Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
Knobel Consulting Pty Lid 17 June 2009 Page 2 of 2 4l Contributions fo be paid by developer. 42-44 To be monitored and controlled as part of construction supervision. 45 To be provided separately. ’ 46-47 Not applicable If you have any queries please do not hesitate to contact us. Yours faithfully TRENT PURDON - Knobel Consulting Pty Ltd Copy - Neil Stebbing Attachment - 3 x Knobel Consulting Pty Ltd, Engineering Drawings (REPQ) 3 x Knobel Consulting Pty Ltd, Stormwater Management Plan (Ref: K1595-0006) IDAS forms Parts A, E and Assessment Checklist Nationat Australia Bank - Payment cheque for submission - $1,403.00. K1595-0012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.