Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA 414 iar of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 19947 No -Gowo4is [Yes If yes, is t is the proposed operational work reasonably necessary | for: (Tick applicable box/es and answer a) and/or (b) below) (i) There The removal, destruction or damage of dead marine wood on unallocated State 2 land, ‘other th than ina (or No oO Yes | wild river area, for trade or commerce ;__ Wile rive e qe 2 fd i (ii) The maintenance of existing structures, including, for example, the following structures, if the CNo |L Yes structures were constructed in compliance with ail the requirements, under any Act, relating to a structure of that type — i + — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and weirs; + — existing drainage structures; L . existing p powerlines or associated powerline infrastructure — | (iii) For educational or research purposes or for the monitoring the impact of development on marine O No | Oy Yes Plants (iv) ) For the construction or placement of structures, ‘including, for example, swimming enclosures, safety | Ono |( Yes signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if - + The extent of the removal, destruction or damage is minor; and + The structures were constructed in compliance with all the requirements, under any Act, relating __ toa structure of that type_ i (v) ‘For the construction of runnels for mosquito control, removal of L _yngbya, seed collection for site fm] No. oO Yes rehabilitation or the coltection of marine plants for fishing bait, or handicraft i. (a)_ If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of Primary Industries and Fisheries (DPI&F) self-assessable code? oO Yes - A permit for that aspect of the operational work is not required. Go to Q4.15 oO No - Goto (b) (b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005? oO No - (Complete Form 1, Part O,) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. O Yes If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005? oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (OPI&F) and, subject to the dectaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If OPIAF is not the Assessment Manager tor the application, the agency has jurisdiction as Concurrence Agency. OONo Ifo, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or infrastructure required to support other development for which a development permit is not required or, if a development permit is required, the permit is held or has been applied for? oO Yes - Unless the application is consistent with any property development plan applying to the land, ie Assessment Manager must refuse to receive it. (Complete Fonn 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries (OPIGF) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. oO No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive tt. IPA schedule 8, part i, table 4, tom 8: IPA, schedule 8. pant 2. table 4, tem 4; Fisheries Reguiation 1995 113A (sei assessable codes): IP Regulation, schedie 2, table 2, item 29: IP Regidation, schedule 1. part 3. table 4, item 8: Fisheries Act 1994, section 76DB (wild river area); Wild Rivers Act 2005, section 43A; relevar wild river deciaration: Wild Rivers Code. Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.