Our Ref: K1595-0012
Your Ref:

17 June 2009

Sunshine Coast Regional Council
PO Box 141
TEWANTIN QLD 4565

 

Dear Sir/Madam

RE: PROPOSED DUPLEX - OPERATIONAL WORKS APPLICATION, 5] ELANDA STREET,
SUNSHINE BEACH

Please find enclosed three (3) copies of A3 RPEQ certified plans for the Engineering
works and three (3) copies of Stormwater Management Plan for the subject
development for which we seek approval. The application seeks approval for
Roadworks and footpath, stormwater drainage connection and sediment and erosion
control. The submission has been compiled to address all relevant conditions of the
approval relating to engineering matters. ~ Sn .

Also enclosed is a cheque for $1,403 (see attached email for confirmation of fees) and
IDAS application forms Part A, Part E and Assessment Checklist. A response to each
condition of the Material Change of Use approval dated 24 March 2009 Is provided
below.

 

 

 

 

 

 

 

 

 

 

 

CONDITION RESPONSE ,
1-12 The submitted engineering drawings are in accordance with the
approved plans.
13 Not Applicable
14-18 | Shown on the submitted drawing ROO]. _. -= ~
19-20 Not Applicable a ee
22-23 Footpath is shown on drawing ROOT
24° || Road widening works are. shown on drawing R001.
Internal stormwater drainage and rainwater tanks have been shown on
the drawing SWO001 along with the connection to Council's system at
the rear of the property. A Stormwater Management Plan has been
25-27 produced which looks at pre and post development flows and
-demonstrates a detention basin is not required. Any overland flow that
was able to enter the site will operate under the same flow regime in
the post developed scenario.
The existing sewer main has been picked up by survey with location
29-30 and zone of influence shown on drawings ROO] and RQO2. The building
and footings are located outside of the zone of influence.
31-34 Not applicable.
The proposed sewer easement (being equivalent to the zone of
35-36 influence width) is shown on drawing ROO] and will be included on
future easement documents prepared by the surveyor.
Earthworks are only proposed in the vicinity of the building construction.
Tne building has been designed in consideration of the natural
37 topography by suspended slab construction and ‘stepping’ of the
building into the hillside, There will be no impact to the flow regime of
stormwater and no additional ponding above that currently
experienced.
39-40 Erosion and Sediment Control is detailed in drawing SECO).

 

 

 

 

 

Knobel Consulting Pty Ltd

 

 

Knobel
Consulting
Pty Ltd

Office:

Suite 6

109 West Burleigh Road
Burleigh Heads Qld 4220
Correspondence:

PO Box 3892

Burleigh Town Centre
Burleigh Heads Qid 4220
ABN 74 375 283 428

T 07 5576 4168

F 07 5576 6477
E [email protected]

ENGINEERS

PROJECT MANAGERS

PROJECT FEASIBILITY

CIVIL WORKS

COUNCIL NEGOTIATION

STORMWATER

HYDRAULIC ANALYSIS

WATER SUPPLY

SEWERAGE

 

pOPEGIALIGONSG 10 CITIL GNGINEERING SGAIIGES ONO PROJECT MANAGEMENT
Full text of the other 85 pages

Page 2

Knobel Consulting Pty Lid

 

 

 

 

 

 

17 June 2009 Page 2 of 2
4l Contributions fo be paid by developer.
42-44 To be monitored and controlled as part of construction supervision.
45 To be provided separately. ’
46-47 Not applicable

 

 

 

 

If you have any queries please do not hesitate to contact us.

Yours faithfully

TRENT PURDON
- Knobel Consulting Pty Ltd

Copy - Neil Stebbing

Attachment - 3 x Knobel Consulting Pty Ltd, Engineering Drawings (REPQ)
3 x Knobel Consulting Pty Ltd, Stormwater Management Plan (Ref: K1595-0006)
IDAS forms Parts A, E and Assessment Checklist
Nationat Australia Bank - Payment cheque for submission - $1,403.00.

K1595-0012

Page 3

mm eS SE Mm Oe em Oe Ul mlUlellUlmelhlcmlhlm em le lee

Pa
—

Trent - Knobel Consulting

 

From: Annie Evans [[email protected]]
Sent: Friday, 29 May 2009 10:18 AM

To: Trent - Knobel Consulting

Subject: RE: K1595-0008 Fees for Operational Works Application

Hi Trent

Further to our conversations yesterday and based on the drawing provided, the fees for Operational
Works will be as follows:

3.2.2 Duplex Development Permit 422.00
3.2.3 Plan Exam 364.00
3.4 S & E control 121.00
4.1.2 Inspections 496.00 (4 inspections) If additional inspections are required
they will be charged at $122.00 each)
TOTAL $1403.00
Regards
Annie
5449 526

 

From: Trent - Knobel Consulting [mailto:[email protected]]
Sent: Thursday, 28 May 2009 3:32 PM

To: Annie Evans

Subject: FW: K1595-0008 Fees for Operational Works Application

Annie

a
Please see attached preliminary drawing to assess necessary fees for the application. There will
be other drawings in the set that are not yet finished. | think the best guide to go off is the
Development Approval. We are providing a response and plans to all conditions that request an
operational works application (engineering items only)

Please contact me with any further queries.

Regards

TRENT PURDON
Project Engineer

KNOBEL CONSULTING PTY LTD
ENGINEERS - PROJECT MANAGERS
ABN: 33 071 435 202

PO Box 3892
Burleigh Town Centre
Burleigh Heads QLD 4220

11/06/2009

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

Form 1 Development Application

—

 

Part A
Common details

NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the f form for advice on how to complete this form.

Appli icant “detai Is (The Applicant is the person responsible for making the application and need rat be the owner of the. land, The Applicant i is responsible for ensuring the
information provided on the IDAS Application Form is correct. . This information is relied upon by the Assessment Manager and any referral agencies when assessing and “" ~
, deciding this application. By lodging this application, the Applicant incurs the obligations and responsibilities prescribed by the IPA. Any development permit or pretiminary
approval that may be issued as a consequence of this application will be issued to the Applicant)

Company or organisation name (/ applicable) Ss 7aE FAC WEY Myre Sf AO: Sel. COMSUIL TITS
(ndividual applicantContact person (if there is mare than one applicant, provide additional applicant details on an attachment to this form) ri <

Title Firstname | 7 AEAT Last SaIreDon’

hame

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Postdodiress | HO. Ao 3802 Kreceran Tan compe, (2 %220
Contact telephone number S3% G16F Mobile phone number|
Facsimile number S876 6477 e-mail address 2114 Oknobe leon sett: lor .atn

 

 

 

 

 

 

 

 

 

 

 

Details of the premises (ie. the and on which the development is proposed - ~ refer tothe advice atthe end of the “ed

1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then goto a2
Name of each local goverment area in which the mobile and temporary ERA is proposed to operate

 

 

1.

 

 

 

 

OR

Table 8 Street address for the premises { ~ applicable hox/es below and insert property description in the table. Identify each lot in a separate row.)
() [2 Street address / {ot on plan for the premises (Appropriate for most applications including building applications); Of

(i) [2 Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate far development in water eg. jetty, pontoon
etc) (Note: Lot on plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government}

 

 

 

 

 

 

 

 

 

 

 

 

 

Street address Lot on plan description Local govemment area (eg

Uni | Steet ‘Street Name and official suburbfocaliy name Pest Vorwo,| Plan ope and Logan, Caims)

1. S/ | Eta OF} SteEET YOR IRPEG HQ | SUARIAE

SUNSHINE BeErdce CoMST~
AND/OR
Table C Coordinates and/or a map of the premises (4gpramiste for development in remote areas, over part of a lol. in water (e.g. channel dredging in Mareton Bay) etc.)
Coordinates
(Nate: place each set of coordinates in a separate row) Rene Datum ee een area
Easting Northing Latitude Longitude
1. (CD cpass [] wese4
(1 Other

 

 

 

 

 

 

 

 

 

 

Page 4

Page 5

INTEGRATED PLANNING ACT 1997 . Part A, Version 3.1, 3 March 2008

2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises wil not involve any of the
following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)

Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)

 

Name of water body, watercourse or aquifer (if known}

 

1.

 

 

 

 

Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on plan description for strategic port land Port authority for the lot

 

 

 

Table F Complete if the premises are in tidal water

 

Name of local government for the tidal area (// applicable) Name of port authority for the tidal area (/Fapplicable)

 

 

 

 

 

 

3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
Total area of premises (land on which the development is proposed)

° 7 5 S |r hectares (v ‘applicable uni)

Existing use of the premises @
4. Current use/s of the premises: (eg. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

HOUSE

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water etc.)
No oO Yes - Fnsure the type, location and dimensions of each easement are included in plans, submitted with the application

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proposal details
6. Brief description of the proposal: (e.g. 6 unit apartment building, 30 fot residential subdivision, a bore, aquaculture etc.)

Durecex

7. Does the proposal include new building work or operational work (inctuding any services}on the premises?
oO No haves ~ Ensure the nature, focation and dimensions of the proposed works are included in plans, submitted with the application

 

 

 

 

Resource entitlement (applicable) - further information is provided in the advice section at the end of the form

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

10 - Goto Q9 D1 Yes - Complete Table G - provide details for each evidence requited on a separate row, if applicable Evidence of resource allocation or
entitiement must be submitted with the application. You do not need to answer Q9 - go to the next section.

Nature of State-owned resource _®@

Table G {Nature of evidence required

Allocation/entitlement
reference number

 

 

 

State Government Date of | Date of

Name of authorising officer Position of authorising officer Department issue | expiry

 

 

 

 

 

 

 

 

 

 

Owner's consent (ifapplicable) ~ further information is provided in the advice section at the end of the form

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and not
within a canal as defined under the Coastal Protection and Management Act 1995, ot work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for cach ovmer on a separate row, of on an attachinent to this form if appicable.

 

 

Table H Premises Owner's name/s Details of the premises owned Owners signature* Date consent
and postal address (street address ar tot an plan description} "9 was obtained
‘ SEE 4ATTACHED

 

 

 

 

 

 

 

* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 af the Corporations Act 2007 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA websile .

Page 2

Page 6

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

Attachments and supporting information (Complete Table 1 ~ Use a separate sow for each type of. attachment 0 or inforination, including information required under
this Part) Please ensure all: documentation submitted with this form, including other Parts of Farm 1, or wner’s consent, etc, are securely attached to this Part of the Form.

 

 

ft : i
Table | (eg. Pate ora msc ee rie (eg. cman eS Trafic Report) Date seccement eget
1 (ARTE, OVERS LV AIL
CONSERT, SOR PW ATR
DAME GT LAN

 

 

 

 

 

 

 

‘Portable Long Service Leave (PLSL) levy Applicable for centain building and construction work valued over $80,000 only ad

10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (+ box if applicable)
L the application seeks a preliminary approval only;

LD the application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave)
Act 1997, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for farming purposes:
fand clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or
controlling weeds or pests);

Ai costs, that relate to the work both directly and indirectly, are less than $80,009, inclusive of GST; or

(J the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Paymient Form {no payment required if owner-builder permit manber stated). The receipted forn must be sighted by the
assessment manager belore a development petrnit can be given.

11. Is payment of a PLSL levy applicable to this application? (Refer to Q70 and the Advice below for more information)
RING cn of Part A (Yes - Answer 012 below

12. Has the PLSL levy been paid?

Oo No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the
Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit @ Notification
and Payment Form to QLeave.)

oO Yes - Complete Table L and submit, with the application, the ‘yellow* (Local Government's (Council) / Private Centifier's) copy of the receipted Qt eave Form.

i i QLeave Project Number
Table L Amount paid Date paid (6 digis, string with A, B, E, Lor P)

 

 

 

 

 

 

 

 

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Centifier) (Optional)

 

. Receiving Reference
Fee ($) Date received officer's name numbers

 

 

 

 

 

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

To: Council. | have been engaged as the private cerlifier for the building work referred to in this application.

 

 

 

 

Date of engagement Name BSA Certification license number Building classification’s

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Amount paid Date receipted form
Description of the work QLeave Project Number 6) Date paid sighted by Name of officer who sighted the form
assessment manager

 

 

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992} ar
as required by Parliament. This information may be stored in a DIP database. The information collected will be retained as requited by the Public Records Act 2002.

 

 

 

Page 3

Page 7

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

Advice for completing Part A (For more delaited advice, refer to IDAS Guide 1 (Making and IDAS application)

 

General advice

Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible for
answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger
may refuse to receive an application that is not properly made.

+ The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act
1975 only, i.e. those applications requiring the completion of Parts A and 8 only.

 

Applicant details
¢ Ifthe applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided under the IPA.

 

Details of the premises

« The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is
situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

« Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete Table A.

« The premises may be identified in a number of ways—

+ Street address and fot on plan are most common and will apply to most applications.

+ Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the premises
the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as
Zone Reference or GS84 may be provided.

The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.

Strategic Port Land is within a local gavemment area but a local government's planning scheme does not apply on Strategic Port Land. Strategic Port
Land is declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port fand) and the
Queensland Transport (Ports) website.

« ‘Tidal water’ is defined in the Coastal Protection and Management Act 7995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is
defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides)
establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless provided for under the Local Government
Act 7993. Unless otherwise provided for by legistation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is
within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local goverment tidal area.
However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the local government tidal area,
and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work).

 

Resource entitlement

¢ Section 3.2,1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State
resource. Schedule 10 of the /ntegrated Planning Regulation 1998 (\PR) prescribes the State resources, including State-owned land, where evidence is
required to be given, and the evidence required to support the application. Link to Integrated Planning Requiation. Section 3.2.1(10)(a)(ii) states an
application cannot be taken to be properly made without the required evidence.

For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the
request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.

¢ For State-controtled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette
Notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.

+ Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for
quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark.

 

Owner’s consent

* Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the tand owners, if the application
involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal
Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994.

+ Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the @

processes of the application or in the event of an appeal about the outcome of the application.

* ‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent
for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

« Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation may be used
for providing owner's consent provided it is clear the documentation relates to the development application for the premises.

« Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary ERA.

 

Portable Long Service Leave (PLSL) Levy

« The Building and Construction Industry Portable Long Service Leave Scheme provides long service {eave entitlements to workers in the building and
construction industry who would be unlikely to accrue enough service with one employer to qualify for tong service leave. To fund the scheme, a Portable
Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out in Queensland.

« The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable
Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and
Construction industry Training Levy.

« The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act} defines the building and construction work subject to the
PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines,
fences or earthworks, and works for subdividing, irrigating or draining land.

* The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued.

« The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be
completed on the QLeave website at www.qleave.ald.qov.au. For further information contact QLeave (Tel: 1800 803 481 Web: www.gleave.ald.gov.au )

 

 

 

Page 4

Page 8

 

 

Knobel Consulting Ply Ltd

 

 

   

KNOBEL CONSULTING PTY LTD

ENGINEERS - PROJECT MANAGERS
ABN: 74 375 283 428

* PO Box 3892

Burleigh Town Centre

Burleigh Heads QLD 4220
Telephone No: (07) 5576 4168
Facsimile No: (07) 5576 6477

Email: [email protected]

 

LAND OWNER/S CONSENT

 

 
 
 

mer aol | Proposed Duplex PROJECT |

    

i enqeume 51 Elanda Street re
EPTIESE Sunshine Beach .

 

L, Stephen Locke Mans , as owner/s of the property described as
( Chanteny Too Phy Lted- Dikectoe
51 Elanda Street Sunshine Beach ,

Lot 403 RP48112

Hereby, give consent for KNOBEL CONSULTING PTY LTD, to lodge all applications

associated with the property on my/our behalf.

2 Oe
Signature: Gf — : Daie. “| + ?

\——4

K1595-0009 1 June 2009 Page | of |

 

 

 

 

Page 9

INTEGRATED PLANNING ACT 1997 Part E, Version 3.2

   
     

Part E

Building &/or operational work assessable against a planning scheme!

: on, - » .

  

 

_ Nature of the works lye a . - wae .
1. Nature of work that requires assessment againsLa planning scheme:

(1 Building work - Complete Table A Operational work - Complete Table B

Table A

(i) What is the nature of the building work made assessable in the planning scheme?

(ii) Are there any current approvals associated with this application? (e.g. materia change of use}

 

 

 

 

 

 

 

 

 

 

CINo (1 Yes - Provide devaits below
List of approval reference/s Date approved Date approval lapses (if known)
[ 4.
Table B
(i) Whatis the nature of the operational work made assessable in the planning scheme?
Ur Rosdworks [stormwater (Water infrastructure [_] Clearing vegetation under the planning scheme
(1 Drainage works ~~] Earthworks CL Sewerage infrastructure
C1 Landscaping D1 Signage (Cther - Specly S€QnE YF SOW C ra

(iii) What type of approval is being sought? (O76: / you have indicated muttipie operational works in question @) above and your answers to this question
would be different for different operational work, it may be more appropiate to provide these details in an attachment to this form)

[EX bevelopment Permit (1 Preliminary Approval C1 Both ¢specity below)

(iv) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision/?
we D1 Yes - Specify the number of lots being created

 

 

 

 

 

(v) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a toy
CINo Yes - Complete Table Bfa)

Table B(a} List of approval references . Date approved Date approval lapses (if known)

1. | SUARIAE CAT REG. COATT

2008F/IFEF 2y/ 3/09

2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) $ 10,000
fe 2

 

 

 

 

 

 

 

 

 

 

 

 

 

Mandatory information ‘

* -

3. Confirm the following mandatory information accompanies this application

 

Confirmation of lodgement] Method of lodgement

Plans, and specifications if applicable, showing the nature and location of the proposed works ficuuting he
lextent of any cut and fi) 1 Confirmed

 

 

 

 

 

OFFICE USE ONLY
Date received Reference numbers.

 

 

 

 

 

 

 

Advice for completing Part E

General advice
. Part A must also be completed for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly ta another question.

a1 I A development peril authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development lo occur.

1 This form is also used for building or operational work assessable against the land use plan for Caims airport land or Mackay airport land. Wherever
planning scheme is mentioned, take it to mean the land use plan for the airport land.

Page 1

 

 

 

 

 

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 
  

IDAS

 

 

Assessment Checklist

 

IDAS Development ‘Application Form ti is the approved form for all development applications under the Integrated

Planning Act 19971PA). Form 1 i is made up of various Parts.

 

Part A (Common: details): of Form 1 must-be completed for all applications. The relevan of other Parts of Form 1

depends on the nature of the application.

Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and

ss ... feferral fequirements, and the Parts of Form 1 relevant to the application.

Section 1 and all other relevant sections of the IDAS ‘Assessivent Checklist, as identified i in the Table below, must
be completed for all development applications except those proposed on land in an urban development area, or for

~ building work requiring assessment against the Building Act 1975 only.

|. For more advice about bui

 

“For more information’ about development applications on land i in an urban an development area,’ Tefer to
i . www.ulda.qid.qov.au. .
ing applications refer to Part B of the IDAS Application Form.

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If

unsure, phone or visit your local government or log onto the DIP website www.dip.qid.gov.au for help

 

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this

 

 

 

 

 

application?
4 yes - complete Section 6 of this checklist.

checklist

Does the application seek approval to make a material change of use of the premises? O Yes | FTNo
ifyes - complete Section 2 of this checklist.

Does the application seek approval to reconfigure a lot? LD Yes | [tio
i yes - complete Section 3 of this checklist and Part F of DAS Application Form 1, ff the premises are completely within a single local

government area assessment is by the local government.

Does the application seek approval to carry out operational work? [Ves CINo
i yes - complete Section 4 of this checklist.

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? C1 Yes PINo
H yes - complete Section 5 of this checklist.

Have you received a referral agency response under seclion 3.3.2.0f the IPA, in relation to this development Yes [BNo

 

Does the application seek approval to carry out building work requiring assessment against a local government
planning scheme?

if yes - complete Form 1 Part E of IDAS Application Form 1. Assessment is by the local government.

OD Yes

ZINo

 

 

 

(Restructuring and Disposal) Act 2008?

i yes -Assessment is by the Department of Infrastructure and Planning. Complete Form 7 Part D of IDAS Application Form 1 if the application
is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the local government as
Advice Agency.

 

 

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? (Yes Ano
ityes - 90 10 Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 7. Assessment is by a

building certifier.

Do you wish the application to be assessed against a superseded planning scheme? (Yes [YNo
if yes - complete Form 7 Attachinent 7.

Is the application for development completely or partly on Cairns or Mackay airport land under the Airport Assets Yes PINo

 

 

Page 1

 

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

S E CTI O N 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.

 

HERITAGE

 

1.1A ||s any part of the proposal intended to be carried out on a Queensland heritage place under the Queenstand Heritage Act 1992?
0- Gowari [Yes

Ifyes, has an exemption certificate for the proposal'-' been issued under the Queensland Heritage Act 1992?

(Yes (INo
Ifno, is the proposed work liturgical development under Queensland Heritage Act 1992, section 78?
OyYes (No

if no, is the work being carried out by the State?

If EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 5, item 2, IP Regulation, schedule 2, table 2. item 18

Yes oO No - (Complete Form 1, Part C1) This application requires assessment by the Environmental Protection Agency (EPA).

 

1.1B | Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of the
Queensiand Heritage Act 1992, other than if place is on Cairns or Mackay airport land?
Oto. Goto Q1.2 D Yes
If yes, does the following apply?

(i) development for public housing, as defined by the /ntegrated Planning Act 1997(IPA), chapter5, []No (1 Yes
part 6

(ii) development carried out by the state on land designated for community infrastructure under the ONo (Yes
IPA, chapter 2, part 6

{iii} development that is exempt from assessment against a planning scheme under the IPA, schedule C]No (] Yes
If no to all of (i) - (ii) above - (Complete Form 1, Part C2) This application requires assessment by the relevant local governmemt as Concurrence
Agency.
IPA, schedule 8 part 1, table 5, item 2A, IP Regulation, schedule 1, patt 2, table 5, item 2: Airport Assets (Restructuring and Disposal) Act 2008, s 54.

 

REMOVING QUARRY MATERIAL; WILD RIVER AREA

 

1.2 pan the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No- Gotogr3 [1 Yes

if yes, is an allocation notice required under the Water Act 2000?
No 0 Yes

If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?

the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

(Compiete Form 1, Part K;). If NRW is not the Assessmem Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005.

IPA, schedule 8, part 1, table 5, item 1, 1P Regulation. schedule 2. table 2, tem 11:1P Regulation, schedule 1, tate 5, item 2 (wild river area): Water Act 2000, section 966C; Wild Rivers Act
2005, section 43A.

 

 

No - (Complete Form 1, Part K) This application requires assessment by the Departinent of Natural Resources and Water (NRW). if NRW is not

oO Yes - Unless the application is consistent with ‘any property development plan applying to the land, the Assessment Manager must refuse to receive it.

 

e

 

‘+ In this IDAS Assessment Checklist, the term proposal sefers to the proposed use, work os lot reconfiguralion the subject of the application.

Page 2

Page 12

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA _

 

13

 

 

Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gowai4  L1Yes

If yes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
CINo

If no, is there a code of environmental compliance under the Environmental Protection Regulation 2008 for every aspect of each
proposed ERA?

oO No - (Complete Form 1, Part G) This application requires assessment by the Administering Authority. i the Adiministering Authority is not the
Assessment Manager lor the application, the agency has jurisdiction as Concurrence Agency. Go to Q1.4
(1 Yes - Gor a1.4

O Yes

If yes, is any extraction ERA intended to be located in waters?
U1 Yes

If yes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental
Protection Act 1994, section 73AA(9)?

o Yes - Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by an
allocation notice, the Assessmem Manager must refuse to receive it. (Complete Form 1, Part G). This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994 and, subject to the declaration for the relevant wild river area,
the Wild Rivers Act 2005. If the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence

 

 

 

 

Agency.
4 No ~ An application for the ERA will be taken to be not properly made and the Assessment Manager must refuse to receive it.
CNo
If no, is any part of any ERA intended to be located in a high preservation area?
0 Yes
If yes, is each proposed ERA one of the following?
(i) asewage ERA Ld No| (1 Yes
(ii) a water treatment ERA CINo| (1 Yes
(iii) a dredging ERA _ ()No| D1 Yes
{iv) an extraction ERA carried out outside waters and the activity is a borrow pit of not ONo/L Yes

more than 10,000m: for -
* — specified works under the Wild Rivers Act 2005; or
| residential complexes, as defined under the Environmental Protection Act 1994

(v) “a screening ERA carried out outside waters and the activity is for - (CNo|L Yes
« specified works under the Wild Rivers Act 2005, or
+ _ forresidential complexes, as defined under the Environmental Protection Act 1994

(vi) a crude oil or petroleum product storage ERA and the activity is - (no|T Yes
« for residential complexes, as defined under the Environmental Protection Act 1994, &
« carried out outside a designated urban area, as defined under the Wild Rivers Act
2005

(vii) An exempt environmentally relevant activity, as defined under Environmental Protection \(C)No|(_] Yes
Act 1994, in a designated urban area, as defined under the Wild Rivers Act 2005

If yes to any one of (i) - (vii) above - Unless the application is consistem with any property development plan applying to the land, and
the application is accompanied by an allocation notice, the Assessment Manager must refuse to receive x. (Complete Form 1, Part G). This
application requires assessment by the Administering Authority for the purposes of the Environmental Protection Act 1994. ifthe
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Cancurrence Agency. Subject to
any limitations in the declaration for the wild river area and the Wild Rivers code, assessment is also required for the purposes of the Wild
Rivers Act 2005. In paiticiilar, a sewage ERA, a water treatinent ERA and an ‘exempt environmentally relevant activity’ do not require
assessment for the purposes of the Wild Rivers Act 2005 if the ERA is proposed in a designated urban atea.

 

 

 

 

 

 

 

 

If no to all of (i) - (vii) above - An application for the ERA/s will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
oO No - Answer the following question on the next page

 

Page 3

 

Page 13

INTEGRATED PLANNING ACT 1997 iDAS Assessment Checklist, Version 22

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA (continued)

 

lfno, is any ERA an extraction ERA intended to be located outside waters?

No — Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by
an allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires
assessment by the Administering Authority for the purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act
2005. if the Administering Authoniy is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.

D1 Yes

[C1No|Q Yes |
More than 10,000m3 for - ‘
¢ — Specifted works under the Wild Rivers Act 20085, or 4
* residential complexes, as defined under the Environmental Protection Act 1994

|) No|L1 ves |

| (ii) the activity is located outside a flood management area

If yes to either (i) or {ii} above - Uniess the application is consistent with any property development plan applying to the land, and
the application is accompanied by an allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1,
Part G). This application requires assessment by the Administering Authority for the purposes of both the Environmental
Protection Act 1994 and, subject to the declaration for the relevant wild river area, the Wild Rivers Act 2005. If the Administering
Authority is not the Assessment Managet for the application, the agency has jurisdiction as Concurrence Agency.

 

 

 

If no to both (i) and (ii) above - An application for the ERA will be taken to be not properly made and the Assessmem manager |
refuse to receive it.

IPA, schedule 8. part 1, table 2, item 1, IPA, schedule 8 part 1, table 5, tems 2 and 4; iP Regulation, schedule 2, table 2, items 1 and 23: Enviconmemal Protection Act 1994. section 73AA (wild
fives area): Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivess Code.

 

WITHIN THE LIMITS OF A PORT

 

14

's any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
jo- Gowoar.s [_] Yes

Hf yes, is that part of the premises below high water mark?

LI No

L1 Yes - ifanswers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8 — Answer (a) to (c) below. This application tequires assessment by the Port Authority for the land. if you answer no to (a), (b) and
(¢) below, the Port Authority for the Port has jurisdiction as Advice Agency.

(a} Is any part of the proposal within 200m of a shipping channel or an entry and exit shipping corridor for the Port?

 

 

No (1 Yes - the Post Authority for the Port has jurisdiction as Concurrence Agency.
{b) Is any part of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage or spoil grounds?
LINo C1 Yes - the Port Authority for the Port has jurisdiction as Concurrence Agency.
(c) Is any part of the proposal within 1,000m of a planned port facility identified in a land use plan?
oO No oO Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
JP Reguiation, schedule 2, table 2. tems 15 and 16
DECLARED FISH HABITAT [email protected]

 

 

Daés any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

No - Goo. Q1.6

(J Yes - ‘answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8,
this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the Assessment
Manager for the application, the agency has jurisdiction as Advice Agency.

JP Regulation, schedule 2, table 2. tem 26,

 

 

Page 4

Page 14

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 22

 

COMMUNITY INFRASTRUCTURE ‘

 

 

 

1.6 |\ls any’part of the premises designated for community infrastructure?
lo- Gotoat.?7 Ll Yes
tf yes, is the community infrastructure intended to be provided by a public sector entity?
CD No OYes
If yes, is the land owned by or on behaif of the State?
C1 Yes LI No
If no, is the development for the following?
(i) For the designated purpose Ono [Yes
(ii) Carried out by, or on behalf of, the designator Dino (Yes
If no to either or both (i) or (ii) above, is the proposed development assessable under the planning scheme?
O No O Yes - This application must be refered to the Queensland Government department administering the Act authorising the
developmen for the designation as Concurrence Agency.
IP Regulation, schedule 2, table 3, tent 7.
WASTE WATER MANAGEMENT
1.7| Dogs the proposal involve the establishment or expansion of a waste water disposal system?

 

 

No - End of Section? [1] Yes
{f yes, is any part of the disposal system proposed to be located in an area declared to be a catchment area under the Water Act 2000?
CI No- Endo Section? (C] Yes
If yes, is the proposed waste water disposal system an environmentally relevant activity (ERA) under the Environmental
Protection Act 1997?
D1 Yes - End of Section? [No

If no, is the proposed development involving the waste water disposal system assessable under the planning scheme?
oO No - End of Section 7 oO Yes - This application requires assessment by the Departinem of Natural Resources and Water (NRW) as
Concurrence Agency. End of Section 7
IP Regulation, schedule 2, table 3, item $.

 

Page 5

 

 

Page 15

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

S ECTI O N 4 Section 4 must be completed when the application seeks approval to carry out operational work.

 

 

 

 

PLANNING SCHEME
44 Is the proposed operational work assessable under any State planning regulatory provisions?
No
If no, is the proposed operational work assessable under the planning scheme?
CINo - Gowas2 Yes - Complete Form 1, Pan E and answer Q4.1.1 - 4.1.7 below
OYes
If yes, is the proposed operational work assessable under the planning scheme?
oO No ~ Answer Q4.7.1- 4.1.7 oO Yes ~ Complete Form 1, Part E and answer (4.1.1 - 4.1.7 below
STATE-CONTROLLEDROAD =. ‘ oo aa
444

ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
Wo

If no, is the proposed operational work for filling or excavating listed in /ntegrated Planning Regulation 1998, schedule § and
does‘it exceed the threshold?
VIN

lo C1 Yes - 7nis application must be referred to the Departinent af Main Roads (DMR) as Concutience Agency.
(1 Yes
If yes, is all of the proposed operational work associated with either -
« — Amaterial change of use that is assessable under the planning scheme; or (Ono OYes

« — Reconfiguring a tot that increases the total number of lots, or increases the total number of lots
abutting the State-controlled road

If no - Answer (a) - (6) below

(a) Is any of the proposed operational work associated with access to a State-controlled road?
No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

(b) Is any of the proposed operational work for filling or excavation?

CI No O Yes

oe is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency
oO Yes - This application must be referred to DMR as Advice Agency.

(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?

CINo Yes

\f yes, is the operational work proposed in a future State-controlled road not defined by route?
LINo.- tis application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
Oo Yes - This application must be referred to DMR as Advice Agency.

IP Regulation, schedule 2, table 3. tem 3; IP Reguiation, schodule 2, table 3, item 1(6).”

 

ACID SULFATE SOILS

 

412

 

Is any of the operational work proposed in a local government area listed*1 in State Planning Policy 2/02; Planning and Managing
Deyeélopment Involving Acid Sulfate Soils?
No -Gowaa73 [1Yes

If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
LI No 0 Yes

If yes, does the proposed operational work involve the following?
(i) Excavating more than 1,000m3 of soil or sediment at or below 5m AHD [No DYes

(ii) Filling the premises with 1,000m5 or more of material with an average depth of 0.5m on Ono Des
land, soil or sediment at or below 5m AHD

If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Waler (NRW) as
Advice Agency
IP Regulation, schedule 2. table 3, tem 4, State Pleoning Policy 2/02: Pisnning anid Managing Development involving Acid Suitste Soils. section 3.6.

 

 

 

41 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumeti, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpeniaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

Page 27

Page 16

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 22

 

EASEMENTS AND SUBSTATIONS

 

413

ls apy of the proposed operational work for filling or excavation?
No-Gowo414 [Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
C Yes LINo - Answer both (a) and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity
under ihe Electricity Act 1994?
LINo UO Yes

Ifyes, is any of the operational work proposed to be located in any part of the easement?
LINo = (1) Yes - this application must be referred to the entity as Advice Agency.

(b) |s any of the operational work proposed to be located within 10m of a substation site under the Efectricity Act
1994?

oO No oO Yes - This application must be refered to the entity responsible for the substation as Advice Agency.
IP Regulation, schedude 2, table 3 tem 10(6): IP Reguiauon, schedule 2. tate 3, sem 100).

 

4.1.4

ls any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Act 7923 {or the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No - Gowoa475 [Yes

If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with @
reconfiguring a lot?

LNo OD Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
No oO Yes - This application must be referred to the licence holder as Advice Agency.

EP Regulation, scheade 2, table 3, tem 17.

 

PUBLIC PASSENGER TRANSPORT

 

415

|s any of the proposed operational work listed in schedule 13C of the /ntegrated Planning Regulation 1998 and does it exceed the
specified threshold?

No - Go10 04.1.6 (1 Yes - this application must be referred to Queenstand Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 14.

 

RAILWAY SAFETY AND EFFICIENCY

 

4.16

Is any of the proposed operational work listed in schedule 13D of the /ntegrated Planning Regulation 1998 and does it exceed the
cified threshold?

No - Goto. 04.17 11 Yes - this application must be referred to Queensland Transport (Q7) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15.

 

KOALA CONSERVATION (outside SEQ urban footprint)

 

4.1.7

ls gfy part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
No - Goto. 04.2 (Yes
If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation (i.e. did you answer ‘yes’ to all questions in either 02.1.8 or Q 3.127?
(1 Yes .Gowa2  ([JNo

Ifno, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
OYes-Gowos2 [CINo

Ino, will the activity result in the following?

 

 

 

 

 

 

 

(i)__Clearing of native vegetation over ran area greater ‘than 2,500m2 OS oO No |Z Yes
(ii) Extracting gravel, rock or sand from an area greater than 5,000m?2 [No {LD Yes
(iil) Excavating or filling an area greater than 5,000m2 {0 No jC] Yes |

If yes to one or more of (i) - (iii) above - This appication must be referred to the Environmental Protection Agency (EPA) as
Concurrence Agency.

 

iP Reguiahon. schedule 2. table 3. tem 19

 

 

WILD RIVER AREA — Although legislation provides for assessment of operational works for residential, commercial and industrial development for the purposes of the
Wild Rivers Act 2005, currenlly no deciarations for any of the wild river areas apply the Wild Rivers code to that type of development.

 

 

 

Page 28

Page 17

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

AREA

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER

 

42

Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No-Gowo43  (ClYes

Hf yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?

oO No - (Complete Form 1, Part E) if the premises are completely within a single local government area, the operational work associated with recontiguring
is assessed by the local government.
Yes

If yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban area,
as defined by the Wild Rivers Act 2005?

O No - (Complete Form 7, Part £} if the premises ate completely within a single local government area, the operational work associated with
recontiguring is assessed by the local government.

LJ Yes (Complete Form 1, Part E) If the premises are completely within a single local government area, the operational work associated with
reconfigining is assessed by the local goverrunent, and subject to the declaration for the relevam wild river area, assessment by the local
government is required for the purposes of the Wild Rivers Act 2005.

IPA, schetiite 8 part 1, table 4, tem 2: IP Regulation, schedule 1, part 2, table 5, item Te}, Wild Rivers code (Note: the code docs not curently coniain applicable provisions for residentis
industial ot commercial development inside a designated urban area).

 

KOALA CONSERVATION (inside SEQ urban footprint)

 

4.3A

 

 

Is apy part of the premises in an interim koala habitat protection area?
No - Goto 04.38 O Yes
If yes, is the proposed operational work for clearing native vegetation, as defined in draft South East Queensland Koala State
planning regulatory provisions (koala regulatory provisions)*??
[No -Gowo438 C1] Yes
If yes, does the following apply?

(i) the proposed clearing is for a domestic activity, as defined in Lino |(1Yes
the koala regulatory provisions

(i) the proposed clearing is for a building or structure of less than 500 m? Dino |DYes

| grossfioorarea

(ii) the proposed clearing will result in — L1No iL] Yes
« — the clearing of less than 2,500m? of native
vegetation, as defined in the koala regulatory
provisions; and
« no loss of mature koala habitat trees, as defined in
the koala regulatory provisions.
(iv) the proposed clearing is consistent with a development approval |[]No j (1 Yes
for a material change of use, reconfiguring a lot or operational
work that has not lapsed, where
« the application for the development approval was
made before 12 December 2008 ; or

« — the development approval was given under Division
2 of the draft South East Queensland Koala State
planning regulatory provisions.

 

 

 

 

 

 

 

 

 

{f no to all of (i} ~ (iv) above - The proposed operational work for clearing native vegetation may not occur and an application involving that
component cannot be made.

IP Reguiaiion, schediie 2. table 2, tem 340: Dralt Souih East Queensland Kasia State planning regutatory provisions

 

 

4? Native vegetation is defined in the draft South East Queensland Koala State planning :egulatory provisions. The term ‘clearing’ has the meaning given in the /ntegrated
Planning Act 1997, schedule 10 (dictionary).

Page 29

Page 18

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

VEGETATION CLEARING; KOALA CONSERVATION (outside SEQ urban footprint); WILD RIVER AREA

4.3B ea of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999 applies?
No-Gowase  ()Yes

Ityes, is the proposed clearing assessable (i.e. not an exception) under schedule 8, part 1, table 4 of the IPA?
LINo-Gowars (Yes

If yes, is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section 22A
for one or more of the following?

 

 

 

 

 

 

 

 

 

 

 

(i) A project declared to be a significant project under the State Development and Public Works |) No |) Yes
! Organisation Act 1977, section 26
Gi) __ Necessary to control non-native plants or declared pest LE No {D1 Yes |
"ai To ensure public safely ; Clo {C0 Yes
(iv) For establishing a necessary fence, firebreak, road or vehicle track, or for constructing CJNo }L1 Yes
necessary built infrastructure, if there is no suitable alternative site for the fence, firebreak,
__ Toad, track or infrastructure de ef
(vy) A natural and ordinary consequence of other assessable development for which a Ono 1/0 Yes |
development approval as defined under the Planning Act was given, or a development
_application as defined under the Planning Act was made, before 16 May 2003 fe
(vi). For fodder ‘harvesting . 7 _ {No J Yes | @
(vil) Fort thinning Bo __._____ {No [Yes
(viii) For clearing of encroachment oo _ [CNo |L1 Yes |
(ix) For an extractive industry (No {1 Yes
(x) For clearing regrowth on leases issued under the Land Act 1994 for agriculture or grazing CINo {C1 Yes
purposes
| (xi) For clearing regrowth on freehold tand, or indigenous tand, in a wild river high preservation {[_]No |] Yes
i area.

 

 

 

 

If no to all (i) ~ (xi) above - The clearing is not a relevant jrupose and the Assessment Manager must refuse to receive the application.

If yes to any one of (i) - (xi) above, is the proposed clearing associated with a material change of use or reconfiguring a
lot for which referral is required in relation to clearing vegetation (ic. did you answer ‘yes’ to all questions in either 2.1.4 or Q3.3?
CJ Yes - Goto 04.4

oO No ~ Answer (4) (b} and (c} on the next ‘page of this Checklist.

 

 

 

 

Page 30

Page 19

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA (continued) : +

 

{a) fs any of the proposed clearing in an area deciared as an area of high nature conservation value (other than a
wild river high preservation area) or an area vulnerable to land degradation under the Vegetation Management
Act 1999?

Oo No - (Comptete Form 1, Part J). This application requites assessment by the Department of Natural Resources and Water (NRW).
if NRW is nat the Assessment Manager, the agency has jurisdiction as Concurrence Agericy.

O Yes
If yes, is any of the proposed clearing for (v), (vi), (ix) or (x) above? ~
LI No - (Complete Form 1, Part J). This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRV/ is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
oO Yes — The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application

(b) Is any of the proposed clearing in the high preservation area of a declared wild river area?

No - (Complete Form 1, Part J). This application requires assessment by the Department of Natural Resources and Water (NRW).
J NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.

 

 

(Yes
If yes, is any of the proposed clearing for the following purposes?
{i)__For (i), (vi), (vi) or (ix) above Co | Cl Yes
{ii) For (x) or (xi) above and in a high preservation area outside of a CNo | D1 Yes

registered area of agriculture as defined under the Vegetation
Management Act 1999
If no to either or both (i) or (ii) above - Subject to the declaration for the relevant wild river area, the application
requires assessment for the purposes of the Wild Rivers Act 2005 - Complete Form 1, Part J. This application
requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment
Manager, the agency has jurisdiction as Concurrence Agency.
If yes to either or both (i) or (ii) above, is there a property development plan approved under the Wild
Rivers Act 2005 applying to the land?
oO No - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.
oO Yes - Unless the application is consistent with any approved property devolopment plan applying to the and, the
Assessment Manager must refuse to receive it. Subject to te declaration for the selevant wild river area, ihe
application requires assessment for the purposes of the Wild Rivers Act 2005 - if an application is made
complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Managet, the agency has jurisdiction as Concurrence Agency.
(c) Is any of the proposed clearing in a koala conservation area or koala sustainability area, other than in an
SEQ urban footprint area?

[No - Go a44 OJ Yes

If yes, is any of the proposed clearing associated with reconfiguring a lot for which referral is required in
relation to proposed clearing in a koala conservation area or koala sustainability area (i.e. did you answer
‘yes’ to all questions in Q3.127?

(Yes - Gota44 [No
If no, is any of the proposed clearing over an area greater than 2,500m??
LINo - Gowos

LD Yes - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence
Agency.

 

 

 

 

IPA, schedule 8, part 1, table 4, tems TA-1G; IP Reguistion, schedule 2. table 2, tem 5 (vegetation Sean, iP Reguiation, schedule 2, table 2, tem 34 (koala conservation). IP Requiation, schedule 7, part

 

 

 

3 table 4, fem (vegetation dearing/vald tives atea); Vegetation Management Ad 1999, section 22A (vegetation cleaving wid river rca}: Wad Rivers Aa 2005, sections 3 1F and 43A, Wid Rivers Cade.

 

Page 31

Page 20

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA

 

44

's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under the Water
oe section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

lO - Goo 045 oO Yes - Answer (a) and (b) below

{a) Are the operations mentioned as self-assessable development in the following?
(i) Awater resource plan under the Water Act 2000 ONo C1 Yes
(ii) A wild river declaration under the Wild Rivers Act 2005 [_] No OO Yes
(iii) A regulation under the IPA or the Water Act 2000 (No 0 Yes

If no to all of (i) to (ili) above - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to (b)

(b) 1s any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 2005?
OC Yes
If yes, is the work for the following?
(i) A water pump
(ii) Water storage _ |
(iii) Gravity diversion from a watercourse
(iv)_ Watercourse diversion Ld
{v)__Other work for taking or interfering with water ”

(Yes (Complete Form 1, Part Kz)
oO Yes (Complete Form 1, Part Ks)

CI No

| LJ No
[CNo | (1 Yes (Complete Form 1, Part Ky) @
(No

| CNo

 

 

 

 

 

 

 

 

(1 Yes (Complete Form 1, Pant Ke)

If yes to any one of (i) to (v) above - any part of the proposal relates to operational work that interfores with water in a high preservation
area, or in a nominated waterway (other tan lor a dam or weit), the application will be taken to be not properly made and the Assessment
Manager must refuse to receive it. All other proposals are subject to the declaration for the relevant wild river area, and assessinent may
be required for the purposes of the Wild Rivers Act 2005. The appiication will equie assessment by the Department of Natural Resouces
and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
{Complete the relevant Form 1, Part K as indicated in the table above if an application is made.)

CINo

s ; A water pump

oO!
Zz,
oO
ID.
“ae
&
‘S
3
=
8
Fh
=
&
&
s

 

(ii) Water storage

di , Gravity diversion from a watercourse
(iv) Watercourse diversion —

lw Other work for taking or interfering with water

10

C1 Yes (Complete Forin 3, Part Ky)

C1 Yes (Complete Form 1, Part Ke)

 

  

  

|
jo

 

o

 

Zz
o
i
‘O
=<
oD
g
2
g
Ss
8
S
oa
g
>
g

 

(1 Yes (Complete Form 1, Part Ke)

 

 

i

If yes to any one of (i) to (v) above - The application mitlrequie assessment by the Departinent of Natural Resources anu Water (NRW). If NRW
fs not he Assessment Manager for ihe application, the agency has jurisdiction as Concurrence Agency.
{Complete the relevant Form 1, Part K as indicated in the table above.)

IPA, schedule 8 pait 1, table 4, teins 3a). IP Regulation, schedile 2. table 2. tem 8: P Regulation, schedule 1 part 2. table 4, items 2 and 3A; Water Act 2000, soction 966A (wild river @
area); Wild Rivers Act 2005, section 43A. relevant wntd nver declaration: Wild Rivers Code.

 

4.5

 

 

Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No - Go 10 04.6 oO Yes - (Complete Form 1, Pant K,) This application requires assessment by the Department of Natural Resources and Water (NRW). If
NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA schedule 8, part 1, table 4, item 3{b): P Regulation, schedule 2, table 2, tem 8; IP Regulation. scheduie 1, part 3, table 4, item 3: relevant wild river declaration, Wild Rivers Code (Note:
the code does fot currently contain applicable provisions for taking a interfering with artesian water).

 

 

Page 32

Page 21

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)

 

 

 

4.6 | Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water}?
MNo -Goi0as7 = 1 Yes - Answer (a) and (bj below
{a) Are the operations mentioned as assessable development in the following?
{i) Awater resource plan under the Water Act 2000 CINo C1 Yes
(ii) A regulation under the IPA or the Water Act 2000 [no (Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ka), This application requires assessment by the Department of Natural
Resources and Water (NRW). if NRW is not the Assessment Manager for the appiication, the agency has jurisdiction as
Concurrence Agency.
{b) ls any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
river area declared under the Wild Rivers Act 2005?

O No Oo Yes - if <ény part of the proposal relates (0 operational work in a high preservation area other than works stated in a wild tiver
declaration for the atea to be assessable development for which a development application may be made, the application will
be taken to be not properly made and the Assessment Manager must refuse to receive it. All other proposals are subject to the
declaration for the efevant wild river area, and assessmem may be required for the purposes of the Wild Rivers Act 2005.
(Complete Form 1, Part Keif an application is made.)

IPA, schedule 8 part 1, table 4, em Hci}; IP Reguiation, schedule 2, table 2, tem 8; 1P Regulation, schedule 1, pait 3, table 4, tenn 3; Water Act 2000. section 966A (witd tiver area): Wild
Rivers Act 2005, section 42A: relevant wild river deckuation; Witd Rivers Code.
4.7 |\s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
ihterfering with subartesian water (other than using a water truck to pump water)?
No-Gowa1s  (L1Yes
{f yes, are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 CINo Yes
(ii) A regulation under the IPA or the Water Act 2000 LINo (J Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Pan K,) This application requires assessment by the Department of Natu at
Resources and Water (NRW). if NRW is not the Assessment Manager for the application, ihe agency has jurisdiction as
Concurrence Agericy.
WPA schedute B part 1 table 4. item 3{c}{i): IP Regulation, schedule 2. table 2. tem 8: 1P Regulation, scheduie 1. pit 3, table 4, dem 3: Wates Act 2000, section: 966A (ld rivey avea){Nore: no cunenn wad
tives decletation identiies taking oc interfering wih substtesian water as assessalne): Wid River code (Note: the code does nol currently contain applicable provisions for subartesian wete).
4.8 | Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering

 

 

with overland flow water (other than using a water truck to pump water)?
No -Go10Q49 — [_] Yes - Answer both (a) and (b) below

(a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005?
(Yes
If yes, indicate what the proposed operational work relates to
(i) Specified works for the area LINo (Yes
{ii) Work state in the relevant wild river declaration to be CONo (Yes
assessable development for which an application may
be lodged
if yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ko Subject to the dectaration for the relevant wild river area, assessment
may be required for the purposes of the Wild Rivers Act 2005)
If no to both (i) and (ii) above - she application will be taken to be not properly made and the Assessmem Manager must retuse to receive it

CONo

If no, are the operations mentioned as assessable development in the following?
(i) A water resource plan under the Water Act 2000 LI No (Yes
(ii) A regulation under the IPA or the Water Act 2000 LI No (Yes

If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kr) This application requires assessment by the Department of Natural
Resouices and Water (NRW). if NRW/is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

{b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
CINo (Yes - (Complete Form 1, Part Kia) This application requies assessment by the Department of Natural Resources and Water

(NRW). If NRW is not the Assessinent Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1. able 4, xems 3c} and 3d): IP Regutaiion. schedtae 2, iabke ? aem 9 IP Regetauon, schedue 1. pan 3 table 4. tem 3A: Water Act 2000 secnon 9668 (wid river area).
televari wild river dectaration; Wild Rivers Code.

 

 

Page 33

Page 22

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 22

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)

 

 

 

4.9 _|Is the proposed operational work for the following?

(i) For the construction of a referable dam as defined under the Water Supply (Safety [Kio (1 Yes

and Reliability) Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% Eo CJ Yes
Hyes to either or both of (i) or (ii) above - (Complete Form 1, Part Kx} This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for tre application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 4, IP Reguistion, schedule 2, table 2, item 10.

TIDAL WORK; WILD RIVER AREA
4.10 ||s any of the proposed operational work tidal work, other than excluded work defined under the IPA?

 

No - Go1oas11 — ([] Yes - Answer (a) and (b) below
(a)_ Is any of the proposed tidal work prescribed tidal work? _

 

 

OD Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
[LI No
If no, is the work proposed in a canal?
No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
LINo- (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transpon (Maritime Safety Qid) as Concinrence Agency.
: oO Yes - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
| application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensiand
Transport (Maritime Safely Qld) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
CO Yes
{f yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
No - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qld) as
Concurrence Agency.
O Yes - (Cuinplete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qid) as
- Concurrence Agency and Qid Fire and Rescue Service as Advice Agency. ae we
ChYes —. . 2
Ifyes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?

 

LINo-An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it
_ OYes

! if yes, is the work proposed in a canal?
{ CJ No

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No ~ Unless the application is consistent with any property development plan applying to the land, the Assessinent
! Manager must refuse (0 receive it. (Complete Forin 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and assessmem for the purposes of the Wild Rivers Act 2005.
O Yes ~ Uniess the application is consistent with any, property development plan applying to the land, the Assessment
Manager must refuse lo receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.

 

If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

|
I
: | OU Yes
oO No - Unless the application is consistent with any property development plan applying (o the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P} This application must be referred to Queensland
Transport (Maritime Safety Qid) as Concurrence Agency. Subject to the declaration for the relevant wild river
' afea, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
! DO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
| Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safety Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
The application also requires assessment for the purposes of the Wild Rivers Act 2005. | _

 

 

. _TINo- Go to the frst question on the next page of this Checklist _

 

 

 

Page 4

Page 23

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

TIDAL WORK; WILD RIVER AREA (continuea)

 

Ifo, is any of the proposed tidal work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
C1 Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

LI No -An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.

Yes

{f yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it. (Complete Form 1, Part M) This application requires assessment by the Environmental Protection
Agency (EPA). if EPA is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agenty. The application also requires assessment by Queenstand Transport (Maritine Safely Qid) as Concurrence Agency
and, Subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005,

oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessmem Manager
must refuse to receive it. (Complete Form 1, Part M) This application requires assessmem by the Environmental
Protection Agency (EPA). if EPA is not tie Assessment Manager for the application, the agency has jurisdiction as
Concuntrence Agency. The application also requires assessment by Queensland Transport (Maritime Safety Qid) as
Concimence Agency and Qid Fire and Rescue Service as Advice Agericy. Subject to the declaration for the refevant wild
river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.

CINo

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No - (Conplete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concturence Agency. The application
also requies assessmem by Queensland Transport (Maritime Salety Qid) as Concinrence Agency.

oO Yes - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requites assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency) and Qid Fite and
Rescue Service as Advice Agency.

 

 

(b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
(i)__ One only local government tidal area Ono |LYes

(ii) Starting in one local government tidal area and extending into another local govemment tidal /()No |L Yes
|___ area (but in no strategic port tidal area)

(iii) In two or more local government tidal areas but not starting in either local government | tidal area Ono [DO Yes |
(iv) One only strategic port tidal area ONo | Yes
(v) A tidal area that is not a strategic port tidal area or a local government tidal area CONo | Yes

 

 

 

 

 

 

 

 

 

 

 

 

Note: The answers you provide in (i) - (v) above may affect wha the Assessment Manager is for the application.

APA, schedule 8, part 1, table 4, tem 5, 1P Regulation. schedule 2, table 2, toms 12, 14 and 17; IP Reguiation, schedule 1, part 3, table 4, items 4A and 5; Coastal Protection and
Managemen Act 1995, section 104A (wild tiver arca).

 

 

 

 

Page 35

Page 24

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA

 

4.11

CaN. of the operational work proposed to be carried out within a coastal management district?
No -Gotoo4iz2 (]Yes

__lfyes, is the proposed operational work for the following? _

 

 

 

 

 

   

 

 

 

   
 
  
 

 

 

 

; {i) _ Interfering with quarry material on State coastal land above high-water mark oo. ‘O No {0 Yes
(ii) Disposing of dredge spoil or other solid waste material in tidal water# ra No ,C] Yes
(iii) Draining or allowing drainage or flow water or other matter across State costal land above high-water : LJ No OO Yes

mark

i) “Constructing or installing works ina watercourse where the works are not assessable under IPA, (No |() Yes

_ items 3 or 4 oo eee ee __
(v)_ Reclaiming land under tidal water® 2 {Eine | Yes |
(vi) Constructing an artificial waterway, other than a canal, associated with reconfiguring alot a} No. (Yes
(vii) Constructing an artificial waterway that is a canal, associated with reconfiguring a lot= __{UNo |L1 Yes
(vill) Constructing an artificial waterway not associated with reconfiguring alot on land, other than State LNo |( Yes

_ Soastal land, above high-water if the maximum surface area of water on the waterway is at least 5,000m? _..
{ix) Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, [No [1 Yes
__, above high-water mark oo _  . 4 J
{x) Removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion DNo |C Yes @

prone area and above high-water mark . _ a L |

If yes to one or more of (i) - (x) above, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act

2007

oO No - (Complete Form 1, Patt M) This application requires assessment by the Environmental Protection A Igency (EPA). If EPA is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. I! yes, above, to any shown bold and marked with the symbol,
the application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency.

 

 

 

 

 

 

 

D Yes
Ifyes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
YeS - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it

(Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessment
‘Manager for the application, the agency has jurisdiction as concurrence Agency. if yes, above, to any shown bold and marked with the symbol 4, the
application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency. Subject ta the declaration for the relevant
wild river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.

[No - An application for the operational work will be taken to be not properly made and the Assessment Manager must reluse to receive It.

JPA schedule 8, part 1, table 4, tem 5; 1P Regulation, schedule 2, table 2 tems 12 amd 14; 1P Regulation. schedule 1, part 3, table 4, items 4A and & Coastal Protection and Management
Act 1995 Act 1995, section 104A (wild river area): Wild Rivers Act 2005, section 43A.

 

WATERWAY BARRIER WORKS; WILD RIVER AREA

 

4.12

 

 

i oy of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gowos13 [LJ Yes

If yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005? @
LINo

If no, is all of the operational work for constructing or raising waterway barrier works - tick applicable box/es and answer (a) and/or (b) below

 

 

jC) temporary no | Yes
: (ii minor . ; [No | D1 Yes
(iii) rebuilt on a regular basis [No O ves

(a) If yes to one or more of (i) - (iii) above, does all the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code?
DD Yes - 4 permit for that aspect of the operational work is not required. Go to 04.13 LINo - Gote

(b) If no to all of (i) ~ (iii) or no to (a) above - (Complete Form 1, Part Q,) This application requires assessment by the Department of Primary
industries and Fisheries (OPI&F). If DPIGF is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

OYes

ILyes, is any of the proposed operational work to be carried out in a wild river high preservation area?
No - Unless the application is consistent with any, ‘Property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part O,) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). and,
Subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the
Assessmem Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - An application for the operational work will be taken to be not ‘properly made and the Assessment Manager must refuse to receive it.

IFA scheckie 8 par 1. table 4. item 6: IPA, schedule 8, part 2, table 4. tem 2: Fisheries Regulation 1995 $113A (self assessable codesh IP. Regulauon, schedule 2 table 2. tem 28, 1P
Requiaton, schedule 1, part 3. table 4. item 6; Fishesies Act 1994, section 76D (enld tives area): Wild Rivers Act 2005, section 43A.

 

 

Page 36

Page 25

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

DECLARED FISH HABITAT AREA; WILD RIVER AREA

 

4.13

 

 

ls any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
Act A994,

No -Gowoss [Yes
If yes, is the operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)

(i) The maintenance of existing structures, including for example the following structures, if the structures | (_) No} [J Yes
were constructed in compliance with all the requirements, under any Act, relating to a structure of that
type —

+ Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs;
« Existing powerlines or associated powerline infrastructure

(ii) Educational or research purposes relating to the fish habitat area LI No|[L] Yes

(iii) Monitoring the impact of development on the declared fish habitat area LINo} (J Yes

(iv) The construction or placement of structures, including for example, safety signs, swimming enclosures | [_}No![] Yes
and aids to navigation, if ~
+ The impact on the area is minor; and
+ The structures are constructed in compiiance with all the requirements, under any Act, relating to a

structure of that type

(v) Public benefit works, including, for example, the construction of runnels for mosquito control, the (1No|C Yes
removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is minor

 

 

 

 

 

 

 

 

 

 

(a) If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
Co Yes -A permit for shat aspect of the operational work is not required. Go to Q4.14 CINo - Goto (0)

(b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
LINo- (Complete Form 1, Part Oz) This application requires assessment by the Deparment of Primaty industries and Fisheries (DPI&F). If DPIRF is not
o y the Assessment Manager for the application, the agency will have jurisdiction as Concurrence Agency.
‘es

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse 10
receive it. (Complete Form 1, Part O2) This application requires assessment by the Department of Primary Industies and Fisheries
(OPISF) and assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not he Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency.

LINo

If no, is any of the proposed operational work to be carried out in a wild river high preservation area?

C] No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse
to receive it. (Complete Form 1, Part O2) This application requires assessment by the Department of Primary industies and
Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers
Act 2005. if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
C1 Yes - An application for the operational work will be taken to be not properly made and the assessment manager must reluse to
receive il.
IEA, schedule 8 part 1, table 4. item 7 IPA, schedule 8, part 2. table 4, tem 3. Fisheries Regulation 1995 s 113A (sei-assessahle codes), IP Regulation. schedule 2, table 2, tem 25 1P-
Regulation, schedule 1, pant 3, able 4, item 7: Wid Rivers Act 2005, sections 434, Fisheries Act, section 7GUC {wild river area).

 

 

Page 37

Page 26

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 22

 

REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA

 

414

 

 

iar of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 19947
No -Gowo4is [Yes

If yes, is t is the proposed operational work reasonably necessary | for: (Tick applicable box/es and answer a) and/or (b) below)

(i) There The removal, destruction or damage of dead marine wood on unallocated State 2 land, ‘other th than ina (or No oO Yes |
wild river area, for trade or commerce

;__ Wile rive e qe 2 fd
i (ii) The maintenance of existing structures, including, for example, the following structures, if the CNo |L Yes
structures were constructed in compliance with ail the requirements, under any Act, relating to a
structure of that type —
i + — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
+ — existing drainage structures;
L . existing p powerlines or associated powerline infrastructure — |
(iii) For educational or research purposes or for the monitoring the impact of development on marine O No | Oy Yes
Plants
(iv) ) For the construction or placement of structures, ‘including, for example, swimming enclosures, safety | Ono |( Yes
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if -
+ The extent of the removal, destruction or damage is minor; and

+ The structures were constructed in compliance with all the requirements, under any Act, relating
__ toa structure of that type_

i (v) ‘For the construction of runnels for mosquito control, removal of L _yngbya, seed collection for site fm] No. oO Yes
rehabilitation or the coltection of marine plants for fishing bait, or handicraft

 

 

 

 

 

i.

(a)_ If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
oO Yes - A permit for that aspect of the operational work is not required. Go to Q4.15 oO No - Goto (b)

(b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?

oO No - (Complete Form 1, Part O,) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
O Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries
(OPI&F) and, subject to the dectaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If
OPIAF is not the Assessment Manager tor the application, the agency has jurisdiction as Concurrence Agency.

OONo

Ifo, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or

infrastructure required to support other development for which a development permit is not required or, if a

development permit is required, the permit is held or has been applied for?

oO Yes - Unless the application is consistent with any property development plan applying to the land, ie Assessment Manager must refuse to
receive it. (Complete Fonn 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries

(OPIGF) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

oO No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive tt.

IPA schedule 8, part i, table 4, tom 8: IPA, schedule 8. pant 2. table 4, tem 4; Fisheries Reguiation 1995 113A (sei assessable codes): IP Regulation, schedie 2, table 2, item 29: IP
Regidation, schedule 1. part 3. table 4, item 8: Fisheries Act 1994, section 76DB (wild river area); Wild Rivers Act 2005, section 43A; relevar wild river deciaration: Wild Rivers Code.

 

 

Page 38

Page 27

INTEGRATED PLANNING ACT 1997

 

WILD RIVER AREA

 

4.15

Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
lo -Gowa4i6 [J] Yes

If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 [LINo Yes

(i) Animal husbandry activities as defined under the Wild Rivers Act 2005 ONo C1 Yes

If yes to either {i) or (ii) above, is any part of the premises in the wild river high preservation area?
Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.

LINo

fino, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
Yes - An application for the operational work will be taken to be not properly made and the Assessmem Manager must refuse to receive tt

oO No - Untess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agriculture. Complete Form 1, Part R fanimal husbandry) Subject to the declaration for the
relevant wild river area, his application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, putt 1, lable 4, item 10: 1P Regulation. schedule 2, table 2, tem 37; Wild Rivers Act 2005, sections 42, 43A,

 

STATE-CONTROLLED ROAD

 

4.16

 

 

Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No - Endofsection4 [L] Yes
If yes, is the proposed operational work associated with either -
« A material change of use that is assessable under the planning scheme; or LINo (LJ Yes
+ — Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
abutting the State-controlled road

If no, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under
IPA, schedule @ - Answer (a) - (c) below.

(a) Is any of the proposed operational work associated with access to a State-controlled road?
No O Yes - This application must be releuied to the Department of Main Roads (OMR) as Concaence Agency.

(b) Is any of the proposed operational work for filling or excavation?
CINo (Yes

If yes, is the operational work proposed in a future State-controlled road not defined by route?
O No - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
Yes - this application must be referred to the DMR as Advice Agency.

(c) Does any of the proposed operational work invalve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?

LINo 0 Yes

If yes, is the operationat work proposed in a future State-controlled road not defined by route?
oO) No - This application must be referred to the Department of Main Roads (BMR) as Concurrence Agency.
C1 Yes - this application must be referred to the DMR as Advice Agency.

IP Regulation, schedule 2 lable 2. item 3.

 

Page 39

IDAS Assessment Checklist, Version 22

 

Page 28

‘Sunshine Coast

Regional Council

 

24 March 2009

Chantay Too Pty Ltd
CARE Martoo Consulting Pty Ltd
PO Box 1684

KiSI6-

Locked Bag 72 T 07 5475 7272

Sunshine Coast Mail Centre F O7 8475 7277

Qid 4560 & [email protected] 37 876 973 913 W wvausunshinecoast.qld.gov.au

Officer: Evelyn Murphy

Direct Telephone: (07) 5449 5225

Response Address: PO Box 141, Tewantin QLD 4665
Email: EN jecoas OV,
Our Reference: 2008/1867

Your Reference: 00800 LO5 MK

    

SCEIVED
neo consulting SC
L O Courter

NOOSA HEADS QLD 4567

   
  

vfs 95 MAR 2009 Gone

File ROK, scans haedte
ROLLIE vereef

  
 
 

 

Dear Madam

Decision Notice
integrated Planning Act 1997

| refer to your application and advise that on 24 March 2009 Council decided to approve the
application in full subject to conditions.

 

Details of the decision are as follows:

 

 

Application No: 2008/1867
Street address: 51 Elanda Street, Sunshine Beach
Real property description: Lot 403 RP 48112

Planning Scheme:

The Noosa Plan

 

 

 

The following type of approval has been issued:

 

. Development Permit for Material Change of Use - Multiple Housing Type 2 - Duplex

 

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

 

Land Use

4. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and may
be amended by these conditions: -

; Plan’ TT Rev.
: Document No.

° | DA-DO8

 

‘Plan? Document Name ‘Date

   

Floor P
| Architecture i '

Page 1 of 14

Caloundra Office
+ Omrah Avenue

Maroochydore Office
11-13 Ocean Street

Tewantin Office
9 Pelican Street

Nambour Office
Cnr Currie and Bury Streets.

Caloundra Qld 45514 Maroochydore Qld 4558 Nambour Qld 4560 Tewanlin Qid 4565
T O07 5420 8200 ¥ O7 5475 8501 T 07 5475 8501 ‘4 07 5449 5200
F 07 5420 8900 F 07 5444 8338 F 07 5441 8338 F 07 5447 1062

 

Page 29

 

 

 

 

 

 

 

 

 

 

2008/1867

“DA-D04— i Ground Floor Pian East — Andrew Bock! 17 October 2008 —
: : Architecture i :
“DA-DO5 = Floor Plan Level 1 — Andrew Bock! 17 October 2008 |
| Architecture ; i
“DA-D06 1 Tf Floor Plan Level 2 — Andrew Bock | 17 October 2008 4
Architecture i
' DA-DO7 _ | Roof Plan— Andrew Bock Architecture | 17 October 2008 | i
| DA-E.01 North “Elevation —~ Andrew Bock | 17 October 2008
: Architecture
/DAE02 ~~) | South" Elevation’ “" “Andrew © Bock | 47 Gctober 2008“!
: Architecture :
* DA-E.03 East “Elevation — Andrew Bock | 17 October 2008 |

; Architecture
DA-E.04 oT West Elevation — “Andrew” Bock ! 17 October 2008

! i Architecture i :
DAF OT A | A-Section 61 ~~ Andrew Bock | 28 January 2008
| Architecture ' i
“DAF.O2 OY ‘|’ -Section 02 = Andrew Bock Architecture | 28 January 2008
: DA-F.03°~” “~~ T -Section 03 — Andrew Bock Architecture | 28 January 2009
“DAF.04 | ~—_—'| -Section 04 — Andrew Bock Architecture | 28 January 2009S
, DA-F.O5 "1" "Section 05 — Andrew Bock Architecture | 28 January 2009.
“DAZ.03 | ~~ Ss«| View from South East — Andrew Bock | 47 October 2008
Architecture :
!DA-Z.04 View from South West 2 — Andrew Bock | 17 October 2008
i Architecture \

 

 

The development must be undertaken and operated In a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.

The open space ‘and setback areas are to be landscaped in accordance with Council's Policy
on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to
be completed prior to the premises being occupied and maintained at all times thereafter and
shail include:-

3.1 A minimum of 2 street trees are to be provided along the sites frontage.
3.2 Screening vegetation is to be provided along the side boundaries.

Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. These landscape
plans required to be submitted are to denote areas of existing vegetation or existing trees
proposed or required to be retained.

All fencing shail be setback at least 1 metre from the front property boundary, with at least half
of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street

Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.

Page 2 of 14

 

Page 30

2008/1867

 

10.

11.

12.

The premises are to be identified by the provision of a street number in a prominent location to
ensure it is identifiable to all persons, particularly emergency services personnel.

Building Height is to be a maximum of 3 stories and 12 metres above natural and finished
ground level as per the Noosa Pian. A verification survey of the building is to be carried out by
a Licensed Surveyor and a certificate lodged with Council at completion of work confirming
compliance with the maximum allowable buitding height as required by either the conditions of

_ approval or the Planning Scheme.

Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.

The requirements of this development approval are to be effected, prior to the use of the
premises, Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.

The Development Permit for a material change of use of premises lapses if the use has not
happened by 24 March 2013, unless an application to extend the relevant period is approved
by Council.

The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.

Building Services

13.
Lan

Fences are not permitted to exceed 2 metres above natural ground level.

Vehicle Access

14.

15.

16.

17.
18.

A vehicular access driveway shall be constructed to the site frontage with a maximum width of
3.5m within the Elanda Street Road Reserve. The driveway must then increase In width to a
minimum of 5.5m within the property to allow passage of two cars on the driveway.

The driveway shail be designed and constructed to Council's design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways be
constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
the driveway be removed and reconstructed to levels that do comply.

Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall,

To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
the driveway and any associated fencing or vegetation near the driveway shall-comply with the
minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant shall
demonstrate compliance by illustrating these sight lines on the plans submitted for both
Operational Works approval! and Building Works approval.

All vehicles shall enter and leave the site in a forward direction.

The vehicle manoeuvring area at the northern end of the driveway shall remain unobstructed
at all times. Signage shall be installed to ensure vehicles do not park in the vehicle
manoeuvring area.

Off Street

19.

The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 1A with allowance for vehicles to enter the space ina forward gear, reverse and
leave the site in a forward gear in a total of three movements.

Page 3 of 14

 

Page 31

phere

2008/1867

 

20.

The carpark and driveway area must have a minimum head clearance (headroom) of 2.2m at
any point.

Frontage Works

21.

22,

23,

Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Elanda Street frontage of the site in accordance with Planning Scheme Policy PSPO3
Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.

A new 1.5m wide concrete path shail be constructed along the Elanda Street frontage of the
site in accordance with Council's design standards and to an alignment that protects any
significant vegetation or any underground services. The footpath shall connect to and match
evenly with the existing footpath networks located to the north and south of the site.

All paths, driveways and parking areas Shall be designed and constructed to ensure
pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to
be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1
Design for Access & Mobility.

Road Works

24,

The full length of the Elanda Street frontage of the development site shail be upgraded by
providing kerb and channel, bitumen road widening and landscaping improvements to the
footpath. The new kerb and channel shall be aligned so that it is located 8 metres off the
existing kerb and channel on the western side of the road measured from the nominal face of
the kerb,

All associated and ancillary work including pavement correction to the existing pavement,
drainage works, modification of the footpath, and adjustments to the existing infrastructure
shall be undertaken to complete the roadworks widening.

In this regard, plans detailing this work shall be prepared and submitted to Council for
approval prior to obtaining a Development Permit for Operational Works.

Roof Water & Stormwater Drainage

25.

26.

Roof runoff from any new building shall be directed to a ralnwater storage system or tank that
is installed to ensure water from the rainwater storage system or tank is used for external uses
(such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming
pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps
and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the
Queensland Development Code (QDC) current at the time of building approval, and shall be
part of the plumbing application for approval. The location and capacity of the tanks shall be
clearly shown on the plans submitted for Operational Works approval and any overflow shall
be directed to the approved stormwater discharge point.

All stormwater drainage shall be collected on site and discharged so there is no net increase
in stormwater runoff from the site. Stormwater drainage permitted to drain from the site may
be discharged to Council's existing drainage structures at either the grated stormwater pit at
the south east corner of the site or to the kerb and channel in the Henderson Street road
reserve. Stormwater drainage permitted to drain from the site must be in accordance with an
Operational Works Approval for stormwater drainage.

The Operational Works application for stormwater drainage must clearly demonstrate to the
satisfaction of the CEO's delegated officer that the stormwater structure nominated to receive
site drainage has sufficient capacity to recelve any additional flows generated from the site.

Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer of
Queensland (RPEQ) and submitted to Council prior to obtaining a Development Permit for
Operational Works.

The maximum discharge of stormwater drainage allowable to Council's kerb & channel street
drainage system at any one location is 25 litres/second. -
Page 4 of 14

 

Page 32

2008/1867

 

27.

28.

A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.

As the site is proposed to be filled, stormwater drainage pipes and/or an overland flow-path
that caters for drainage from the adjoining sites for a design storm with an Average
Recurrence Interval of 1 in 100 years shall be installed within the site to collect and discharge
stormwater runoff from all adjoining properties to prevent additional ponding/flooding on these
properties.

All site stormwater drainage shail be by means of a gravity system.

Sewer Mains

29.

30.

The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council's.standards and requirements at no cost to Council. .

The existing sewer main that traverses the rear of the site and the ‘zone of influence’ (taken as
the area within a 45-degree angle measured from the ‘invert of the sewer main to the finished
surface level) shall be accurately located and determined by a licensed Surveyor and shown
on all plans submitted for Operational Works approval.

To ensure Council's sewer main is accessible for maintenance purposes and is protected from
tisk of damage no structures requiring a building permit (eg. buildings, swimming pools,
retaining wails exceeding 4m in height, raised terraces, etc) shall be constructed within this
‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
As such the applicant shall amend Operational Works plans including Building plans to ensure
compliance.

Town Water Supply

31.

32.

33.

34,

The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council's standards and requirements at no cost to Council.

The development shall be served by individual water meters to each tenement and be capable

‘of being separately rated.

Each individual water connection to the water reticulation system shall extend fo the property
boundary and be metered. All fees for the supply of water meters shall be paid to the Council.

Ali water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council's contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council's Water & Sewerage Capital Works
Manager prior to lodgement and approval! of hydraulic drawings.

Service Easements (Sewer)

35,

A registered easement shall be created over the zone of influence of ali sewers within the
subject site and over those parts of the subject site that are impacted upon by sewers on any
adjoining sites. The easements shall generally be paraltel to and centred over the sewer main
and be equivaient in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0m wide
overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
determine the necessary width of the easement, which shall be shown on any plans submitted
for Operational Works approval. To this extent the surveyor shall certify that the sewer and the
zone of influence is wholly contained within the easement to be created.

In addition to this the Applicant’s Solicitor shail give Council's Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Tittes Office forms or requisitions requiring the consent of
Council will be attended to promptly.

Page 5 of 14

 

Page 33

2008/1867

 

36.

A duly executed copy of the easement shail be submitted to Council for perusal prior to the
use commencing.

Any changes required by Council's Solicitor must be corrected immediately.
No building or other structure shall be constructed or encroach over an easement.

Earthworks

37.

38,

Earthworks on site shall be carried out in accordance with Council’s Planning Scheme Policy
PSP5 — Engineering Design Standards, so as not to cause the additional ponding of water on
any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed
site surveys indicating natural surface levels and contours of the adjoining properties must be
provided with the application for a Development Permit for Operational Works for Drainage.

This may require the design and construction of drainage pipes and/or an overland flow-path
within the development site that caters for drainage from the adjoining sites for a design storm
with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
Water encompassing the drainage pipes or overland flow-path will also be required. In this
regard a Development Permit for Operational Works shall be obtained.

Should evidence be provided to Council indicating that no additional ponding of stormwater
will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
path and easement shall not apply.

Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval,

Erosion and Sediment Control

39,

40.

Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.

In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.

Scour of the site shall not occur as a result of the approved development. In this respect, all

overland flow path areas must be suitably stabilised.
»

Contributions Towards Council Infrastructure

41.

Monetary contributions shalt be paid to Sunshine Cost Regional Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:

 

 

 

 

 

 

 

 

 

 

 

PSP 12 — Public Open Space Contributions (Park) $ 3,164
PSP16 — Sewerage Headworks Contributions $3,513
PSP17 ~ Water Supply Headworks Contributions | $4,956
PSP20 — Pathway Trunk Network Contributions $711
TOTAL Contribution Amount = $ 12,344
‘Page 8 of 14

 

Page 34

2008/1867

 

 

 

Groups Brisbane from December 2008 until the date of payment.

Please note, that these amounts are all subject to variations in the Consumer Price Index, All

 

 

All contributions must be paid prior to the issue of a Development Permit for Operational
Works. .

Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full. .

Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council's Land
Development Commercial & Regulatory Fees at the time of lodgement.

In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the paid contributions and/or the trading bank guarantee will be returned.

General

42, Any damage caused to any public utility during the course of construction shall be repaired to
Council's standards and at no cost to Council.

43. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.

44. The transportation of all materials to and from the site shall be undertaken in a manner such

that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.

Environmental Health

45.

Where the development invoives the removal, relocation or demolition of a building, a Waste
Management Plan (construction and demolition) shall be submitted prior to demolition,
removal or relocation of any building other than a shed.

Waste Management Plans (construction and demolition) are required to be submitted in
accordance with Planning Scheme Policy 11, Waste Management Plans see table below.

Waste storage areas are to provide for adequate separation of all reusable, recyclable and

waste materials. These shail be located so that they are convenient and safe to use. (Refer to

Noosa Council Waste Management Code)

The Plan shall contain the following information: .

e The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application,

. A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled — reused or disposed.

Page 7 of 14

 

Page 35

2008/1867

 

46.

47.

 

MATERIALS ON-SITE

DESTINATION

 

Re-use and Recycling

Disposal

 

Expected waste
materials

‘Estimated
volume(m?*)

On-site
“specify proposed
te-use or on-site

Off-site
“specify contractor
and recycling outlet

“specify contractor
and landfill site or
other disposal site

recycling methods

 

Excavation
material

 

Green waste

 

Bricks

 

Concrete

 

Timber-please
specify

 

Plasterboard

 

Metals - please
specify

 

Asbestos

 

Other -
specify

please

 

 

 

 

 

 

 

Note * Ifa demolition contractor Is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.

 

 

The purpose of the Waste Management Pian is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill some items are free.
Higher gate fees are charged for loads of mixed waste.

 

 

The developer must provide waste storage and disposal facilities in accordance with Planning
Scheme Policy “Waste Management Multi-Dwellings and Commercial and ‘Industrial
Premises", including an external imperviously paved area correctly sized for all refuse and
recycling containers and sultably screened from public places and neighbouring properties.

Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
Pumps etc) shall comply with the following requirements:

47.1 The equipment shall be installed and located in a manner that prevents excessive
Noise in accordance with Council’s Local Law No. 12 - Control of Nuisances.
Infringement Notices (on-the-spot fines) may apply for offences.

>»

47.2 Aperson must not use equipment on any day if it makes or causes noise to be made:

47.2.1 From 10pm to 7am: More than the jower of either —

. 40 dB(A)

3 dB(A) above the background noise level

47.2.2 From 7am to 7pm: More than the lower of either —

* 50 dBA)

° 5 dB(A) above the background noise level
47.2.3 From 7pm to 10pm: More than 3 dB(A) above the background noise level.
47.2.4 Pool pumps must not be audible at an effected premises between 10pm-7am

Page 8 of 14

 

Page 36

2008/1867

 

47.3

Submission of written certification from a suitably qualified person confirming that the
noise levels comply when measured at either the residential boundary or outside the
most exposed part of an affected building, whichever is the closest to the equipment.
This is required immediately after installation of the equipment and prior to any
occupation of the building, and in a format approved by Council. This assessment
must take into account noise from all fixed equipment on the property e.g. swimming
pool pump, heating equipment, that may increase the overail noise level emitted.

Note: it is recommended that the consultant that will be engaged to certify the noise levels of
mechanical equipment is asked to comment on the position and installation of equipment at
the plan design stage, this is way noise problems can be > minimized 0 or avoided cost t effectively.

 

 

 

The referral agencies applicable to this eeptaton are:

 

| Referral ‘Trigger

 

 

  
 

 

Referral Status.

Referral al Agency

 

 

Referral Address

 

[6 APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this s development approval are listed in the following

table:

 

[ Pian / Document No.

Rev

  

Pian] Document Name *

 

  

 

West — Andrew

 

 

 

 

 
 

 

 

 

 

  

 

 

 

 

_ DA-DOS ! Ground Floor Pi
Architecture .

“DADO4 ee Ground Floor Plan East — Andrew Bock | 17 October 2008
| i Architecture

| DA-DOS Floor Pian Level 1 - Andrew Bock | 17 October 2008

| | Architecture
bee eee a we a ee sa a ee
' DA-DO6 Floor Plan Level 2 - Andrew Bock | 17 October 2008 i
' | Architecture i
ee whe Figen wes soon gu ceegve es sevefe ge meieeeceey tie vgegsig gteeas essed
: DA-DO7 Roof Plan ~ Andrew Bock Architecture: 17 October 2008 i
b. we | i En nnce sages “|
| DA-E.01 i | North Elevation — Andrew Bock | 17 October 2008 i
! Architecture i
> DA-E.02 | South Elevation “-~ Andrew ck | 17 October 2008 :
Architecture :
 DA-E.03 East” Elevation — Andrew Bock | 17 Ociober 2008!
: Architecture ‘ :
| DA-E.04 West Elevation -— Andrew Bock | 17 October 2008 i
i Architecture |
} . 7 co es |
: DAF.O1 A A-Section 01 —- Andrew Bock | 28 January 2009 i
‘ Architecture . ‘
| -Section 02 — Andrew Bock Architecture | 28 January 2000

 

 

 

' !2Section 03 — Andrew Bock Architecture

 

 

 

'-Section 04 — Andrew Bock Architecture

 

 

28 January 2009

 

 

1 Section 08 - - Andrew W Bock Architecture |

 

| 28 January 2008 —

Page 9 of 14

 

Page 37

2008/1867

 

 

 

 

- DA-Z.03° ; “| View from South East — Andrew Bock 147 October 2008.”

i Architecture :
PDA-Z.04 “1p Wiew from South West 2 — Andrew Bock [47 October 2008 ~~
: i Architecture i i

 

 

 

 

[7 ADVISORY NOTES

TES sine - |

 

The following Advisory Notes are for information purposes only and do not form conditions of
approval:

1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities:-

 

 
 

 

 

Multiple Housing -

Detached House 1 Dwelling Type 2 ~ Duplex

2.x 3 Bedroom Units

 

 

 

 

 

 

2, The development should be undertaken in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
emissions in accordance with the nuisance provisions of the Environmental Protection
Regulation 1998 or Council’s Local Law No. 12 — Control of Nuisances.

3. In accordance with the Environmental Protection (Water) Policy 1997, ail sand, silt, mud, paint,
cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed
where it could reasonably be expected to move into a roadside gutter, storm water drain or a
watercourse. On the spot fines apply for such offences.

4. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1994 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Bullding and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.

»

§. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $1,102 and is subject to variations in the Consumer
Price Index, All Groups Brisbane from December 2008 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.

6. The applicant is Informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.

7. The applicant is advised that a Compliance Permit for ail plumbing and drainage works within
the boundaries of the development site shall be obtained from Council's Plumbing Services
Section prior to obtaining a Development Permit for Building Works.

Aboriginal Cultural Heritage Act 2003

There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).

Page 10 of 14

 

Page 38

2008/1867

 

The ACH Act establishes a cultural heritage duty of care which provides that: "A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage’. \t is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.

You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

le PROP

PROPERTY NOTES —

 

 

 

   

Not applicable
ecco tnnee renee em ve neem anon semen cevertveninrensnaty

[9 PRELIMINARY APPROVAL OVERRIDING SCHEME = |

Not applicable

 

Pen anne ec sonny

[10 "FURTHER DEVELOPMENT PERMITS REQUIRED

   

 

   

pe of of Development Permit required. | Subject. of the required D Development Permit ~

  

| Development Permit for Building Works ‘All Building Works

 

| | Development Permit for Operational i Landscaping, Carparking and Access, Frontage |
| Works | Works, Stormwater Drainage, Erosion & Sediment |
| / | Control & Filling of the Site

 

 

 

 

144 “SELF ASSESSABLE CODES ~ |

Not applicable
ty ‘

tenn ncsetraremnane cevorraemietene ami

 
 

 

Not applicable

 

 

 

PPROVAL DESPITE CONFLICT WITH SCHEME |

 

*

 

RIGHTS OF APPEAL

[RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

 

During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. if Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice"
may be given, Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the integrated Planning Act 1997)

a

    

   

 

 

Please note that an Infrastructure Charge i in accordance with the Coastal “Major | Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.

Should you wish to obtain more information about Council's decision electronic copies are available

on line at www.sunshinecoast.ald.goy.au, or at Council Offices.
Page 11 of 14

 

Page 39

2008/1867

 

Yours faithfully,

Chore

Tracy Jones

s

E.

JOR PLANNING OFFICE!

 

R

Page 12 of 14

 

Page 40

 

2008/1867

 

 

 

Sunshine Coast

 

| Appeal Rights uo

 

1
|

Regional Council | INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
i

 

The following is an extract from the Integrated
Flanning Act (Chapter 4).

 

Division 8 - Appeals to court relating to

development applications

Appeats by applicants

4.1.27.(1) An applicant for a development application

may appeal to the court against any of the following-

(a) the refusal, or the refusal in part, of a development
application;

(b) a matter stated in a development approval,
Including any condition applying to the
development, and the identification of a code
under section 3.1.6;"

(c) the decision to give a preliminary approval when a
development permit was applied for;

(d) the length of a relevant period;
(e) a deemed refusal.

(2) An appeal under subsection (1)(a) to (d) must
be started within 20 business days (the “applicant's
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant.

(3) An appeal under subsection (1)(e) may be
starled at any time after the last day a decision on the
matter should have been made.

Appeais by submitters

4.1.28.1) A submitter for a development application
may appeal to the court about-

(a) the giving of a development approval, including
any conditions (or lack of conditions) or other
provisions of the approval; or

(b} the length of a relevant period for the approval.

{2) The appeal must be started within 20 business.

- days (the “submitters appeal period”) after the day

the decision notice or negotiated decision notice is
given to the submitter.

{3) If a person withdraws a submission before the
application Is decided, the person may not appeal the
decision.

(4) If an application involves both impact
assessment and code assessment, appeal rights for
submitiers are avallabla only for the part of tha
application involving impact assessment.

(6) If an application is processed under section
6.1,28{2), appeal rights for submitters for the
application are available only for the aspects of ihe
development that would have required public
notification under the repealed Act.

" Section 3.1.6 (Preliminary approval may override ,

locat planning instrument)

 

(8) If an application involves assessment agalnst a
concurrence agency code, appeal rights for submitters |
for the application are not available against the part of
the approval that represents the concurrence agency's
response for the code.

Appeals by advice agency submitters

4.1.29.(4) An advice agency may, within the Ilmits of

its jurisdiction, appeal to the court about the giving of a

development approval for a development application

if- .

(a) the development application involves impact
assessment, and

(b) the advice agency told the applicant and the
assessment manager to treat its response to the
application as a submission for an appeal.

(2) The appeal must be started within 20 business
days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
submitter.

Appeals for matters arising after approval given
(co-respondents)

4.1.30.(1) For a development approval given for a
development application, a person to whom any of the
following notices have been given may appeal to the
court against the decision in the notice-

{a) a notice giving a decision on a request for
extension of the relevant period for an approval;

(b) a notice giving a decision on a request to make a
minor change to an approval.

(2) The appeal must be started within 20 business
days after the day the notice of the decision is given to
the person.

(3) Subsection (1)(a) does not apply if the
approval resulted from a development’ application
{superseded planning scheme) that was assessed as
if it were an application under a superseded planning
scheme. :

{4) Also, a person who has made a request
mentioned In subsection (1) may appeal to the court
against a deemed refusal of the request.

(5) An appeal under subsection (4) may be started
at any tlme after the last day the decision on the
matter should have been made.

Divisfon 9 - Appeats to court about other matters
Appeals for matters arising after approval given
(no co-respondents)

4.1.31.(1) A person to whom any of the following

notices have been given may appeal to the court

against the decision in the notice-

(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.

Page 13 of 14

 

Page 41

2008/1867

 

(b) a notice under section 6.1.44* giving a decision to
change or cancel a condition of a development
approval.

(2) The appeal must be started within 20
business days after the day the notice of the decision
is given to the person.

(3) Also, a person who has made a@ request

mentioned in subsection (1)(a) may appeal to the.

court against a deemed refusal of the request.

(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.

Appeals against decisions to change approval
conditions under the repealed Act

4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-

{a) the decision; or

(b) a deemed refusal of the application.

(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person. .

(3) An sppeal under subsection (1)(b) may be
started at any time after the tast day a decision on the
matter should have been mace.

Appeals against local laws .

4.1,33B,(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises or
the erection of a building or other structure permitted
by the planning scheme may appeal to the court
against the decision or the conditions applied.

(2) The appeal must be started within 20 business

days after the day notice of the decision Is given to the

applicant.

For Building Works Only

Rights of appeal conferred by Section 4.2.9 of the
Integrated Planning Act 1997 as follows:

Division 3 ~ Appeals to tribunals relating to
davelopment applications

Appeals by applicants

4.2.9(4) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-

(a) the refusal, or the refusal in part, of a development
. application;

(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;°

(c) the decision to give a preliminary approval when a
development permit was applied for;

? Section 6.1.44 (Conditions may be changed or
cancelied by assessment manager or concurrence
agency in certain circumstances)

* Section 3.1.6 (Preliminary approval may override
local planning instrument)

(d) the length of a period mentioned in section 3.5.21
relevant period; ©
{e) a deemed refusal.

(2) An appeal under subsection (1)(a) to (dj must
be started within 20 business days (the “applicant's
appeal pertod”) after the day the decision notice or
negotiated decision notice is given to the applicant.

(3) An appeal under subsection (1)(e) may be
started at any time afler the last day a decision on the
matter should have been made.

The Registrar for the Building and Development
Tribunal may be contacted at the website

http:/www.localgovernment.gid.gov.au/
For Infrastructure Charges Only

4.1.36 Appeals about particular infrastructure

charges .

(4) This section applies to a person who has been

given, and Js dissatisfied with, an infrastructure

charges notice or a regulated State infrastructure
charges notice.

(2) The person may appeal fo the court against the

notice,

(3) The appeal must be started within 20 business

days after-

(a) ifthe notice Is given because of a development
approval or master plan approval-the day the
applicant is given notice of the decision about the
€approval; or

(b) otherwise-the day the notice is given to the
person.

(4) An appeal under this section may only be about-

(a) whether a charge in the notice is so
unreasonable that no reasonable retevant focal
government, State infrastructure provider or
coordinating agency could have imposed it; or

(b) an error in the calculation of the charge.

(8) Toremove any doubt, it is declared that an

appeal under this section can not be about the

methodology used to establish the charge In the
relevant infrastructure charges schedule or regulated

State infrastructure charges schedule.

>

Page 14 of 14

 

Page 42

Gl & 8 G2 ote tw oo Mm Oo Eo eee ee lL hl

a =D oo

 

4 i Tewantin Office, 9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565
sunshine Coast | Ponca ses s200 PO Box 141 Tevan
Regional Council -ABN 37876 973 913

 

 

 

 

 

INFRASTRUCTURE CHARGE NOTICE °

Chantay Too Pty Ltd
CARE Martoo Consulting Pty Ltd
PO Box 1684 NOOSA HEADS QLD 4567

ce: Chantay Too Pty Ltd Date of Issue: 25/03/2009

 

 

PO Box 4185 . Charge Notice No: 1C0000842 Rev No: 0
ASHMORE QLD 4214 Reference No: 08/1867 (DA)

LAND TO WHICH THE INFRASTRUCTURE CHARGE APPLIES:

Planning Scheme: The Noosa Plan

Property Description: 403 RP 48112 Par Weyba Cty March

Property Address: 51 Blanda Street SUNSHINE BEACH QLD 4567

 

TRUNK INFRASTRUCTURE FOR WHICH THE INFRASTRUCTURE CHARGE NOTICE APPLIES:
INFRASTRUCTURE CODE Job No :

 

Coastal Major Road Network CMRN 0012014.0267.0834

 

CHARGE AMOUNT =$1,102.00*

 

 

NOTE: * THE CHARGE AMOUNT IS SUBJECT TO CHANGES IN THE PRICE INDEX
REFER TO LAND DEVELOPMENT SECTION BEFORE MAKING PAYMENT

The Infrastructure Charge has been calculated in accordance with the details relevant to the nominated Infrastructure Charges
Plan above and is subject to variations in the Consumer Price Index (CPI), All Groups Brisbane from December 2008 until
the date of payment. COMPOUND INTEREST AT 11% PER ANNUM WILL BE CHARGED ON ALL OVERDUE CHARGES.

 

DUE DATE FOR PAYMENT:

The Infrastructure Charge is payable in accordance with Section 5.1.10 of the Integrated Planning Act 1997 and has reference
to: 08/1867 (DA) that has a currency period until 24/03/2013

The above development permit refers to: Material Change of Use

The due date for payment is: Prior to Commencement of Use

 

PERSON TO WHOM THE CHARGE MUST BE PAID: .

Payment of the Charge must be made payable to Council via the Infrastructure Charges Admin Officer, Land Development
Section located on level 2 at the Tewantin Office, telephone (07) 5449 5139.

.

Q Notice is hereby given that the abovementioned infrastructure charges are levied by the Sunshine Coast Regional Council in compliance with the Integrated

Planning Act 1997, Chapter 5, Part 1, and by virtue of the Local Government Act ‘on land described for the period prescribed, and such charges are DUE
AND PAYABLE BY THE ABOVE DATE. These charges plus any arrears and interest thereon may be recovered by legal process without further notice if
unpaid after the expiration of the DUE DATE

 

 

 

 

 

 

John Knaggs . .
7 CHIEF EXECUTIVE OFFICER AMOUNT PAID: DATE:
Fomenmecmnnnananna neem ennnne: (cut along dotted line & submit below section with payment)---------------+--------~--
INFRASTRUCTURE CHARGES PAYMENT SLIP
Date of Payment:
Charge Notice No: IC0000842 Rev No: 0 Payee:
Reference No: 08/1867 (DA) Address:
Property Description: 403 RP 48112 Par Weyba Cty March
Property Address: 51 Elanda Street SUNSHINE BEACH QLD 4567
CODE Job No
CMRN 0012014.0267.0834 Charge amount paid = $

 

Sunshine Coast.

Regional Council

 

9 Pelican Street, Tewantin, PO Box 141, Tewantin, Q4565

 

 

Page 43

 

 

Sunshine Coast Explanatory Statement For

Regional Council

Infrastructure Charge Notice

 

PLANNING SCHEME AMENDMENT: COASTAL MAJOR ROAD
NETWORK INFRASTRUTURE CHARGES PLAN (CMRNICP)

  

The Integrated Planning Act 1997 (IPA) commenced in Morch
1998 and with it come the introduction of Infrastructure
Charges Plons, The Coastal Mojor Road Network Infrastructure
Charges Plan (CMRNICP) wos prepared in accordance with the
requirements of Chapter 5 of IPA,

The CMRNICP underwent public consultation in September and
October 2002 followed by a second review by the Department of
Local Government ond Planning. The Minister for Locof
Government and Planning issued approval of the CMRNICP on 3
Tune 2004 in accordance with conditions dated 18 May 2004,

Council adapted the amendment to the Shire of Noose Planning
Scheme, the Coastal Major Road Network Infrastructure
Charges Plan (CMRNICP) in accordance with the Minister's
conditions of approval as follows:

(i) At the Ordinary Meeting of 10 June 2004, Council
adopted the CMRNICP to epply to exempt and se/f-
assessable development. Public notice of Council's
adoption of the amendment was given on 12 June 2004
(Sunshine Coast Baily), 15 June 2004 (Noosa News) and
18 June 2004 (Government Gazette): and

ti) At the Ordinary Meeting of 14 Octeber 2004, Council °

adopted the balance of the CMRNICP applying to
assessable development. Public notice ef Councif's
adoption of the amendment was given on 22 October
2004, (Noosa News & Government Gazette) and 23
October 2004 (Sunshine Coast Dai ly).

The CMRNICP now applies to all development in the coastal area

’ of the Shire under Chopter 5 ond Section 6.2.5 of IPA (as
amended .by the Integrated Plonning and Other Legislation
Amendment Aet 2003 (IPOLAA 2003) that commenced on 4
October 2004,)

The CMRNICP was adopted on 19 January 2006 ‘as part of The
Noosa Plan - IPA Planning Scheme to include The Noose Plan Use
Classes and Definitions and taking effect on 3 February 2006.

 

 

  

 

The adopted amendment Specifically involves the introduction of
the Coastal Major Road Network Infrostructure Charges Plon
into the planning scheme.

The adopted omendment results from findings of:
* The Strategic Plan (1997);

* — Tts plonning study component Trensport 4 Road Networking
in Noosa Shire (Beard, Black & Summers 1996); and

«  Twe planning studies associated with the Choosing Futures
Process Cost Estimates for Future Road Infrastructure in
the Coastal Area of Noosa Shire (Colloghon. Toth Consulting
Engineers) and Coastol Area Troffic & Transport to 2016
(Beard 2002).

In combination, these documents find that:

* The cost of provision of road infrastructure should be borne
substantially by those making use of and causing the need for
the provision of that infrastructure,

* The read network existing at the benchmark yeor of 1998 was

adequately serving the needs of the existing community. Thot e

network did not need the substantial upgreding onticipated
under the Strategic Plan to cater for the existing community
needs,

"© The need for network upgroding is driven by future growth in
residentiot, educational, recreational ond employment-based
sectors. Consequently, development giving rise to this growth
should fund the mojority of the cost burden,

* It Is not possible to recover the full cost burden from future
development and s significant component of funding needs to
also flow fram the existing community,

An Infrostructure charging regime under the provisions of the IPA

{Chapter 5, Port 1) has been determined to be the appropriate

means of recovering the costs and to ensure the equitoble

distribution of costs between the existing and future populations
and development.

[:2:2 Pune CTLOF THE ANENDNE
The amendment applies to all lond in the coastal area of Noosa
Shire as defined by the localities of: Peregion Beach, Marcus
Beach, Costoways Beach, Sunrise Beach, Sunshine Beach, Nooso
Heads, Noosaville, Tewantin and Doonen {excluding properties In
Doonan and Tewentin that toke access to Cooroy-Noosa Read or
Eumundi Road via Sunrise Road or Tinbeerwoh Rond), refer to Map
1 .

The amendment will have the effect of ensuring thet the road

network in the coastal area of the Shire meets the needs of the.

community. It also results in future development in the coastal
grec of the Shire being required to contribute te the funding
programme,

The Coostl Major Road Network Infrastructure Charges Plan hos
as its benchmark year 1998, with its calculations based on April
thot year. Charges ore subject to variations in the Price Index
from April 1998 to that current gt the time of payment. The
current contributory retes are available from Council's Lond -
Development Section, Tewsntin of fice at Petican Street, Tewantin,

 

    

 

SUNSHINE COAST REGIONAL COUNCIL 9 Pelican Street TEWANTIN (PO Box 141 TEWANTIN 4565)

Ph: 07 5447 5139 . Fox: 07 5447 1062

E-Mail: Jeonne,dowson@sunshinecoos?,gld, Lgov.au

 

IT gt\land development \icp's \infrostructure charges issued\other docs current! lexplanatory statement « charge notice = rev Bove

mBmDHm@HWwHewkewhkWwe@Qe wee we we we h6hlUra lee lc lee

 

Page 44

 

 

 

  
     

 

 

 

r @ ANDREW BOCK ARCHITECTURE

o

eas

SOFT LANDSCAPING AREA = 396 sqm a

NOTE: LANDSCAPING SUBJECT TO FUTURE DESIGN oan
REV AMENDMENT = | CHKD DATE,

= COAST. |.
aenStinn COUN.

* TetANS APPROVED |-

   

{ coacor eosmia emt

t

 

 

 

 

 

 

ELANDA STREET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WEW K A.C TO COUNCIL REQUIREMENTS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROJECT

DUPLEX 51 ELANDA ST
SUNSHINE BEACH

LENT
Chantay Too Ply. Ltd.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DRAWING TITLE
. 4 Ground Floor Plan West

 

 

‘SCALES NORTH

$:100 &%

RN CHXD ‘DATE

we AB 47M008
i

PROJECT NO cwote SSUBREV

10

C) LEVEL 0 PLAN WEST Se 4040 DADOa

 

4:100

 

 

 

Page 45

ANDREW BOCK ARCHITECTURE

NOTE: LANDSCAPING SUBJECT TO FUTURE
Posaxtisy

sooty, ‘wogSA HEADS.
af ous?

moern H1884

rocker eptaretconay
ARCHAEG Na. 7519

REV, AMENDMENT || GHD DATE,

 

PROJECT

 

 

DUPLEX 51 ELANDA ST
SUNSHINE BEACH

' CLENT
Chantay Too Pty, Ltd.
DRAW THLE
Ground Floor Plan East
SCALES: NATH
$:100 &
‘ORAWH CAND DATE
WB AB 17110108
PROJECT KO OW KO ISSUEREV
1040 DA-D04

e LEVEL 0 PLAN EAST

1:400
® @

 

 

 

Page 46

   

meee Fe we Se & & &
, ANDREW BOCK ARCHITECTURE

‘con ST

UREV AMENDWENT = CHRD. DATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROJECT
DUPLEX 51 ELANDA ST
SUNSHINE BEACH
q CuENT
Chantay Too Ply. Ltd,
RAN TIME
Floor Plan Level 4
‘SCALES ORTH
4:100 &
DRAWN nD GATE
WB AB 17/10/08
‘
PROJECT NO owa No (ssUEREVY

LEVEL 1 PLAN

C} #2100

 

 

 

Page 47

ANDREW BOCK ARCHITECTURE

icoRoRst
@ ear

OCH 118688,

decaehdopusoatcomay
ARCHED Na 2519

REV AMENOMENT | CHK. ATE,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROJECT:

DUPLEX 51 ELANDA ST
SUNSHINE BEACH

CuENT
Chantay Too Ply. Ltd.

RAWING THLE
Floor Plan Level 2

 

 

SCALES ORT
1100 &
DRAWN cH DATE

: LEVEL2 PLAN | “8 Aa $7t0108

O 1:100 FROIEGTNO ew =e

1040 DA-D06

Fea eae Eee
ate casera Se

, @ cohen TTA

  

 

 

Page 48

ANDREW BOCK ARCHITECTURE

antcorona et
RINSE REACH
7 9 oe

Posen zts1
WOOSAHEADS

oer

Ott? T0889
SectarrhGoptinet com
ARCHED ts 2910

REV AMENDMENT =| CHD DATE,

 

PROJECT

DUPLEX 51 ELANDA ST
SUNSHINE BEACH

CUENT
Chantay Too Pty. Ltd,

 

 

DRAWING TITLE

Roof Ptan

‘SCALES HORTH

4:100 &
+

‘DRAWN HKD DATE

© - ROOF PLAN | we AB. 47/0108

1100

 

PROJECT HO Dwa ho ISSUEREY

 

 

 

Page 49

ANDREW BOCK ARCHITECTURE

AAECORONA BT
[SURSHOTE BEACH
a a7
OBOE
MOOSAHEADS
Qua?

gata M6654

poctareneptienalconey
ARGHRED Ho. 2519

AS”
. 2. [TSONSHINE COA
REGIONAL COUNC

Loe PLANS APPROY .

    

PROUECT
DUPLEX 5f ELANDAST
SUNSHINE BEACH
CUENT
rendered blockwork Chantay Too Ply, Ltd.
fibrecement
‘Sun hood ORAWRNG TILE
Ceram{o Te North Elevation
Glass
Powdercoated aluminium acreen
screen

Metal Roof.

Poo! Fence
Metal
SO0L Ratnweter Tank
Paneliit Door

  

North

 

 

C) 1100 | Ec ie rvoxeamemyonen
Seomrgmarermnsas

 

 

‘AGENT STTIRENORTA ROCK MCHATETINS HO Ts PADRE PHY.
RESID RAS ea a Ca TET

 

Page 50

meee Oe UmhlCU ECU Ce aia ee eo ho oes ae

ANDREW BOCK ARCHITECTURE

 

DUPLEX 51 ELANDA ST
SUNSHINE BEACH

CUENT

=55) Chantay Too Pty. Ltd,

THLE

 

 

 

MATERIALS LEGEND

 

Painted rendered biookwork

 

PRC

Painted florecoment sheoting

 

SH

Sun hood

 

ct

Ceramic Tite

 

Giase Halustrading

 

Powdercoated alumintum ecreen

 

au]

Timber screen

 

Motal Reof Sheeting

 

‘oP

Downpipe

 

GPF

Giass Pool Fence

 

Meta! Awning

 

wT

 

300L Retnwater Tank

 

 

 

IGPD-

Coforbond™ Paneitft Door

 

 

South Elevation
‘SCALEB NORTH
4100 &

 

DRAMA cH CATE,

WB AB 170/08
$

PROAETHO WG NO TSSUBREV

1040 DA-E,02

 

‘ye Pememoeeenrne BEPREPERBET TRAD CHEE RA OESORY ETT

 

DELLA PeCTOCRyvPeS RENT DE PICTON ERMESSEN OF ORE
Fyooed waroeven a ReStecTeDT1DE [OG GF TA NCRIDATON CED

+ | Remmortermrrousonnr scr crested Bo Pw ASC AST

TTR Rn AUER

 

Page 51

ANDREW BOCK ARCHITECTURE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DISCOROHAST
‘SUNSHINE BEACH
o mT
POBox2ise
soosattaans
one
mova Tenet
Fesrrersety
MATERIALS LEGEND
PRB Painted
PFC Painted fibrecement heating
SH [Sun hood REV AMENDHENT = HKD. DATE,
er ci Tie
jas Gian
PAS. aluminium soreen
TS Timber screen
MRS Mats! Roof Sheeting
oP Dow
GPF Glass Pool Fence
MA Metal Awning
We S001, Tank
CPD Colorbond™ Panelift Door

 

 

 

 

 

PROJECT

DUPLEX 51 ELANDAST
SUNSHINE BEACH

CUENT
Chantay Too Ply. Lid,

DRAWING TITLE
O- East East Elevation

 

 

 

 

SCALES WORTH

4100 &
+ DRAMA Cry ATE

WB Ag THO/08

PROVECTHO NO TSSUBREV

1040 DA-E.03

 

 

@ @ DONOR enter ASA TA

 

nBRHmHHmHHmHHe nHHH He HF wee a a

Page 52

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MATERIALS LEGEND:

PRB Painted rentiored blockwork
PFC Painted fibrecement sheeting
SH Sun hood

ict Ceramic Tie

eB Glass ig

PAS Powdercoated aluminium screen
TS Timber soreen

MAS: Metal Roof Shesting

oF Downpipe

GPF Glass Pool Fence

MA Metal Avening

Wr 3001, Rainwater Tank

CPD Colorbond™ Panelift Door

 

 

 

West

4:100

 

ANDREW BOCK ARCHITECTURE

274 poROMA BY
SUNOOE BEAD
<a ee
posox2s7
ROOSAHEADS
Oe?

mba S008

ARCH RED Ho, 2513,

 

PROJECT

DUPLEX 51 ELANDAST
SUNSHINE BEACH

‘CUENT
Chantay Too Pty. Ltd,

DRAWING TITLE
West Elevation

 

‘SCALES NORTH

1:100 &

oR HKD ONE
170/08

 

 

 

Page 53

t = =
pool fer & purnp
garage

 

 

Section 01°

 

 

 

 

ANDREW BOCK ARCHITECTURE
ait cononast

0, AMENDMENT, CKO DATE:
loxa “counci.ers as arm

 

 

PROJECT

DUPLEX 51 ELANDA ST
SUNSHINE BEACH

CUENT
Chantay Too Ply. Ltd.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

   

 

 

        

    

 

 

 

 

 

 

 

a DRAWING TILE
A A-Section 04
|
‘SCALES Tort
5 ices ee “f 4100 &
| pool Ber & pump. :
| a garage DRAWN CHK DATE
WB AB 28/0109
= ee EL | j
YES Sy y SSAvy oy ROIS SoS SS SSS PROJECT NO ‘BaoNO ISSUEREY
Section 01 Se ae ee oaenenmenen
1100 Scion nonaarnch onto wen eoonione anon

 

*

 

mas

Page 54

meee eee le le Oe OlClClemlCU Ce le CeCe

Q ANDREW BOCK ARCHITECTURE

2yA cone sT
SURSHNE BEKDH
@ ast

eo sc7E?
Woosh HERDS.

    

, “i OS
Nate er on

  

C) POO

PROJECT

DUPLEX 51 ELANDA ST
SUNSHINE BEACH

cuENT
Chanlay Too Pty. Ltd.

 

 

 

DRAWING TITLE
-Sectlon 02

 

‘SCALES woRTH

1100 ©

 

 

 

Page 55

ANDREW BOCK ARCHITECTURE

CORO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

zm
. *
5 - *
: oe a “Uo $ $7,980
. a, es stair oe Lt .
£00. 7 7 — a 4 ’ . . -
$4200 _ — ~ I. fe can : : el. 84,300
0 . ‘ . .
: 2 . nm : . . . _ $ 81,200
oe pe a _ —y- : = - 2,21
1 - : tee et = a j—- :
= — ry He ° 7 Caer a VT: | oo

“| Provect

 

OUPLEX 51 ELANDA ST
SUNSHINE BEACH

f GtENT

HE SY Yj Chantay Too Pty. Ltd,
QO Section 03 | samen

4:100 Section 03

 

 

 

 

 

‘SCALES. NORTH

100 &

ona xD DATE
WB AB 28/01/09
t

 

 

 

@ @ TTT reload OL WS OTRO

.
mmm HE HE HF HF FF Se Se eo ee

 

Page 56

 

co CS Co Co Oo owe eee eel lull lu) 6 lhlvlmldlhCUlmeelhUumumhlm)lhlUumc me le

Oo Oo ANDREW BOCK ARCHITECTURE

 

PROUECT

DUPLEX 51 ELANDA ST
SUNSHINE BEACH

ENT

O Section 04 — | chantay Too Py. Lid.
100
DRAWING TITLE
. : Section 04

‘SCALES WORTH

4100 &

 

 

 

 

 

Page 57

ANDREW BOCK ARCHITECTURE

2na COROMA ST
@ an

ID. «= AMENDMENT. == CHKD DATE

      

RL 451,300 -— ee
evel

 

  

 

OC Section 05 |

1:
"00 DUPLEX 51 ELANDA ST
SUNSHINE BEACH

CuENT
Chantay Too Pty. Ltd,

 

 

DRAWING TE

Section 05

SCALES — NORTH

4:100 &
* ORAWN HKD OATE

WB AB 28/01/09

+

PROJECT HO TWONG (GBVEREV

1040 DA-F.05

empRenmparemrmacr nein oun moanect en

 

 

‘AACA ACEO G METRE TO STN Yok AMEN OR ED
SGORoA eres PONE a CETTE Ap Me MIRED AT
@ @ ASTRA Aercirie fore GOA SOTA

4

 

Page 58

} @ : ANDREW BOCK ARCHITECTURE

3 ma coRoA st
GuMENE BEACH
2 a Get

Poroxart
WOOSA HES
O45iT
meta ster

‘ARCHED ho 289

 

DUPLEX 51 ELANDA ST
SUNSHINE BEACH

CUuENT
Chantay Too Pty. Ltd.

 

‘DRAWING TITLE

View from South East

SCALES. WORTH
1:100 &
‘ORAWN cHKO OATE

WB AB 170108
PROJEGTNO a RG ISSUBREV

 

1040 DA-Z.03

  

 

PRETO Mercier DS OLE MORIA

 

Page 59

 

ANDREW BOCK ARCHITECTURE

‘M4 OORORAST

NSHINE COAST
++ | pBaiGwar COUNCIL

. . | pLANs APPROVED

     

     

 

PROJECT

OUPLEX 51 ELANDA ST

SUNSHINE BEACH

CUENT

Chantay Too Ply. Ltd.

ORAWING TITLE:

View from South West 2

SCALES: NORTH
190.91 &%
‘DRAWN HKD OATE
WB AB 4740/08

 

 

 

 

Page 60

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“ ~~>E LI
e} RL 49.72 @ ANDREW BOCK ARCHITECTURE
v 2M CORPAST
%, eS
b,
PORK ITT
. fF SOONERS
aoe tees
2 OMS He 8
es re
OD
re a se DUTLINE OF PROPOSED AMENDMENT. CHD DATE
z BUILDING
° : g| Be
Re FENC = m,
te 9 \n sezet TIMBER FENCE = %
mn a7 is4
f z at ig
Ay b> 19%, 2 4 TNS fr
a Slo igo \2 “4 fr
rc Gn, | rege AB A a a 5 fe
» fa D> Me yi a ay NOE Sat fo] je
g Zz | %, ©. STEPS = 1 = =
BIN Soy aed. Cle ~
a B <= te ,
a ; s 8 1 et \ 3 Lanny ‘ = 2g
Fy ' : &
Hrs, < \ wiguseT BLOCK EF! LL Zp a
n 4 ts FL UP Sol \ "Oxy “Be fA 2 4
Rey ¢ ie L- oe pn 47.7 A PRON \ P-. 5 z
Pe \ F NOT SU —_ $
& 3 ote
8 YN cone | ---44 2
2 =a V'DAH | He
3 G, \ = j oes
a s/s
5 sy Pe, ——— | y Az
‘ i" > = a
%, =) Res con GARAGE iy = f 3 @
rage fe » SHRUB PNG Shp 5 NDI cl r-tf} & .! 3
> 499 Hee FE 4 a + Ope Qn
NCI M
| ON Boek WALL LATTICE ow BLOCK Ware GATE na S85
—— eo p TSE ER
athy CE OF BLO
ey ay wan
ey, ? a f % ae PROECT
~ . 4f150 x * Ot, DUPLEX 51 ELANDA ST
EXISTING CONC BLK Me Re, VAP Bo, SUNSHINE BEACH
we EXISTING = “SN, Cs ial
‘xIS IMBER
FENCE & >| Chantay Too Ply. Lid,
ly, zg ORAWING TITLE . 7
fe, Og EXISTING Survey Plan with Outline of Proposed Bufiding
%G, BUILDING
Me
« 8 SNES ‘WORTH
ns 1% Al ime Q
*
&
ss / DRAW oO ATE
WB 8 28/01/09
2
ho
PROJECT HO DWGNO ISSUGIREY
i

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 61

 

Knobel Consulting Pty Ltd

 

Stormwater Management Plan

Proposed Residential Duplex
Lot 403 RP48112 - 51 Elanda Street
Sunshine Beach

for Steve Rackemann

Project No: K1595-0006 5 June 2009

PO Box 3892
Burleigh Town Centre
BURLEIGH HEADS QLD 4220
T: 07 5576 4168 F: 07 5576 6477 _—_ E: [email protected]

Page 62

   

Knobel Consulting Pty Ltd

Document Control Sheet

 

 

Knobel Consulting Pty Ltd
Suite 6 - 109 West Burleigh Road
BURLEIGH HEADS QLD 4220

PO BOX 3892

Burleigh Town Centre
BURLEIGH HEADS QLD 4220

T: (07) 5576 4168
F: (07) 5576 6477
E: [email protected]

Document No: K1595-0006

Original Date of Issue: 5 June 2009

Project Manager: Trent Purdon

 

 

 

 

 

Title: Stormwater Management Plan
Author: Trent Purdon
Client: Steve Rackemann

Client Contact: Neil Stebbing

Client Reference: | 5) Elanda Street, Sunshine Beach

 

Synopsis: This Stormwater Management Plan describes the existing — site
characteristics, proposed development of the site and corresponding
stormwater quantity controls to be implemented during operational

phases of the development to ensure no increase in peak discharge.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revision/Checking History
Revision No Date Checked By Issued By
Original 05/06/09 Matt Godwin Trent Purdon
Distribution
Recipient No of Copies Method
Sunshine Coast Regional Council 3 Post
Neil Stebbing ] Post
Steve Rackemann ] Post
K1595-0006 5 June 2009 Page lof il

Page 63

 

 

 

 
  
 
 
 
 
 

 

 

 

 
 
 
  
 
  
  
 
 

 

 

 
 

  
 

STEVE RACKEMANN KNOBEL CONSULTING PTY LTD
Proposed Duplex Stormwater Management Plan
Lot 403 RP48112 - 51 Elanda Street Project No: K1595
Sunshine Beach
Contents
1.0 Introduction |
Background . |
1.2 SCOPE iecccrrsesrrereees ]
1.3 Description of Subject Site. ]
1.3.1 LOCATHON wee }
1,32 Site Topography....... 2
1.3.3 Vegetation and Land Use. 2
1.4 Description of Development . 3
2.0 Site Hydrology and Hydraulics.. 3
2.1 BACKQFOUN woes 3
2.2 Catchment Definition we
2.3 Rational Method wd
2.3.1 Coefficient of Runoff. 4
3.0 Sediment and Erosion Control 5
3.1 Construction Phase... 5
3.1.1 Key Pollutants.. 6
3.1.2 Performance Criteria .. 6
3.1.3 Sediment and Erosion Controls... are}
3.1.4 Water Quality Monitoring and inspections. 7
3.1.5 Reporting. 7
4.0 Conclusions .. 8
§.0 References.... 8
Figures
Figure 1: Google Cadastral Extract
Figure 2: Aerial Photograph of the site (Google Earth)....
Tables
Table 1: Post Development Design Flow Rate for Site Catchment...
Table 2: Key Pollutants, COnstructlon PASC...
Table 3: Construction Phase, Water Quality Performance Criteria...
Appendices

Appendix A- Donald James Colston, Contour & Detail Survey Over Lot 403 on RP48112 at 51 Elanda Street,

Sunshine Beach (Ref: 22046-1C)

Appendix B- Andrew Bock Architecture, Site Plan (Ref: 1040-1-A)
Appendix C - Knobel Consulting Pty Ltd, Pre and Post Development Impervious Area Layout Plan (Ref:

K1595/SW002/A)

Appendix D - Knobel Consulting Pty Lid, Stormwater Layout Plan (Ref: K1595/SW001/A)
Appendix E- Knobel Consulting Pty Ltd, Sediment and Erosion Control Layout Plan & Details Sheet Ref:

K1695/SEOO1/A)

 

K1595-0006

5 June 2009 Page ii of li

Page 64

STEVE RACKEMANN KNOBEL CONSULTING PTY LTD
Proposed Duplex Stormwater Management Plan
Lot 403 RP48112 - 51 Elanda Street Project No: K1595

Sunshine Beach

1.0

Introduction

 

1.1

1.2

1.3

1.3.7

Background

Knobel Consulting Pty Ltd has been commissioned by Neil Stebbing & Associates Pty Ltd to prepare
a Stormwater Management Plan (SWMP) for a proposed residential duplex on Lot 403 RP48112, 51
Elanda Street, Sunshine Beach (the subject site).

In preparing the SWMP Knobel Consulting Pty Ltd has considered stormwater quantity
management during the operational phase to ensure no net increase in runoff from the site and
sediment and erosion controls during the construction phase. This report has been produced to
address conditions 25, 26, 37 and 39 of Council’s Material Change of Use approval for the site
dated 24 March 2009.

Scope

This SWMP aims to:

« — Establish the required performance criteria for the proposed stormwater quantity system;

» Provide detailed design of stormwater infrastructure within the site;

= Ensure stormwater runoff Is conveyed from/through the site to a legal point of discharge
without adversely affecting both upstream and downstream flood levels;

* Provide detailed design and calculations to determine if detention is required to mitigate post
development flows, and

» — Ensure the quality of stormwater runoff discharging from the site during the construction phase
does not adversely impact on water quality and ecological values of downstream

watercourses.

This SWMP is in accordance with the IEAust, (National Committee on Water Engineering). Australian
Runoff Quality (Draft) and the Queensland Urban Drainage Manual (QUDM).

Description of Subject Site

Location

Figure 1 shows the subject site that is located at 51 Elanda Street, Sunshine Beach.

The subject site covers an area of 755 m2.

 

K1595-0006 5 June 2009 Page 1 of 8

Page 65

STEVE RACKEMANN KNOBEL CONSULTING PTY LTD
Proposed Duplex Stormwater Management Plan
Lot 403 RP48112 - 51 Elanda Street Project No: K1595

Sunshine Beach

 

 

 

 

 

 

 

Figure 1: Google Cadastral Extract

1.3.2 Site Topography

The subject site falls steeply away from Elanda Street as is shown on the Donald James Colston,
Contour & Detail Survey Over Lot 406 on RP48112 at 51 Elanda Street, Sunshine Beach (Ref: 22046-
1C€) Included as Appendix A.

1.3.3 Vegetation and Land Use

Site inspection confirms that a residential dwelling and associated hardstand currently exists on the
site.

An aerial photograph showing the current dwelling is provided in figure 2 below.

 

K1595-0006 5 June 2009 Page 2 of 8

Page 66

 

STEVE RACKEMANN KNOBEL CONSULTING PTY LTD
Proposed Duplex Stormwater Management Plan
Lot 403 RP48112 - 51 Elanda Street Project No: K1595

Sunshine Beach

   
  

 
 

; Pet ta
» |. y pte —
OO Tae CEE als cara FERETIE)

Ge °

    
  

ae,

   

pa A sce a ee ThE es,
Brroneh rss rh yok yd PS eel re Eee kt

Figure 2: _—_ Aerial Photograph of the site (Google Earth)

 

 

1.4 Description of Development
With reference to the Andrew Bock Architecture, Site Plan (Ref; 1040-1-A) included as Appendix B,
a duplex is proposed to be built on the subject site.

2.0 Site Hydrology and Hydraulics

2.1. Background
The proposed duplex is to be constructed in place of existing residential dwelling.

K1595-0006 5 June 2009 Page 3 of 8

Page 67

STEVE RACKEMANN KNOBEL CONSULTING PTY LTD
Proposed Duplex Stormwater Management Pian
Lot 403 RP48112 - 51 Elanda Street Project No: K1595
Sunshine Beach

 

Legal Point of Discharge

It is proposed to discharge piped stormwater drainage from the site to the existing field inlet
located within the pathway to the south east of the site. Overland flows will continue to discharge
as sheet flow to the rear of the property,

 

2.2 Catchment Definition
The subject site has one (1) catchment area corresponding to the site area, Stormwater runoff
from properties to the North currently discharge to the rear of those sites. Any flows that
discharged onto the subject property will continue to do so with the addition of the new
development as construction is offset from the boundary atlowing flows to enter the subject site
unimpeded.
The Internal catchment covers 755 m? and to provide accurate pre and post runoff flows the
fraction impervious of the existing case and that of the proposed duplex have been calculated.
2.3 Rational Method
2.3.1 Coefficient of Runoff
A coefficient of runoff (Cyear) was calculated for the associated catchments based on an analysis
of the land and the fraction impervious of the existing and proposed arrangements.
Pre Development
Impervious Area - 326m? (From survey)
Fraction Impervious = 43.0%
C10 = 0.79 (QUDM 2007 Table 4.05.3(a))
Post Development
Impervious Area - 393m2 (From Design)
Fraction Impervious = 52.0%
C10 = 0.80 (QUDM 2007 Table 4.05.3(a))
The pre and post development impervious areas are shown on Knobel Consulting Pty Ltd drawing,
Pre and Post Development Impervious Area Layout Plan (Ref: K1595/SWO002/A) included as
Appendix C.
K1595-0006 5 June 2009 Page 4of8

Page 68

STEVE RACKEMANN KNOBEL CONSULTING PTY LTD
Proposed Duplex Stormwater Management Pian
Lot 403 RP48112 - 51 Elanda Street Project No: K1595

Sunshine Beach

3.0

Time of Concentration
A minimum time of concentration of 5 minutes has been adopted for the pre and post
development scenarios. Rainfall intensities were obtained from Council Standard Drawings 9231.

Design Flow Rates
Design storm flow rates have been calculated for storms with an ARI of 10 and 100-year intervals
and are provided in Table 1. The Rational Method provides a basis for assessing the design peak
flow rate to enable the determination of the sizes for inlets, pipes and culverts and the dimensions
of open channels.

The Rational Method (Q = 2.78 x 10-3 CIA) has been used to calculate the required design flow
rates for the subject site.

 

 

 

 

 

Table 1: Post Development Design Flow Rate for Site Catchment
Average Recurrence Interval ARI | Pre@io |, Post@io | Pre Qioo | Post Qico ”
CoefficientRunoff SSCS Cc ove | 080 0.95 0.96
Area of Catchment (ha) . "as A 0.0755 0.0755 0.0755 0.0755
“Average Rainfall Intensity (mm/h) ! 225.0 225.0 320.0 320.0
Peak Flow Rate (L/s) a 37.3 378 63.8 64.4

 

 

 

 

 

 

 

 

Table | shows that the post development flow rate is approximately equal to the pre development
flow rate. It is not considered necessary to provide detention given the minimal difference in flow
rates, As there will not be any increase in flows to the existing stormwater system and further

analysis is not required,

Knobel Consulting Pty Ltd drawing, Stormwater Layout Plan (Ref: K1595/SW001/A) included as
Appendix D shows the proposed internal stormwater drainage layout and proposed connection to
Council's system. The internal works have been designed by Dennis Cairns and Associates

Hydraulic Consultants.

Sediment and Erosion Control

 

 

3.1. Construction Phase
Details of the construction phase sediment and erosion controls, monitoring and maintenance are
provided in the following sections.

K1595-0006 § June 2009 Page 5S of 8

Page 69

 

 

 

 

 

 

 

 

 

 

 

 

f STEVE RACKEMANN. KNOBEL CONSULTING PTY LID
Proposed Duplex Stormwater Management Plan
B Lot 403 RP48112 - 51 Elanda Street . Project No: K1595
Sunshine Beach
n 3.1.1 Key Pollutants
™ In accordance with Table 13.1.C (GCCC Draft WSUD Guidelines, 2007) the following key pollutants
= have been identified for the Construction Phase of this development.
Table 2: Key Pollutants, Construction Phase
‘Pollutant « Sources a | :
” Litter Paper, construction packaging, food packaging, cement bags,
vs material off cuts.
Sediment Exposed soils and stockpiles during earthworks and building works,
Hydrocarbons Fuel and oil spills, leaks from construction equipment and temporary
ra car park areas.
. . Cement slurry, asphait primer, solvents, cleaning agents, and wash
= Toxic Materials waters (eg, from tile works).
Acids or Alkaline . .
substances Acid sulphate soils, cement slurry and wash waters.
3.1.2 Performance Criteria
In accordance with Table 13.1.A (GCCC Draft WSUD Guidelines, 2007) the following site discharge

 

pollutant criteria have been identified during the construction phase of the development.

Table 3: Construction Phase, Water Quality Performance Criteria

 

 

 

 

 

 

 

 

Pollutant Ciiteia

Total Suspended Solids 90th Sile <5Omg/L

pH 6.5 -9.0

Dissolved Oxygen 90" %ile >80% saturation or 6mg/L

Hydrocarbons No visible sheen on receiving waters

litter No visible litter washed from site,

Cations and Anions np cable to Development, Sulphate Soll Management Plan (If

 

 

 

3.1.3 Sediment and Erosion Controls
Sediment and erosion control devices G&EC) employed on the site shall be designed and
constructed in accordance with the Institution of Engineers, Soi Erosion and Sediment Control
Guidelines (IESESC) as shown on Knobel Consulting Pty Ltd drawing, Sediment and Erosion Control
Layout Plan & Details Sheet (Ref: K1595/SE001/A) included as Appendix E.

During construction, all areas of exposed soils allowing dust generation are to be suitably treated.
Treatments will include covering the soil and watering. Road accesses are to be regularly cleaned
to prevent the transmission of soil on vehicle wheels and eliminate any build up of typical road dirt
and tyre dusts from delivery vehicles.

 

co co OoOlLUrllhlUmelhlUn eC Cue ee le) lai

 

K1595-0006 § June 2009 Page 6 of &

 

 

a)

Page 70

 

 

 

Ho OO | oe! CU hUolCUc)lCUclClcl Ucn)

 

ow

 

0

O

STEVE RACKEMANN KNOBEL CONSULTING PTY LID

Proposed Duplex Stormwater Management Plan
Lot 403 RP48112 - §1 Elanda Street Project No: K1595

Sunshine Beach

3.1.5

Adequate waste disposal facilities are to be provided and maintained on the site to cater for all

waste materials such as litter hydrocarbons, toxic materials, acids or alkaline substances.

Water Quality Monitoring and Inspections

To ensure that the water quality objectives are being met during the construction phase of the
development water quality monitoring shall be conducted at a monitoring station as shown on
Knobel Consulting Pty Ltd drawing. Sediment and Erosion Control Layout Plan & Details Sheet (Ref:
K1595/SE001/A).

Water quality monitoring shall use a calibrated probe or sampling and testing at a NATA registered

laboratory.

Location: Monitoring Station MS1 is shown on Knobel Consulting Pty Ltd drawing, Sediment
and Erosion Control Layout Plan & Details Sheet (Ref: K1570/SE001/A).

Parameters: Site discharge criteria.

Frequency: Following at least 30 mm of rainfall in a 24 hour period.

The contractor shall be responsible for the inspection and maintenance of all sediment and erosion
control devices. Additional controls and review of existing controls shall be undertaken in response
to the results of the above-mentioned monitoring program,

Reporting
An inspection report shall be written by a suitably qualified and experienced scientist/engineer
following each water quality monitoring episode. The report shall include at least the following

information.

= Name, address and real property description for the development site;

= Council file reference number (if known);

* Monitoring locations;

«Performance criteria;

« — Results for each monitoring location, identifying any breaches of performance criteria, and

» Recommended corrective actions to be taken and additional sediment and erosion controls, if

required.

Inspection reports shall be provided to the contractor for their action and compilation in an on-site

register.

If the above-mentioned performance criteria are exceeded and results from the downstream
monitoring stations show significant deterioration from upstream results Gf applicable), the
contractor shall implement all recommendation of the inspection report within one (1) working day
of receipt of the report.

 

K1595-0006 § June 2009 Page 7 of 8

Page 71

STEVE RACKEMANN KNOBEL CONSULTING PTY LID
Proposed Duplex Stormwater Management Plan
Lot 403 RP48112 ~- 51 Elanda Street Project No: K1595

Sunshine Beach

 

4.0 Conclusions

 

Knobel Consulting Pty Ltd has analysed the pre and post development stormwater discharge from
the site and determined that no detention is required as the proposed development does not
increase peak flow rate from that of the pre development scenario. The legal point of discharge for
the site shall be to the existing field inlet to the south east of the site with overland flows continuing
to discharge as sheet flow to the rear of the site.

Sediment and Erosion Control measures have been proposed for the construction phase to ensure

no adverse impacts on downstream water quality.

5.0 References

 

* — Australian Rainfall and Runoff (ARR) - Volume 1 Book 2 - Design Rainfall Considerations

= Queensland Urban Drainage Manual (QUDM) - 1992

 

K1595-0006 5 June 2009 Page 8 of 8

Page 72

STEVE RACKEMANN

Proposed Duplex

Lot 403 RP48112 - 51 Elanda Street
Sunshine Beach

KNOBEL CONSULTING PTY LTD
Stormwater Management Plan
Project No: K1595

APPENDIX

A

Donald James Colston

Contour & Detail Survey Over Lot 406 on RP48112 at
51 Elanda Street, Sunshine Beach

(Ref: 22046-1C)

 

K1595-0006

5 June 2009

Page fof v

Page 73

yondid yames Lolaton Cadastral Surveyor

     
            

Quemsiond 4573
rene (07) 547171
tau Sear 701 368,
‘enol ccoptbigpond.con
’

C\Dwg Standard\colston letterhead top b.jpg

 

urveyor {certified pract

consutting 61

 

CONTOUR &
DETAIL SURVEY

over
Lot 406 on RP48112
o

i
§1 ELANDA STREET
SUNSHINE BEACH

: WER,
= a 5 —_ Sey
pot TT at eo ts my

saree ey on
ay

 

 

2 ~

 

ee

‘SAK S2S\Coonttants’Surweyi0e-05-t4iEbanda EXTRA Road Surv Addiad up, ¥06/2000 4:15:06 Ph, tendp, Yenobet¥Od_C4S0_PS

 

NOSHYZONFH

     

:
: Bs
g) &e

3 Sei Sw Pr
ria /Hote :
(eee Phy

 

Page 74

STEVE RACKEMANN

Proposed Duplex

Lot 403 RP48112 - 51 Elanda Street
Sunshine Beach

KNOBEL CONSULTING PTY LTD
Stormwater Management Plan
Project No: K1595

APPENDIX

Andrew Bock Architecture
Site Plan
(Ref: 1040-1-A)

 

K1595-0006

5 June 2009 Page ilofv

Page 75

andr uw Bock Architecture :
Or

2/14 CDRONA ST. SUNSHINE BEACH QLD 4567 AUSTRALIA
M0412 116686 P 6175455 4840 F 6175449 2947
[email protected]

Board of Architects Reg, No. 2519

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COPYRIGHT ALL RIGHTS RESERVED, THIS WORK IS

REV] AMENDMENT CHKD [DATE
A
PROJECT
Duplex 51 Elanda St, Sunshine Beac
»
CLIENT
@ i Lazarides
SK.01 Site Plan 1:200
DRAWING TITLE
Site Plan
| SCALES TNORTH
. { 1:200
| DRAWN/CHKD DATE ]
{ WB/AB Shae sday, 8 May
{ PROJECT NUIDWG NO TISSUE/REV
, | 1040 4 A
; EEC? RUPER,RMENSI SNS PREREPERES: ASEAN on

:
i
3
z
a
;

 

ee 11 FAL NS UncoenHOR. SZ CAD FILEPATH 500GB HDD #1\UserswilllanberryDocumet

DRAWINGS IN PROGRESS | |Beeeeee*

Page 76

STEVE RACKEMANN
Proposed Duplex

Lot 403 RP48112 - 51 Elanda Street

Sunshine Beach

KNOBEL CONSULTING PTY LTD
Stormwater Management Pian
Project No: K1595

APPENDIX

Cc

Knobel Consulting Pty Ltd

Pre and Post Development Impervious Area

Layout Plan
(Ref: K1595/SW002/A)

 

K1595-0006

5 June 2009

Page iil of v

Page 77

LEGEND

 

PRE DEVELOPMENT IMPERVIOUS AREA - 327m?

 

 

POST DEVELOPMENT IMPERVIOUS AREA - 393m?

 

 

 

ELANDA\STREET

/

A 206-00 | ISSUED FOR CLUSION IN REPORT
GSSUENA} DATE ANENOMEN

ZAKLS@S\Constructori WGK 1505-SWO02-A dug, 2006/2009 91074 AM, evan, adobe pt

x

2&

KNOBEL CONSULTING PTY LTD
ENGINEERS - PROJECT MANAGERS

Phone: 07 S576 4168 8/109 West Burleigh Road
Fex 07 8576477 Burleigh Haads QLD 4220
Email: [email protected] ‘ABN 33 071 435 202

‘CUENT
STEVE RACKEMANN
PROJECT
PROPOSED DUPLEX
51 ELANDA STREET.
SUNSHINE BEACH, QLD

402
IRP48112

}
j
;
'
!

404
RP48112

 

Tme

PRE AND POST DEVELOPMENT
IMPERVIOUS AREA
LAYOUT PLAN

SAE 4100aTAl ° 2 4 6 &

"9
a

10m

1200 AT AS SS  ———

 

382
RP48112

000
GTP 689

PROJECT NO.

K1595

Dwano, | ISSUE

Swo02| A

 

Page 78

STEVE RACKEMANN

Proposed Duplex

Lot 403 RP48112 - 51 Elanda Street
Sunshine Beach

KNOBEL CONSULTING PTY LTD
Stormwater Management Pian
Project No: K1595

APPENDIX

D
Knobel Consulting Pty Ltd

Stormwater Layout Plan
(Ref: K1595/SWO001/A)

 

 

1595-0006

5 June 2009 Page lv of v

Page 79

7

 

         

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

  

ee eee

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

t
t
= 7
tr
:
‘
402
RP48112 382
CS x RP48112
NY
= {
Rae %
, <o Ta, i q
i@r2s 00 =
147.00 witha i
ot eS l
x we vos P
ws i
OVER
Ut Se ETAL % ayer THANK
RU a . | 5000!
( | —*]
41.48.1795 w.44.700 a
yA 1.48.035° qe
so e. 4.800 4 2
7 44 I
RL.47 100) 2 [tT l
3 [HF
I
. _a et eH
soon 80 PROPOSED se] Boge pyres 148
0? Gant - QUPLEX F ee
108, 1A va | —"| Nin f
i} |S 000
ic7 00 ‘ p—ansifoo | GTP 689
t
” i
%
~ { RL 4B\HO0 ;
Bi A700 some care a Wh sen 5/9 (059 =D a |e | ee
t
i
| RMWATER PIT
0 LA8.97 I 43.96
: 4 1.42.93
oft 1x (103) x L
SDT * a - came
Ge i La —
----f-------' aH — ores ee fe- a -a---- me 109,
T me) 1 1 not ‘ a? TRI se
| i ft 1 ou 4 WANS
aa npen nena ne t---p--~----JL---jr ----f b-day SE Lio? —
. Saigo, Ws
\ CONNECT TO EXISTING _// STORMWATER MH SSeS
COUNCIL PIT AND MAKE 8.43.63 SA Pon
; GOOD CONNECTION Lazio / BL,
~ NON. ~
| EXISTING 300 PIPE sag esd
sO
we
CONTINUES TO HENDERSON ~~,
404 STREET PIPE SYSTEM.
RP48112
INTERNAL STORMWATER DESIGN :
BY DENNIS CAIRNS & ASSOCIATES ‘
" CUENT DESIGN DRAWN [APPROVED | TITLE PROJECT NO.
KootniConssirerys  KNOBEL CONSULTING PTY LTD (“or ive RACKEMANN P UBS STORMWATER LAYOUT PLAN
ENGINEERS - PROJECT MANAGERS ~— [racer SWunSER RPE NRE : K1595
. PROPOSED DUPLEX ' DWGNO. | ISSUE
A | toes | SSUEDFOR APPROVAL Pee” or sere eer? Buntaigh sieads GA 4200 51 ELANDA STREET, SCALE 4400ATAI 9 2 4 8 8 10m
‘SSuEm) GATE ENMENT a Emal: [email protected] ABN 33071 435202 | SUNSHINE BEACH, QLD pienso 1200 AT A3 —————————————— Swo0i| A
2 ———

 

‘AKI S05\ConsiructorM WEI ISES SYIOOT-A.dtig, 20062000 £02551 AM, event, eccbe pot

 

Page 80

STEVE RACKEMANN KNOBEL CONSULTING PTY LTD
Proposed Duplex Stormwater Management Plan
Lot 403 RP48112 - 51 Elanda Street Project No: K1595
Sunshine Beach

 

APPENDIX

E
Knobel Consulting Pty Ltd

Details Sheet
(Ref: K1595/SE001/A)

 

K1595-0006 5S June 2009 Page v of v

mmm Em meme hlaeehllCUeellCUmeUeeCmeellCmeeeee ee eel

ane SeIMENt_and.Erosion.Control Layout Plan &

Page 81

 

 

 

  

PROPOSED *

 

 

{
i

43

%y
ae

\
145,
\
= \.

7.20055
£222

Ry * |

ae eceee cc
7 ¥
—
4d —

 

 

 

 

 

 

 

 

 

 

 

 

$8, Po,
” nanos ROAD, A BUND 19?

 

ENTRY/EXIT PAD FALL:

TO BE INSTALLED ACROSS
THE AGGREGATE PAD TO

DIRECT RUNOFF TO
SEDIMENT FENCE

40-75mm CRUSHED ROCK
OR RECYCLED CONCRETE

     

       

LEGEND i

—/——- + ———__ SEDIMENT FENCE

——_sFw -—; SEDIMENT FENCE WEIR

> —> ——> — >, TEMPORARY DIVERSION DRAIN

SEDIMENT AND EROSION CONTROL NOTES

1

 

STABILISED ENTRY/EXIT POINT - TYPE A

 

NTS OR APPROVED EQUIVALENT

DENOTES STABILISED ENTRY/EXIT
POINT, REFER LAYOUT PLAN FOR
LOCATIONS.

 

 

 

SEP

 

 

[~>———et
>

  

 

 

 

 

 

 

 

 

 

 

 

 

 

. PONDED RAINFALL SHALL BE PUMPED THROUGH A SEDIMENT FENCE LOCATED ON THE SITE

i
STABILISED ENTRYEXIT POINT

 

Yr
ZF | CONFINED WASTE DISPOSAL AREA
LL

S14
+

WATER QUALITY MONITORING STATION

THE PROJECT SEDIMENT AND EROSION CONTROL DRAWINGS ARE TO BE READ IN CONJUNCTION
WITH THE SITE'S APPROVED STORMWATER MANAGEMENT PLAN.

CONSTRUCTION IS TO BE PROGRAMMED TO PROVIDE INSTALLATION OF PERIMETER
LANDSCAPING / SURFACE TREATMENTS AS EARLY AS PRACTICAL.

THE CONTRACTOR'S WORKS PROGRAM IS TO BE REVIEWED AT THE PRESTART MEETING.
ALTERATIONS TO THE PROGRAM MAY BE REQUIRED TO ENSURE SATISFACTORY EROSION AND
SEDIMENT CONTROL.

SAFETY ISSUES MUST BE CONSIDERED AND MONITORED FOR EACH DEVICE TO THE
SATISFACTION OF THE SUPERINTENDENT.

SEDIMENT FENCE FILTER FABRIC IS TO BE APPROVED BY THE ENGINEER.

SEDIMENTATION MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF
CONSTRUCTION ACTIVITIES AND MAINTAINED AT A SUITABLE LEVEL/ CONDITION THROUGHOUT
CONSTRUCTION.

SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED BY 30%.

DRAINAGE STRUCTURE PROTECTION IS TO BE CLEANED FOLLOWING EACH SIGNIFICANT RUNOFF
PRODUCING STORM.

ACCESS TO THE SITE IS TO BE PROVIDED BY THE CONTRACTOR. APPROVAL IS TO BE OBTAINED
FROM SUNSHINE COAST REGIONAL COUNCIL FOR THE LOCATION OF THE SITE ACCESS POINT
AND WASH DOWN AREA WHICH IS TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION
PERIOD. ACCESS TO AND FROM THE SITE IS TO BE VIA THE SHAKEDOWN FACILITY ONLY. ALL
VEHICLES ARE TO BE WASHED DOWN PRIOR TO LEAVING THE SITE. wage

THE CONTRACTOR SHALL PROVIDE TEMPORARY DRAINAGE CONTROLS TO DIVERT FLOW FROM
UNDISTURBED AREAS AROUND DISTURBED AREAS AND DIRECT FLOW FROM DISTURBED AREAS
TOWARD CONTROL DEVICES.

BEFORE DISCHARGING INTO THE DOWNSTREAM STORMWATER SYSTEM.

STRAW BALES USED IN SEDIMENT DEVICES ARE TO BE REPLACED AFTER A MAXIMUM SERVICE
PERIOD OF 6 WEEKS.

 

 

 

   

 

 

 

         

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WIRE FILTER CLOTH WIRE CLOTH CLIPPED. FILTER CLOTH . PROVIDE TOPSOIL LAYER FILTER CLOTH :
TO EACH STAKE AT 600 CRS \ ie OVER FILTER CLOTH FOR t LAP 100mm WEIR TO BE 600mm —}-—————~|_] REFER LAYOUT PLAN FOR SURFACE
aeseap =a a ee — Aaa = > FULL LENGTH OF SILT FENCE WIDE UN.O. ON TREATMENT AT WEIR OUTLET
; * + LAYOUT PLAN
ag +
3 ig
ROAR . “

PROVIDE WIRE STRAND 50 x 50 HW STAKES pS 5G

BETWEEN STAKES FOR OR STAR PICKETS CONSTRUCT WEIR WEIR HEIGHT TO BE

FILTER CLOTH SUPPORT b SECTION SiMBAR TO SEDIMENT Y 450mm U.N.O. ON LAYOUT

FENCE PLAN
ELEVATION
; ELEVATION
SEDIMENT FENCE DETAILS “ENCE REFER LAYOUT SEDIMENT FENCE WEIR
wes DENOTES SEDIMENT , REFER NTS” —7——Tsew — DENOTES SEDIMENT FENCE WEIR, REFER LAYOUT
PLAN FOR LOCATION AND EXTENTS. \ PLAN FOR LOCATION AND EXTENTS.
LENT : DESIGN DRAWN, APPROVED — | TITLE t PROJECT NO.
Sar pepegege “NOBEL CONSULTING PTY LTO | steve RaCKEMANN 1P EL SEDIMENT AND EROSION CONTROL
ENGINEERS - PROJECT MANAGERS = feaoccr CWHAGER- RPEO MABER 658 LAYOUT PLAN & DETAILS SHEET K1595
PROPOSED DUPLEX DWGNO. | ISSUE
Phona: 07 5576 4168 ef09 Burleigh -
A z.0603 | ISSUED FOR APPROVAL Fac or S876 ear? Bursigh Heads OFD 4200 51 ELANDA STREET. SCALE 4125ATAL 0 5 10 seo01|] A
eae) ane ENT Emak [email protected] ABN 33071435202 | SUNSHINE BEACH, QLD = ip fe DA
7

 

 

 

 

 

 

 

 

ZAKI S@S\Constructoni WCW 506-SENO 1A the, 20/2008 9:07:25 AM, evan, adobe pol

Page 82

 

   

 

 

 

 

7 7 ——7
/ / — LEGEND: ~ SeweaM ‘
. / a i 3
X Jf [===] 1.5m WIDE 100mm THICK SL72 MESH CONCRETE FOOTPATH ~-~-s—-—— _ EXISTING SEWER MAIN IL. 41.474
, " IN ACCORDANCE WITH IPWEAQ STD DRG SEQ R-065 _ eyo = EXISTING STORMWATER DRAINAGE
i nA (SSRN) PAVEMENT WIDENING REFER DETAL ew” —_ |
v I I {
CONTRASTORITO CONFIRM\ m ” . __._EJ_____ CONCRETE PAVEMENT EXPANSION JOINT IN FOR ROADWORKS NOTES REFER DWG R002 * t
LOCATION OF Ald SERVICES, Be \\y ACCORDANCE WITH IPWEAQ STD DRG SEQ R065 {Ff jest / ‘h 4 ve
PRIOR TO COMMENCEMENT S. _ ' Ze Fon, ~ / !
OF WORKS ~_\% Meee _-—_DJ____ CONCRETE PAVEMENT DUMMY JOINT IN 2 Ao5| 3
: py) \ > , iw ACCORDANCE WITH IPWEAQ STD DRG SEQ R-065 ~ on 7 = j
e n \ we - \ _— 1
3 WS | < +i PROPOSED FINISHED KERB LIP LEVELS \ ( z
wal; a < Fi els
/ “ ING PEN ¥ \ \ a
J m , exeT J BE ae et 3 é&
EXISTING POWER PQLE —~\_ \ | g4

ha

/

a
\.

/

MATCH NEATLY TO EXISTING DRIVEWAY
PROVIDE SLAB THICKENING JOIN TO
EXISTING WITH 812 DOWELS, 400mm
LONG AT 600 crs’

NEW TYPE M1 KERB FOR FRONTAGE
OF SITE. JOIN NEATLY TO EXISTING
KERB AT BOTH ENDS

j

ONTRACTOR TO REMOVE SHRUBS AS ——"~~ --——
REQUIRED TO CONSTRUCT FOOTPATH

~ ameoteet uma teed oe

REDUNDANT CONCRETE WITHIN VERGE TO BE
“REMOVED OFF SITE, VERGE TO 8E TRIMMED & TURFED
WITH WEED FREE COUCH ON COMPLETION OF WORKS. \

nena sated

THE CONTRACTOR SHALL UNDERTAKE ADJUSMENT/MODIFCATION | 1
n> TO EXISTING INFRASTRUCTURE & SERVICES TO FACILITATE ROAD i
is WIDENING & FOOTPATH CONSTRUCTION.

ge + /
' {4 L \
* DRIVEWAY SITE DISTANCE
TRIANGLES

         

SLD

 

\ |

Ley

|) ero

1 oY
\ \,

  
      

= DUPLEX

 

      

 

            

 

 

        

if

-EXTENT.OF PROPOSED S|

s~— ~~

mo TS ts

 

 

Sos

ee.
|

 

 

 

 

 

 

|

\

REFER R002 FOR SEWER
ZONE OF INFLUENCE

;
|

~ 43

 

 

—

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       

 

 

 

 

    

 

 

 

 

 

               

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24 150s Conactructon TW SES-RODT-E.thg, 11/06/2009 HAE AM, ban, Tkncbetsne'Q_C3G2 CAD

 

\ 8.0m. \ | ‘
—a=- —— # co 2 SEWER M/H
Va NAL 8b ae
frre NA tL. 41.21
‘SHRUBS TO BE REMOVED TO ACHIEVE STORMWATER PiT T
SITE DISTANCE _| SL 43.96 | Ssy
N IL 42.93 _— ~~ ee
3.5m WIDE, 125mm THICK, SL72 MESH DRIVEWAY IN | 7 <a -
ACCORDANCE WITH IPWEAQ STD DRG SEQ R-050 STORMWATERMM aE Sp, —_—
Ta fi ~—e
ii WIDEN PATH FROM EXISTING APPROX 1.2 TO 1.5m SL 43.63 “8h ? mS
Ns é OVER 2m TO PROVIDE SLAB THICKENING JOIN TO pees HL 42D ~ Nf
WW L4 EXISTING WITH @12 DOWELS, 400mm LONG AT 600 crs’ 30mm ASPHALT. ON AMCO PRIME 4.0L/n? SS “f
[TT eneann |= SAWCUT EXISTING ASPHALT REFER PAVEMENT ‘25mm CBR 80 CLASS 1A CONTINUES TO Heoenson "> x.
- .
7 JOINTING DETAR. so5mmn CBR 45 CLASS 2 STREET PIPE SYSTEM S
SN L ~= Za
a / 150mm CBR 15 CLASS 3
“ / |
| NOMINAL 1.5m OR AS VARIED TO AVOID POWER POLE , *
| 2h LIP OF KERB TYPICAL PAVEMENT CROSS SECTION DETAIL
@ [ *% SUBJECT TO TESTING, SCALE 1:10
. 9.150 | —
—— si [--—-——_ EDGE OF EXISTING PAVEMENT
WL slecgioe/~/—L =| 0.300 . 0.300
. 0.050 . 0.275 ! 0278 ——|
g |-— SELECT FREE DRAINING NON PLASTIC | VERTICAL CUT 1 \ | EXSTING SURFACING
: FILTER MATERIAL
° EXISTING PAVEMENT
ORR RG
Z STS IEISTING PAVEMENT] SCO
= | = }-@100uPVC CORRUGATED AND SLOTTED CLASS 1000 3 OOPS SSK
eee
t POLYETHYLENE DRAINAGE PIPE WITH GEOFABRIC le Ss CE x RESAAES XK
0.300MIN. | SOCK. JOIN TO CONNECTING SIDE DRAINS WHERE PS YY YYYYYYYYYYWYDOY DS
P le ROR UOC CR
KERB & PAVEMENT SIDE DRAIN DETAIL iS
NOTE: 1 TYPICAL JOINT DETAIL AT FLEXIBLE PAVEMENTS
PAVEMENT & KERB TYPE SHOWN ARE INDICATIVE ONLY. SCALE 120
SIDE DRAINS TO BE PROVIDED BENEATH ALL KERBERB &
CHa Peon KERB TYPE M1
{ 1:5ATAI
(CUENT 7 DESIGN DRAWN JAPPROVED. TMmeE PROJECT NO.
KeobelConsnoryit  KNOBEL CONSULTING PTY LTD STEVE RACKEMANN 1P uF | hf ROADWORKS LAYOUT PLAN K1595
ENGINEERS - PROJECT MANAGERS = [Eagar CWHAGER RPEO. MARES .
8 c2c609 | TITLE BLOCK AMEXDED - . PROPOSED DUPLEX . Bweno. | issue
7» | 20502 | SSSUED FOR APPROVAL = Fon gy ssveoer7 Buren Heese ok aoe 51 ELANDA STREET, SCE S:400ATAT 0 2 4 6 8 10m R001 | B
SUE Ka | GATE AMENDMENT ~ Emak [email protected] ABN 33071 435202 | SUNSHINE BEACH, QLD 02-06-09 $200 AT AS CER ep emer,

Page 83

 

ROADWORKS NOTES

1, GEOTECHNICAL TESTING FOR PAVEMENT CONSTRUCTION IS TO BE CARRIED
OUT IN ACCORDANCE WITH SUNSHINE COAST REGIONAL COUNCIL
STANDARDS, TEST CERTIFICATES ARE TO BE PREPARED BY A REGISTERED
N.A.T.A. LABORATORY AT THE CONTRACTOR'S COST AND SHALL BE
PROVIDED TO THE ENGINEER PROGRESSIVELY THROUGH THE WORKS, THE
CONTRACTOR IS TO NOTIFY THE ENGINEER OF ANY NON-CONFORMANCES,
ALL NON CONFORMING WORK IS TO BE RECTIFIED AS DIRECTED BY THE
ENGINEER.

2. FULL DEPTH PAVEMENT CONSTRUCTION SHALL EXTEND BEHIND ALL KERB
AND KERB AND CHANNEL FOR A DISTANCE WHICH IS THE GREATER OF
150mm FROM THE BACK OF KERB OR ACROSS TO THE OUTER LIMIT OF SIDE
DRAIN FILTER MATERIAL,

3. KERB/KERB AND CHANNEL TRANSITIONS ARE TO BE MADE SMOOTHLY OVER
MIN. 1.0m LENGTH,

4, PAVEMENT THICKNESSES NOMINATED ON THESE DRAWINGS ARE
PROVISIONAL. INSITU PAVEMENT SUBGRADE (AT THE UNDERSIDE OF THE
NOMINATED LOWER SUBBASE COURSE WITHIN FILL AREAS, AND TO THE
UNDERSIDE OF THE NOMINATED UPPER SUBBASE COURSE WITHIN CUT
AREAS) TESTING IS TO BE CARRIED OUT BY A REGISTERED NATA,

0.190
fT 200 SERIES H-BLOCK COREFILLED MASONRY
a N16-400 HORIZONTAL, N16-400 VERTICAL

 

_ 5.693

 

GL. 45.20]] |

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

LABORATORY AT THE CONTRACTORS COST AND SHALL BE PROVIDED TO Pa
THE ENGINEER FOR FINALISATION OF PAVEMENT DESIGN (CONTRACTOR IS oT
TO ALLOW 3 WORKING DAYS FOR ENGINEER'S RESPONSE). ig Tae
5,  SUBSOIL DRAINAGE TO BE PROVIDED BENEATH ALL BARRIER AND MEDIAN —_ N See, 3.600m WIDTH FOR ZONE OF INFLUENCE.
KERB. “OL PROPOSED EASEMENT
6. FOR DIGITAL SETOUT REFER TO CONSULTING ENGINEER FOR DATA. — orm
~ 200 AT PIER 4-N16 TOP & BTM N12-450(2L) SHEAR Tp
LOCATIONS 1.400, | TIES WITH N12-226(2L) 100mm EITHER Yn sm
7 SIDE OF PIER pe
——— ‘ “ye ~
PILING, SCREW PIERS OR OTHER is Pp
, DESIGNED, INSTALLED & CERTIFIED BY y
PILING CONTRACTOR Lo Z
00 STEBBING 8 ASSOOIATES PTY LTD ZONE OF NRLUENCE
STRUCTURAL ENGINEERS
&
EXISTING SEWER ZONE OF INFLUENCE
” CUENT DESIGN: DRAWN APPROVED THLE PROJECT NO.
Kecve consti ryit,  KNOBEL CONSULTING PTY LTD | cteve RACKEMANN 1 uF |e ROADWORKS NOTES & SEWER ZONE OF K1595
ENGINEERS - PROJECT MANAGERS —[ppowect CWAAGER- RPO. NABER C535 *— INFLUENCE
SED Ol DWG NO. ISSUE
B | c20609 | TITLE BLOCK AMENDED Phone: 07 8576 4168 6/109 West Burteigh Road ORO ANDA omen nz e
a 27-0505 | ISSUED FOR APPROVAL — Fee O07 S5766477 Burleigh Heads QLD 4220 INE BEACH ' ow. oat a 0 500 1000 1500 z000mm R002 B
wel oe mana = Emak [email protected] ABN 33071 435202 | SUNS! , QLD pigetie Cee ES

 

RP BOUNDARY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

29K 1805 Construction WKY 1525-RO02-B stu, 26/2009 06 AL AM, evant, Vinobalanw'iK_C3E2_CAD

 

Page 84

 

 

PROPOSED
DUPLEX

   

7
OTL008S1
wbEC 22

¥

<< <— <— <—

~~

=
7

“ty

<_ <— <—
f

SF

 

 

 

 

 

%e,

 

|

 

 

 

 

WIRE FILTER CLOTH
TO EACH STAKE

ay

            

ENTRY/EXIT PAD FALLS
'BWARDS ROAD, A BUND IS#
TO BE INSTALLED ACROSS
THE AGGREGATE PAD TO
DIRECT RUNOFF TO
SEDIMENT FENCE

40-75mm CRUSHED ROCK
OR RECYCLED CONCRETE

STABILISED ENTRY/EXIT POINT - TYPE A
NTS

 

DENOTES STABILISED ENTRY/EXIT
POINT, REFER LAYOUT PLAN FOR
LOCATIONS,

 

 

 

SEP

 

} 2500 MAX.

AT 600 CRS \

OR APPROVED EQUIVALENT

 

XOUddY
009

 

SSS SEES

SSeS

 

 

 

PROVIDE WIRE STRAND ~
BETWEEN STAKES FOR
FILTER CLOTH SUPPORT

“4

ELEVATION

 

 

 

fo, gy

Kp

TPM ISIES

PROVIDE TOPSOIL LAYER
OVER FILTER CLOTH FOR
FULL LENGTH OF SILT FENCE

4sFwt

as or

7
&,
2b, ~N
Bs,

J
Sry
a

NE
x

FILTER CLOTH
LAP 100mm

    

 

+

FB

 

 

 

 

SECTION

SEDIMENT FENCE DETAILS

 

LEGEND

—— ss "Sep MENT FENCE
a
———sFw]}+-——_ SEDIMENT FENCE WEIR
> ——» —> ——» TEMPORARY DIVERSION DRAIN

a

STABILISED ENTRY/EXIT POINT

   

CONFINED WASTE DISPOSAL AREA

 

WATER QUALITY MONITORING STATION
’

}

SEDIMENT AND EROSION CONTROL NOTES

1. THE PROJECT SEDIMENT AND EROSION CONTROL DRAWINGS ARE TO BE READ IN CONJUNCTION
WITH THE SITE'S APPROVED STORMWATER MANAGEMENT PLAN.

2. CONSTRUCTION IS TO BE PROGRAMMED TO PROVIDE INSTALLATION OF PERIMETER
LANDSCAPING / SURFACE TREATMENTS AS EARLY AS PRACTICAL.

3. THE CONTRACTOR'S WORKS PROGRAM IS TO BE REVIEWED AT THE PRESTART MEETING.
ALTERATIONS TO THE PROGRAM MAY BE REQUIRED TO ENSURE SATISFACTORY EROSION AND
SEDIMENT CONTROL.

4. SAFETY ISSUES MUST BE CONSIDERED AND MONITORED FOR EACH DEVICE TO THE
SATISFACTION OF THE SUPERINTENDENT.

$5. SEDIMENT FENCE FILTER FABRIC IS TO BE APPROVED BY THE ENGINEER.

6. SEDIMENTATION MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF
CONSTRUCTION ACTIVITIES AND MAINTAINED AT A SUITABLE LEVEL/ CONDITION THROUGHOUT
CONSTRUCTION.

7. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED BY 30%.

8 DRAINAGE STRUCTURE PROTECTION IS TO BE CLEANED FOLLOWING EACH SIGNIFICANT RUNOFF
PRODUCING STORM.

9. ACCESS TO THE SITE IS TO BE PROVIDED BY THE CONTRACTOR. APPROVAL IS TO BE OBTAINED
FROM SUNSHINE COAST REGIONAL COUNCIL FOR THE LOCATION OF THE SITE ACCESS POINT
AND WASH DOWN AREA WHICH IS TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION
PERIOD, ACCESS 70 AND FROM THE SITE IS TO BE VIA THE SHAKEDOWN FACILITY ONLY, ALL
VEHICLES ARE TO BE WASHED DOWN PRIOR TO LEAVING THE SITE.

10, THE CONTRACTOR SHALL PROVIDE TEMPORARY DRAINAGE CONTROLS TO DIVERT FLOW FROM
UNDISTURBED AREAS AROUND DISTURBED AREAS AND DIRECT FLOW FROM DISTURBED AREAS
TOWARD CONTROL DEVICES.

41. PONDED RAINFALL SHALL BE PUMPED THROUGH A SEDIMENT FENCE LOCATED ON THE SITE
BEFORE DISCHARGING INTO THE DOWNSTREAM STORMWATER SYSTEM.

12, STRAW BALES USED IN SEDIMENT DEVICES ARE TO BE REPLACED AFTER A MAXIMUM SERVICE
PERIOD OF 6 WEEKS.

 

REFER LAYOUT PLAN FOR SURFACE

WEIR TO BE 600mm ——}-—————-
TREATMENT AT WEIR OUTLET

WIDE U.N.O. ON
LAYOUT PLAN

 

 

          

 

8

XOudd¥

WEIR HEIGHT TO BE
450mm U.N.O. ON LAYOUT
PLAN

CONSTRUCT WEIR
SIMILAR TO SEDIMENT
FENCE

ELEVATION

NTS

—-— /-— s¥ — DENOTES SEDIMENT FENCE, REFER LAYOUT
PLAN FOR LOCATION AND EXTENTS.

SEDIMENT FENCE WEIR
NTS ——:——]stw -— DENOTES SEDIMENT FENCE WEIR, REFER LAYOUT

PLAN FOR LOCATION AND EXTENTS.

 

 

 

 

 

A 02-06-09 | ISSUED FOR APPROVAL

 

 

 

 

GSUENo | DATE (AMENDMENT

 

fing Pty Lid

KNOBEL CONSULTING PTY LTD

‘CUENT
STEVE RACKEMANN

DESIGN DRAWN
™ EL

 

 

ey

 

 

ENGINEERS - PROJECT MANAGERS

Phone: 07 5576 4168
Fex 07 5576 6477

6/409 West Burleigh Road
Burtaigh Heads QLD 4220
ABN 33.071 435 202

PROJECT
PROPOSED DUPLEX
51 ELANDA STREET,

 

SUNSHINE BEACH, QLD

CWHAGER- RPEO. NUMBER 8538

 

TME
SEDIMENT AND EROSION CONTROL
LAYOUT PLAN & DETAILS SHEET

 

 

SCALE 1125AT AL 0 5 10

02-06-09 OAS et

 

 

 

 

 

‘2AK1S65\Constroction DWGIK L595 SEDO A de, 200612009 7A AR, exert, Tanatbstene OM CS2 CAD

Page 85

 

402

RP48112

 

 

R
it SUMP OVE
(RUN REFER OLTAL

 

300x150
GRATE
Ween 8

 

wos

sh,

382
of RP48112

46
Sse.

   

 

 

 

 

 

 

 

 

 

 

 

 

{ ‘ = RS wo)

 

 

 

 

fom 8)

  

   

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| CONNECT TO EXISTING
COUNCIL PIT AND MAKE i ho wy .
GOOD CONNECTION IL 42.40 / SV SRL
SON
EXISTING 300 PIPE Ny de
Oe
CONTINUES TO. HENDERSON ~ “s,
404 STREET PIPE SYSTEM
RP48112
INTERNAL STORMWATER DESIGN
BY DENNIS CAIRNS & ASSOCIATES
‘CUENT DESIGN DRAWN APPROVED TE PROJECT NO.
an papas KNOBEL CONSULTING PTY LTD | steve RACKEMANN te | eves |—+/ |STORMWATER LAYOUT PLAN
ENGINEERS - PROJECT MANAGERS = maar CRAG APEO RRS Z K1595
Phone: 07 5576 4168 ‘8/109 West Burieigh Road ORO NDA Stee DWG NO. ISSUE
: 51 ELANDA STREET, SOME
mts = ——erv ‘AMEROMENT ” Eat eng@tnobalconait com. BUMRSN 33 074 435 202 SUNSHINE BEACH, QLD = 02-06-09 {eo ata a a Swooi} A

 

‘ZAK 1895 \Construgtion DWGW1S5 SHROT-A dug, 2006/2009 G11 Ad, evant, NenabetsreKN_C352_ GAD

Page 86

 

TSunshi ne Co 2g st DEVE| MENT FEES & CONTRIBUTIONS

lease Retum to Admin Officer, Development)
| Regional Council

    

   

E}||BONDS = Bond Refund Details an

 

Payee Name:
541, Address:

 

 

  
 

Road / Drainage Plan Exam
Road / Drainage Field Inspection 542
Legal Document Examination 543
Sealing Fee - Survey Plans, Legal Documents ; 544
Sale of Documents, Policy Lists, Misc 545 (CALCULATIONS jae
546
588

 

 
 
 

 

 

 

 

 

 

 
  
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

Bonding Admin Fee (Contributions, uncompleted works) Lot Calculation

Closed Circuit TV Inspection

Pre-lodgement Meeting Fee ; 549
{CONTRIBUT { AMOUNT [RECEIPT TYPE] Plan Examination Calculation

Developer Contribution - Landscaping §50

Developer Contribution - Road Other than PSP 583

Developer Contribution - Drainage Other than PSP 554

Developer Contribution - Pathway Other than PSP 685 Inspection Caiculation

Developer Contrib. ~ In Liew O#f St Parking (PSP13 Car parking) 556 ,

Developer Contribution — Other Parks and Community 580 it ROADWORKS\CONTR

ICS - Community Land (Not currently active) 560 Catchment: ~

ICS — Public Transport -|° 561

ICS - Sewerage (PSP Rural) 557 Road/Section:

ICS — Sewerage (PSP Coastal) 613

ICS ~ Sewerage — South Peregian (PSP Maroochy) 681 APPLICATION|DETAILS Sac -
ICS Water Supply (PSF) PayeeName: Chcrtiy Joo Pty Ltd are ihe hantey Three Trust

 

Address:

 

ICS — Sport and Recreation Land (PSP Parks) LC
ICS — Drainage (PSP Noosaville Master & Ward Street)

oo Knobel Chasulling fy Lhe |

 

 

 

 

 

   

 

             

 

 

 

 

 

 

 

ICS — Road (CMRNICP) If BA not entered then use 594.—~* PO Box $89Z

ICS — Pathway (PSP) Bburcéien Henags tg L220

Total of Fees Paid (Excluding Bonds) $ [UG Ss Development ee dle Sreef- Sunshine hoedk
aa ee BS AMOUNT RECEIPT, TYPE! File Numbers or Reference:

Security Deposits/Performance/Maintenance/Uncompleted Works Bon 51 (Cat 9) (4. 2009 -OF68./

. . - Date application properly made: :
Total of Fees Paid (Including Bonds =— 7
(inchuding Bendis) $1403 Receipt No: Ci). | [Recoiptbater 1h {hb

PuLand Development/FEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc

 

at cntaatetmeiiae lassie

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.