC
ICS — Drainage (PSP Noosaville Master & Ward Street)
oo Knobel Chasulling fy Lhe |
ICS — Road (CMRNICP) If BA not entered then use 594.—~* PO Box $89Z
ICS — Pathway (PSP) Bburcéien Henags tg L220
Total of Fees Paid (Excluding Bonds) $ [UG Ss Development ee dle Sreef- Sunshine hoedk
aa ee BS AMOUNT RECEIPT, TYPE! File Numbers or Reference:
Security Deposits/Performance/Maintenance/Uncompleted Works Bon 51 (Cat 9) (4. 2009 -OF68./
. . - Date application properly made: :
Total of Fees Paid (Including Bonds =— 7
(inchuding Bendis) $1403 Receipt No: Ci). | [Recoiptbater 1h {hb
PuLand Development/FEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc
at cntaatetmeiiae lassie