Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
INTEGRATED PLANNING ACT 1997
WILD RIVER AREA
4.15
Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
lo -Gowa4i6 [J] Yes
If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 [LINo Yes
(i) Animal husbandry activities as defined under the Wild Rivers Act 2005 ONo C1 Yes
If yes to either {i) or (ii) above, is any part of the premises in the wild river high preservation area?
Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
LINo
fino, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
Yes - An application for the operational work will be taken to be not properly made and the Assessmem Manager must refuse to receive tt
oO No - Untess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agriculture. Complete Form 1, Part R fanimal husbandry) Subject to the declaration for the
relevant wild river area, his application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, putt 1, lable 4, item 10: 1P Regulation. schedule 2, table 2, tem 37; Wild Rivers Act 2005, sections 42, 43A,
STATE-CONTROLLED ROAD
4.16
Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No - Endofsection4 [L] Yes
If yes, is the proposed operational work associated with either -
« A material change of use that is assessable under the planning scheme; or LINo (LJ Yes
+ — Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
abutting the State-controlled road
If no, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under
IPA, schedule @ - Answer (a) - (c) below.
(a) Is any of the proposed operational work associated with access to a State-controlled road?
No O Yes - This application must be releuied to the Department of Main Roads (OMR) as Concaence Agency.
(b) Is any of the proposed operational work for filling or excavation?
CINo (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
O No - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
Yes - this application must be referred to the DMR as Advice Agency.
(c) Does any of the proposed operational work invalve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
LINo 0 Yes
If yes, is the operationat work proposed in a future State-controlled road not defined by route?
oO) No - This application must be referred to the Department of Main Roads (BMR) as Concurrence Agency.
C1 Yes - this application must be referred to the DMR as Advice Agency.
IP Regulation, schedule 2 lable 2. item 3.
Page 39
IDAS Assessment Checklist, Version 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.