INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 22

 

REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA

 

414

 

 

iar of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 19947
No -Gowo4is [Yes

If yes, is t is the proposed operational work reasonably necessary | for: (Tick applicable box/es and answer a) and/or (b) below)

(i) There The removal, destruction or damage of dead marine wood on unallocated State 2 land, ‘other th than ina (or No oO Yes |
wild river area, for trade or commerce

;__ Wile rive e qe 2 fd
i (ii) The maintenance of existing structures, including, for example, the following structures, if the CNo |L Yes
structures were constructed in compliance with ail the requirements, under any Act, relating to a
structure of that type —
i + — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
+ — existing drainage structures;
L . existing p powerlines or associated powerline infrastructure — |
(iii) For educational or research purposes or for the monitoring the impact of development on marine O No | Oy Yes
Plants
(iv) ) For the construction or placement of structures, ‘including, for example, swimming enclosures, safety | Ono |( Yes
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if -
+ The extent of the removal, destruction or damage is minor; and

+ The structures were constructed in compliance with all the requirements, under any Act, relating
__ toa structure of that type_

i (v) ‘For the construction of runnels for mosquito control, removal of L _yngbya, seed collection for site fm] No. oO Yes
rehabilitation or the coltection of marine plants for fishing bait, or handicraft

 

 

 

 

 

i.

(a)_ If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
oO Yes - A permit for that aspect of the operational work is not required. Go to Q4.15 oO No - Goto (b)

(b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?

oO No - (Complete Form 1, Part O,) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
O Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries
(OPI&F) and, subject to the dectaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If
OPIAF is not the Assessment Manager tor the application, the agency has jurisdiction as Concurrence Agency.

OONo

Ifo, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or

infrastructure required to support other development for which a development permit is not required or, if a

development permit is required, the permit is held or has been applied for?

oO Yes - Unless the application is consistent with any property development plan applying to the land, ie Assessment Manager must refuse to
receive it. (Complete Fonn 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries

(OPIGF) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

oO No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive tt.

IPA schedule 8, part i, table 4, tom 8: IPA, schedule 8. pant 2. table 4, tem 4; Fisheries Reguiation 1995 113A (sei assessable codes): IP Regulation, schedie 2, table 2, item 29: IP
Regidation, schedule 1. part 3. table 4, item 8: Fisheries Act 1994, section 76DB (wild river area); Wild Rivers Act 2005, section 43A; relevar wild river deciaration: Wild Rivers Code.

 

 

Page 38

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.